• Title/Summary/Keyword: Project Plan Variations

Search Result 8, Processing Time 0.027 seconds

The Effect of the Project Plan Variance on Customer Satisfaction: Focus on IT Project Results (프로젝트 계획의 변동이 고객만족도에 미치는 영향: IT 프로젝트 결과 중심으로)

  • Yoon, Hyeong-Seok;Lee, Seouk-Joo;Kim, Seung-Chul;Park, So-Hyun
    • Journal of Information Technology Services
    • /
    • v.21 no.5
    • /
    • pp.51-64
    • /
    • 2022
  • Companies are planning and executing IT projects using information technology as a means to secure external competitiveness. However, IT projects have high risks and uncertainties due to the invisibility of outputs (systems, services, products), and changes in plans frequently occur during project execution. As a result, most IT projects are closed without achieving the target performance. This can lead to a waste of resources and money for the company, which in turn leads to the loss of opportunities to enter new markets. This study intends to analyze the effect of changes in the project plan on customer satisfaction, which is the project performance. Also, we want to find the importance of project planning so that the target performance of the IT project can be achieved. For the empirical analysis of this study, about 500 actual project data were collected. As for the analysis method, statistical analysis such as simple and multiple regression analysis and control effect was performed. Looking at the results of the analysis, it was found that the scope change affects the cost change and the schedule change. Also, changes in scope and cost were found to affect project performance. The theoretical performance of this study proved the theoretical fact that good project performance comes out if the IT project is executed as planned. The practical performance suggested the need for a change in project management by proving that thorough execution of the project planning stage can improve the project performance in the Korean project management culture, where the project planning stage is poorly performed for the rapid implementation of the IT project.

Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time (프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM))

  • Jang, Seong-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.68-74
    • /
    • 2007
  • Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.

  • PDF

Report on Study for Soil Salinity, Plantation and Yields in the Existing Polders (개성간척농지의 토양감도, 재식실적 및 수호량에 대한 실태조사)

  • 박갑성
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.11 no.3
    • /
    • pp.1731-1738
    • /
    • 1969
  • 1. For the purpose of analyzing the plan of new reclamation project and its evaluation, actual studies for the existing polders are required. 2. The variations of the salt content of soil, yields and staus of its plantation have been studied for six areas reclaimed in relatively recent years, including Kangwha, Daechon, Chopo, Eushin, Kwangyang and Chinkyo. 3. The annual yields from the project were only 52 percent in the first year as compared with kilograms per 10 a. in the Hachirogata polder in Japan. 4. Such a low productivity in the existing polders in Korea is chiefly by the high ground water table, unfavourable conditions of subdrainage in the root zone, and saline damages of existing high salt content. That is because the depth of drainage ditches is too shallow and layout distance between every drainage ditches is also too long. 5. In order to overcom such a uncertiainties, the drainagedistance suitable for these areas has been Calculated by using the Donnans formula. Applying to the formula, drainage facilities are so densie that land use capability may be decreased. 6. For the purpose of ensuring the effective desalinization and high land use capability, feasible interval to establish the culvert has been studied in accordance with both formulas of Donnan and Hoogan. 7. In order to accomplish the early desalinization in both areas of new reclamation or existing polders, the problems of internal drainages should be resolved. for this puprose in addition to the endeavour of the personnels actually engaged in such works. The actual support of the related agencies for financial assitance is required.

  • PDF

Data Collection Methodology of Activity Production Rates for Contract Time Determination

  • Huh Youngki;Kim Changwan;Song Jongchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.114-123
    • /
    • 2004
  • Contract time determination for highway construction projects has never been easy despite considerable research efforts from academia as well as industry. High variations in crew production rates are considered one of the main barriers to accurate contract time determination. This paper presents a methodology for collecting field information on crew production rates which will help to enhance the accuracy of contract time determination for highway bridge construction. Based on a standard data collection tool developed, data on field crew production rates was collected from 14 on going projects in Texas, USA, over the past two years. The production rates based on the data collected were considered by industry practitioners to be more realistic and practical than those available to the current practices. As more data becomes available, key drivers influencing production rates could be identified and provide site personnel with a means to better plan and control production in a project specific context.

A Study on Characteristics of Core Projects Described in 3rd Community Health Plans (제3기 지역보건의료계획서에 기술된 핵심사업의 특성에 관한 연구)

  • Kim, Dong-Moon;Lee, Weon-Young;Moon, Ok-Ryun;Kim, Chang-Yup
    • Journal of Preventive Medicine and Public Health
    • /
    • v.37 no.1
    • /
    • pp.88-98
    • /
    • 2004
  • Objectives : The 3rd community health plan let health centers select and promote core projects considering budget and manpower. This study analyzed the content and selection processes of core projects, using the nationwide 3rd community health plans, to give relevant information on health center policies. Methods : Classification criteria for content analysis of core projects were established and verified through a literature review and by specialist discussions. Fifty plans were selected by stratified proportional random sampling for regional characteristics. And coding criteria standardized through coding repetition and discussion, by 2 persons (k>0.7). Using stratified proportional random sampling for 16 cities and provinces, regional characteristics, 117 plans were selected, and the contents of the core project selection processes and program contents analyzed. Results : The survey was used by 59.8 % of samples as a core project decision-making method. The partici- pants included 98.6, 81.4, 40 and 38.6% of the health staffs, residents, medical institutions, and administrators, respectively. Discussion was used by 15.4% of samples. The participants were health staffs by 100% as a great. The ranking of the frequencies of the selected core projects were, in order; chronic disease control, health promotion, elderly health, maternal-child health, and oral health at 16.4, 14.8, 14.3, 12.7 and 11.9%, respectively. Analyses on the chronic disease control and elderly health contents showed the diversity of object disease, high rates of visitors on patient detection programs, high rates of unclear target populations, and the provision of medical exams and treatments as the main services, with high variations in business per-formance. The national health budgets for health centers in 2003 were about 910 and 240 million won for chronic disease control and elderly health, respectively, which were less than for the other five priority core projects. Conclusions : The chronic disease control and elderly health at the health centers were not standardized for object disease, patient detection program, target population, service provision, and national support budget was insufficient. Thus it is necessary to develop standard guidelines, and increase financial support, for chronic disease control and elderly health

A Study on the Performance Analysis of Environmental Improvement Fund for the Structural Advancement Project of the Old Industrial Complex (노후산업단지 구조고도화사업을 위한 환경개선펀드 성과분석에 관한 연구)

  • Kim, Jongha;Chung, Jaeho
    • Land and Housing Review
    • /
    • v.11 no.3
    • /
    • pp.21-31
    • /
    • 2020
  • This paper quantitatively analyzes the investment performance of the environmental improvement fund focusing on the sales effect and the housing benefit effect. The analysis of this study focused on the effects of sales and housing benefits for completed business sites among the business sites supported by the Environmental Improvement Fund. The analysis results are as follows. First, it appears that the sales effect of the completed workplace is effective compared to the amount of investment, so it seems that the purpose of industrial integration of the environment improvement fund is being achieved. Second, it was found that there are variations by workplace and region in housing benefits. This seems to be due to the fact that profitability can be neglected by reflecting the characteristics of residential facilities built by private businesses. The Environmental Improvement Fund is a policy fund that pursues both profitability and publicity. Therefore, it is necessary to transform the structure of the fund to expand support for industrial infrastructure with high publicity. To this end, it is necessary to establish a long-term management plan that equitably considers the profitability and publicity of the environmental improvement fund.

Formal Validation Method and Tools for French Computerized Railway Interlocking Systems

  • Antoni, Marc
    • International Journal of Railway
    • /
    • v.2 no.3
    • /
    • pp.99-106
    • /
    • 2009
  • Checks and tests before putting safety facilities into service as well as the results of these tests are essential, time consuming and may show great variations between each other. Economic constraints and the increasing complexity associated with the development of computerized tools tend to limit the capacity of the classic approval process (manual or automatic). A reduction of the validation cover rate could result in practice. This is not compatible with the French national plan to renew the interlocking systems of the national network. The method and the tool presented in this paper makes it possible to formally validate new computerized systems or evolutions of existing French interlocking systems with real-time functional interpreted Petri nets. The aim of our project is to provide SNCF with a method for the formal validation of French interlocking systems. A formal proof method by assertion, which is applicable to industrial automation equipment such as interlocking systems, and which covers equally the specification and its real software implementation, is presented in this paper. With the proposed method we completely verify that the system follows all safety properties at all times and does not show superfluous conditions: it replaces all the indoor checks (not the outdoor checks). The advantages expected are a significant reduction of testing time and of the related costs, an increase of the test coverage rate, an answer to the new demand of railway infrastructure maintenance engineering to modify and validate computerized interlocking systems. Formal methods mastery by infrastructure engineers are surely a key to prove that more safety is not necessarily more expensive.

  • PDF

Monitoring Variation of Tidal Channels associated with Shihwa Reclamation Project using Remote Sensing Approaches (원격탐사기반 시화호 간척사업과 갯골변화 관찰)

  • Park, Chanhyeok;Yu, Jaehyung;Kim, Jieun;Yang, Dong-Yoon
    • Economic and Environmental Geology
    • /
    • v.52 no.4
    • /
    • pp.299-312
    • /
    • 2019
  • This study analyzed variation of tidal channels associated with Shihwa reclamation project for corresponding observation period based on remote sensing approaches. The project period was subdivided to developing period, closed period, and open period based on developing and management plan of Shiwa lake, and number, length, width, and direction of tidal channels for each period were analyzed using CORONA, Landsat 5 TM, Landsat 7 ETM+, and orthorectified aerial photographs. Number of tidal channels decreased from developing to opening period while $3^{rd}$ order channles did not show noticeable changes. The length of tidal channels decreased during developing to closed period, and increasing trend of $2^{nd}$ and $3^{rd}$ order channels was observed for the opening period. The average widtrh of $2^{nd}$ and $3^{rd}$ order channels decreased from developing to closed period, and increased during open period. The direction of tidal channels showed NW and NE direction in general, while the rose diagram showed deacrased frequency of NE direction and increased frequency of NW direction during the open period. These variations in tidal channels are considered to be related to changes in tidal energy environment, where stable energy environment before the project was changed to disconnection of tidal energy by closed environment, and re-connection of the energy during the open period.