• Title/Summary/Keyword: Project Plan

Search Result 2,080, Processing Time 0.027 seconds

The Introduction of Converter Station Construction for HVDC Link Project between Jindo and Jeju (진도~제주간 직류연계 사업을 위한 변환소 건설 개요)

  • Lee, Jong-Seok;Moon, Bong-Soo;Kang, Won-Tag;Kim, Kyeong-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.357_358
    • /
    • 2009
  • According to the 4th BPE(Basic Plan for long-term Electricity Supply and Demand), Electricity demand of Jeju island in 2012 will be reached to 682MW. Jeju island will be faced with severe shortage of electricty, also needed to find transport route to supply green energy which will be made from "Carbon free island" energy policy toward land at that time. For that reason, The plan which construct 400MW size HVDC connection line was decided for potential supply stabilization and transportation of green energy. KEPCO organized special construction office not only to observe the successful project completion which aims 2011 December but also to build up professional manpower. KEPCO is putting spur to the HVDC project these days. Construction site of converter stations has been already confirmed and contracts of cable, converter have done as per turn-key early this year. On this report, we would like to discuss about project scheme, main characteristics of system, and the furture progress plan of "Jindo~Jeju HVDC construction project expecially converter station part" which is being pushed by KEPCO.

  • PDF

INTRODUCTION OF THE SIMC PROJECT

  • Chae, Gee-Ju;Cho, Seong-Ik;Park, Jong-Hyun;Jo, Kwan-Bok
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.356-359
    • /
    • 2006
  • The high prices and lack of information for satellite images prevent researchers from studying remote sensing and most non-professional people can't have the simple and easy solutions for the manipulation of satellite images. 'Satellite Imagery Information Management Center'(SIMC) project which is promoted by ETRI (Electronics and Telecommunications Research Institute) from 2002 to 2005 in Korea have the purpose to provide the satellite images freely to the public domain and the solutions for the above mentioned problems. Our project have the following five systems; Data Acquisition System, Data Preservation System, Integrated Solution System, Technology Development System, Operation Plan System. Data Acquisition System collects the satellite images such as LANDSAT, IKONOS, etc. Data Preservation System consists of database which registers the diverse satellite images. Integrated Solution System gives the user of public domain for the web service which search, order and transfer the satellite images. Technology Development System has the many processing technologies for the satellite images. Finally, the Operation Plan system has the role to plan the future of our SIMC project. In this paper, we will give the result of SIMC Project for each five systems during the fast four years from 2002 to 2005.

  • PDF

A Study on the Simple Criteria to distinguish being or not facilities of Consultation about Energy Use Plan (에너지사용계획 협의대상 시설여부를 판별하기 위한 간편한 기준에 관한 연구)

  • Suh, Kwang-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.10
    • /
    • pp.4704-4710
    • /
    • 2011
  • In order to set the simple criteria to distinguish being or not facilities of Consultation about Energy Use Plan, data analysis and case analysis were carried out. This paper proposes that building, one of the facilities, is being object of the Consultation about Energy Use Plan when in the public project, its gross area is more than 75,000 $m^2$ or main transformer capacity is more than 9,000 kVA and when in the private project, its gross area is more than 100,000 $m^2$ or main transformer capacity is more than 11,500 kVA. Also shows that factory, another of the facilities, is being object when in the private project, its main transformer capacity is more than 6,000 kVA or boiler capacity is more than 24 ton/h and when in the public project, its main transformer capacity is more than 3,000 kVA or boiler capacity is more than 12 ton/h.

A Study on Reset of Examination Criteria for Energy Use Plan by Projet Sector (사업 분야별 에너지사용계획 검토기준 재설정에 관한 연구)

  • Suh, Kwang-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6581-6589
    • /
    • 2013
  • This study reset the Examination Criteria for Energy Use Plan by the project sector so that the Consultation about Energy Use Plan would play an effective role in reaching the National Energy Policy Issues, and to prevent complaints from the superintendent of the project & agent engaged in the project. To achieve this aim, consultation case analysis was carried out from 2001 to 2010 and the National Energy Master Plan was reviewed. The predicted effect of energy savings calculated by reset Examination Criteria on the $1^{st}$ energy demand target at 2030 was 2.5%, the effect of new and renewable energy utilization on a new and renewable energy supply target at 2030 was 3% and the rate of $CO_2$ reduction to greenhouse gas emission BAU at 2020 was 1.1%.

Site and Erection of the Government Complex Seoul in Capital Seoul (수도 서울에서 정부종합청사의 입지와 건립)

  • Lee, Sumin;Woo, Don-Son
    • Journal of architectural history
    • /
    • v.27 no.2
    • /
    • pp.51-62
    • /
    • 2018
  • This study examines the site and erection of the Government Complex Seoul which was a project attempted to assemble dispersed government buildings in a certain place. The study focuses on the fact that the project is situated between the 1960s' making of capital Seoul and Seoul urban planning, and the way how the project achieved symbolism in capital Seoul. The project, one of the 1960s' Major Government Buildings, led both plan of capital Seoul and transforming city Seoul. The 1960s' Major Government Building Plan had identical drive with the 1950's Major Government Building Plan, however the 1960s' had additional layer: Seoul urban planning. After restoration of the Capital building, Sejongro the capital street was planned to the site arranging government offices. The Government Complex Seoul was set to be a modern building on a site with historical context according to the plan. Because of the site, the Government Complex Seoul was constructed in aware of other buildings that represented a competitive high-rise atmosphere in the late 1960s, including the Capital building nearby. PAE International's plan was completed through a series of design modification, and it boasted a vertical aspect, unlike the horizontal-looking plan that was already won after the design competition. The Government Complex Seoul tried to acquire the symbolism in the central space of the capital Seoul and high-rised city Seoul. "The new construction method" was a requirement to achieve the height.

A Case Study on Information Strategy Plan of the Web Based on Project Management Information System for Construction Company (전사 웹기반 사업관리시스템 구축을 위한 정보화전략계획에 관한 사례연구)

  • Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.259-267
    • /
    • 2008
  • Nowadays PMIS (Project Management Information System) based on web is widely applied to communication, collaboration and community in construction jobsite for various organization such as subcontractors, general contractor, engineering company, supervisors and client. However, individual PMIS in jobsite is prone to be troublesome issue for integration and exchange of information regarding project management in corporate and may result in conflict of data application. The main reason should be lack of information strategy plan such as company master plan for information. This research shows a critical success factor that a big construction company of Korea establishes procedure and method for information strategy plan. In addition, It is to suggest how to be implemented PMIS architecture and execute business process innovation in corporate level. This research expects contribution that many construction companies reduce mistakes to be implemented management information system and to optimize system in corporate level.

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

A Study on Maintenance Actual Condition and Revitalization of Rural Development Project (일반농산어촌개발사업 완료지구 시설물 실태분석 및 활성화 방안 연구)

  • Choi, Young-Wan;Kim, Keun-Ho;Eun, Hee-Chang;Lee, Young-Kyu;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.2
    • /
    • pp.1-8
    • /
    • 2016
  • This study is intended to prepare an revitalization plan of region where rural development project is completed through an analysis of the actual condition of facility operation and maintenance in the region where the project is completed. The results of survey of actual condition of facility operation in the region where rural development project was completed showed that the facilities were not self-sufficient in terms of operation and maintenance cost. Therefore, a prerequisite to the revitalization of region where the project is completed is to prepare an alternative plan for increasing the efficiency and applicability of currently already prepared facilities. Second, a project operation organization system should be streamlined and the competency of operation personnel should continue to be strengthened. Third, it is necessary to prepare a support system and establish cooperation networks for increasing the extensibility of project and continuing to induce community revitalization in the region where the project is completed in the future.

A Study on the Classroom Space Planning through User Participation Design - Focusing on the case of School Space Innovation Project in Incheon - (사용자 참여설계를 통한 교실공간계획에 관한 연구 - 인천광역시 학교공간 혁신사업 사례를 중심으로 -)

  • Son, Suk-Eui;Kim, Seung-Je
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.28 no.4
    • /
    • pp.11-17
    • /
    • 2021
  • This study is aimed at presenting an efficient management plan of user participatory design in a situation where the School Space Innovation Project is in progress. 2 schools that were the targets of the Incheon School Space Innovation Project in 2019 were selected for this, and features such as the physical environment of that classroom, classroom usage plan, and the stepwise outcome of the user participatory design workshop were contemplated. Especially the workshop outcome was compared and analyzed quantitatively, focusing on the actual master plan and zoning plan, in order to identify the feature that opinions of various users are reflected on the actual plan. As a result, the following conclusion could be reached. Firstly, it was confirmed that the expression about the user preferential space influences the classroom usage plan of that classroom. Vague expressions about the whole space held a large majority of the objects for the linguistic expression of the preferential space. The expression mode as limited as the expression of the actions that users want to carry out in the space. On the other hand, when the usage purpose of the classroom was definite, it was confirmed that the demand for furniture·facility is relatively high. Secondly, according to the analysis of zoning for each function, it seems that the stereotype, which is arranged on the basis of the chalkboard at the front of existing classrooms, was applied in the case of the learning zone. However, in cases of other functions, a tendency was identified that the user carries out an image description that reflects the physical features of the space. Sufficient preparation will need to precede for the efficient management of the user participatory design workshop and the acceptance of various opinions. It seems that especially the classroom usage plan, number of workshops, consultation of each step, and the education about the space expression mode affect the master plan.

Project Schedule Risk Assessment Based on Bayesian Nets (베이지안넷 기반의 프로젝트 일정리스크 평가)

  • Sung, Hongsuk;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.