• Title/Summary/Keyword: Project Plan

Search Result 2,103, Processing Time 0.03 seconds

A Reformation Proposal of Rural Empty Homes Strategies (선진사례에서 본 농촌빈집정비사업의 발전방향)

  • Choi, Soo-Myung;Han, Kyung-Soo
    • Journal of Korean Society of Rural Planning
    • /
    • v.8 no.1 s.15
    • /
    • pp.85-93
    • /
    • 2002
  • This study aimed at proposing policy improving directions of the rural empty homes grant scheme in Korea. The implementation procedures and results of the relevant schemes/projects on optimum use of rural empty homes at home and abroad were reviewed by literature and internet searches. From the reviewing results, a tentative set of policy directions for project improvement were proposed: extention of project scope to all the redundant resources, dual focussing of project objectives on housing innovation and economic regeneration of communities, and systematization of project plan and implementation especially in the statutory aspects.

A Railway Construction Efficiency Plan by Using Project Management Information System (프로젝트정보관리시스템을 활용한 철도공사 효율화 방안)

  • Lee, Tai-Sik;Park, Jang-Hee;Kim, Young-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1532-1537
    • /
    • 2004
  • Downtown traffic culture of the car focus of our country have developed. But, it was been interested in railroad to saturation of situation, environmental problem. Also, it is getting interest which is international by departure point of network connecting from Europe to Northeast Asia. Private capital project of railroad is activated but Construction companies payability is real that is worsen day by day. Therefore, Construction companies is destroying element enterprise's inefficiency and the waste, be interested in Project Management Information System as part of information. I wish to approach in efficiency of railway construction by presenting professional construction company's Project Management Information System.

  • PDF

Development of a Construction Performance Causal Map Using System Dynamics (시스템 다이내믹스를 이용한 건설성과 인과지도 개발)

  • Kang, Jin-Young;Park, Hee-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.63-68
    • /
    • 2009
  • Construction Performance measurement and management has been interested by construction practitioners. However, current construction project management practices are related to short-term improvement plans rather than long-term and systematic approaches based upon performance analysis. AR a result, there is a need for developing of a collaborative plan over project life cycle. Therefore, this paper reviews extensive literature and proposes the construction performance estimating model using a system dynamics. The paper proposes casual maps for planning, design, procurement, and construction phases. Each casual map includes all performance indicators and factors that impact on performance directly or indirectly. These casual maps that were developed by system thinking will enhance the understanding of the relationships among performances and factors. After further data gathering, these models can be used to estimate construction performance and eventually these will save project costs and shorten project schedule.

A Study on the Construction of Urban Regeneration Database for Urban Regeneration Project (도시재생사업을 위한 도시재생 DB 구축에 관한 연구)

  • Cho, Byung Ho;Lim, Young Teak;Choi, Bong Moon
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2008.05a
    • /
    • pp.453-457
    • /
    • 2008
  • In this study, we suggested the specifical DB construction that was classified by Urban Regeneration Project through reviewing act related the Urban Regeneration. The DB of Urban Regeneration will be helpful for assisting and managing of Urban Regeneration Project. For this, we examined act & plan for the urban regeneration and deduced the demanded index of the project, in the result, we suggested DB build method. We expect that support and management for urban regeneration through presented index in this study.

  • PDF

A CP-BASED OPTIMIZATION MODEL FOR CONSTRUCTION RESCHEDULING PROBLEMS

  • Shu-Shun Liu;Kuo-Chuan Shih
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.941-946
    • /
    • 2005
  • It is essential for project managers to make schedule adjustment based on their professional experience, in terms of rescheduling action discussed in this paper. This paper discusses the topics of resource-constrained construction rescheduling by modifying the concepts of manufacturing rescheduling. Moreover, the influence factors of construction rescheduling problems are investigated and identified in this paper. According to initial schedule plan and present progress, a new rescheduling mechanism based on Constraint Programming (CP) techniques is developed to reschedule projects with the objective of minimizing total project cost or duration, under three rescheduling policies. Through case study, the behavior of three different rescheduling policies is analyzed and discussed in this paper.

  • PDF

Research on the Plans of Construction Information for National Infrastructure in Public Construction Projects (공공건설사업에서의 국가기반시설 건설정보 서비스 방안에 관한 연구)

  • Ok, Hyun;Kim, Jin-Uk
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.12
    • /
    • pp.1026-1035
    • /
    • 2013
  • The construction field is implementing cost savings and business process improvements by adopting and applying various information technologies to secure the construction sector's technological competitiveness amid the economic recessions inside and outside South Korea. Therefore, affiliated agencies of the Ministry of Land, Infrastructure, and Transport are reinforcing transparency and efficiency in construction project management through informatization. These agencies are also performing construction project management and maintenance and management businesses by constructing various information systems to create higher added values and secure competitiveness. However, as the application of the constructed information system is limited to a portion of public construction projects, it is not yet possible to understand the whole status of the national infrastructures. Therefore, this paper aims to propose a construction information service plan, its future promotion method and procedure of application on the entire national infrastructures. This plan would be carried out by collecting, linking and fabricating the main construction information from the information systems of the affiliated agencies around the construction project information system(Construction CALS System) being applied at the organizations under the Ministry of Land, Infrastructure, and Transport. Such a plan is expected to facilitate effective project management and maintenance of public construction projects and serve as a useful tool for major decision making endeavors such as future policy planning. The proposed plan is also expected to facilitate the management and application of construction information from the construction up to the maintenance management of the national infrastructures.

Human Life in Saemangeum after Reclamation (새만금 간척사업 후 주민의 삶)

  • Hahm, Han-Hee
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.13 no.4
    • /
    • pp.313-326
    • /
    • 2010
  • This paper explores the changing aspects of the fishing village and fishermen since the beginning of the Saemangeum Reclamation Development Project in 1991. The Saemangeum Project was neither appropriate nor effective because it adopted an outdated development policy. It should have been obvious that as a result of the Project, tideland where various kinds of clams, crabs, oyster, and many other marine resources live would be lost. The fishermen in the affected area have suffered various hardships. The most acute problem at present is the disappearance of their subsistence activity that threatens their families' survival. Facing the crisis, they view fishing as their most valuable resource. Overlooking the Saemangeum Lake which is newly formed, they view the sea and tideland as their treasure boxes or bank deposits. From the beginning until now, the government did not pay attention to the concerns of the fishermen and their communities. It was an outcome of the typical top-down bureaucratic decision making. Until recently the government has persisted in its position that the primary goal of the reclamation project was to increase agricultural land. In July 23, 2009, the government suddenly announced the new Saemangeum development plan. The new plan focusing on the industrial city complex was quite different from the old plan. Regardless of the revised plan the lives of the villagers in the coastal areas have already been significantly altered. Most villagers no longer depend on fishery. Many have already left their homestead and moved away in order to search new jobs or find another coastal area where they can continue their fishing.

측지 VLBI 구축 타당성 조사 및 기본계획수립을 위한 연구 (1)

  • 김두환;양인태;이석배;배민수;이진우;곽영희;이원국;이영균
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.11a
    • /
    • pp.17-22
    • /
    • 2004
  • This research peformed 'Study for Investigation for propriety of constructing geodetic VLBI and Establishment of the fundamental plan' as a project commissioned by National Geographic Information Institute. In this presentation, 1 will talk about the research results of propriety investigation for geodetic VLBI and SLR. I would like to present the results of the establishment of the fundamental plan for geodetic VLBT afterwards.

  • PDF

Reliability Sampling Plans for Lot Assurance (신뢰성 로트보증 샘플링 검사방식)

  • 김종걸;전봉룡
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.05a
    • /
    • pp.145-151
    • /
    • 2004
  • Reliability assurance problem is an important issue in advanced company with good R&D capacity. In Korea, long-term and large-scale project for reliability improvement and certification have been conducted from 2000, 4 years ago. Generally, assurance is composed of system assurance and lot assurance. For reliability lot assurance. it is prerequisite to development reliability sampling plan with time-saving and minimum cost. In this paper, we aim to investigate previous study on reliability lot assurance focused on reliability sampling plans and propose some suggestions for the future study.

  • PDF

A Plan on the Applicability of Concept & Symbolism in the Interior Design - SuWon BukBu Community Church Remodeling design - (개념과 상징성을 적용한 공간계획 - 수원 북부 교회 리모델링계획 -)

  • Song, Choon-Eui
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2005.10a
    • /
    • pp.207-208
    • /
    • 2005
  • This plan is to express a Image and Symbol in the Church Architecture by analogy and metaphor. The Church was spiritual sympathy of the god and a human being. So, symbolic image is important in church architecture at present. These symbolize express to wishful message, persecution, miracle and Noah's Ark. In this project, meaning is transmitted to through with analogy.

  • PDF