A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

A Study on The Prior Environmental Review System in a Costal Improvement Project (연안정비사업의 사전환경성검토 방안에 관한 연구)

  • Maeng, Jun-Ho;Cho, Kwang-Woo
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.2
    • /
    • pp.179-187
    • /
    • 2010
  • A costal improvement project is designed for preventing disasters on the coast, improving costal environment, and promoting costal functions, so it is different from the one for developing coasts. However, the costal improvement project also affects the surrounding environment and it may damage the costal environment in some cases. In line with this, this study was carried out to provide the guideline to the review on environmental conditions, which should be performed in the stage of establishing the plan for a costal improvement project, so that the influence affecting marine environment can be reduced and more efficient coastal project can be planned. The costal improvement project is different in the degree of affecting the costal environment according to kinds, scales, and regions. Accordingly, in this study the state of the coastal improvement project and involved problems were analyzed. The prior environmental review system was divided into a seawall-installation project, a marine construction such as the installation of submerged breakwater and jetties, and a project for creating water-friendly coast including a park without marine landfill. The main items for reviewing these specific projects were presented.

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

Site Analysis and Improvements on Pilot Project of Core-Based Residential Environment Improvement (거점확산형 주거환경개선 시범사업 실태조사 및 개선방향 연구)

  • Paik, Hae-Sun;Lee, Young-Hwan;Kim, Jae-Seung
    • Journal of the Korean housing association
    • /
    • v.27 no.4
    • /
    • pp.1-11
    • /
    • 2016
  • This study aims to find out the cause of delay by analyzing the process of 12 Core-based Improvement pilot projects, especially focused on lands, buildings, population status. For this purpose, it performed a literature research on maintenance plan reports, various statistics of building and population status analysis, a field research and an individual interview with public officials in charge at local governments of 12 project districts. The findings are as follows; 1) it was difficult to cope flexibly to environmental changes because the core sector was so large that the plan was led to areal improvement. 2) the project was selected without reflecting the characteristics of the core sector and the area of residents-led renovation properly in terms of building status such as building density and old buildings ratio, 3) the coordinator group for socially disadvantaged class in the district was not operated and thus foundation for residents-led renovation was not set up. In conclusion, it should be presented the proper size of the core sector when the core-based residential environment improvement project is initiated in the future. In addition, building status is taken into consideration when designating the core sector and the area of residents-led renovation. The coordinator group needs to be operated from the early stage of the project as well.

Analysis of Local Community Spaces Bringing Empty Homes back into Use - Focused on Empty Home Utilization Project of Nam-Gu, Incheon (빈집을 활용한 지역사회 거점공간 분석 - 인천시 남구 공가활용사업을 중심으로)

  • Park, Hae-sun;Eun, Nan-Soon
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.23 no.4
    • /
    • pp.55-65
    • /
    • 2017
  • Purpose: This study is to identify the implications and improvement solutions to plan the local community spaces bringing empty homes back into use that fit for regional characteristics, by analyzing the Empty Home Utilization Project implemented in Nam-gu, Incheon. Methods: Among 20 homes sponsored by the Project, five homes being currently operated were analyzed in depth, and features of exterior and interior spaces, and operational characteristics of the subject homes having been renovated through the project sponsorship were examined. Results: A plan is being established to systematically manage deserted or empty homes by assigning classification to each home in Nam-gu, Incheon and they are being utilized as a community space, a place of business or a cultural art space. Most of the physical improvements only included minor repairs such as redoing interior finish, as no major renovation was implemented including layout change and wall removing. Absence of major changes including improvement of house structure resulted in problems regarding accessibility and safety. Also, there was a limit to utilize the spaces only with support on physical improvement cost for empty homes, and it was identified that positive support for renovation should be conducted in accordance with its uses for the purpose. Implications: To complete the Empty Home Utilization Project successfully, it is most critical to reflect the resident opinions and demands, and discover local operators. Furthermore, for sustainable operation of local community space, additional plans for support would be required including financial support and training local leaders, consulting support for operation, encouraging community participation, and connecting with neighbor community.

A Study on the PR Method of Cadastral Re-survey Project Using Hutton's PR Model (허튼(Hutton)의 PR모델을 이용한 지적재조사 홍보 방법)

  • Park, Kwang-Soon;Hong, Sung-Eon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.3
    • /
    • pp.684-694
    • /
    • 2009
  • This study is aimed at looking into the PR method of cadastral re-survey, and at looking for the reason of the delay of cadastral re-survey project. We thought that the reason why the cadastral re-survey project was delayed was a lack of a national agreement on it owing to an insufficient PR. So, to solve this question, we proposed an alternative plan for the PR method of cadastral re-survey, using Hutton's PR model. As a result of a study, a total of 31 PR methods was made which were apt for every practical PR on the basis of 6 three-dimensional models of PR practice. But, some of Hutton's PR models proved to be unfit for the cadastral re-survey project. Therefore, we formed and proposed a new model to apt for the cadastral re-survey project. The result of this study is expected to be of help in getting a foundation to form a national agreement on the quick operation of a upcoming cadastral re-survey project.

INTRA-AND INTERGOVERNMENTAL INFORMATION SYSTEM TO MANAGE INFORMATION IN URBAN RENEWAL PROJECT

  • Dong-bum Kim;Jin-Won Kim;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.561-566
    • /
    • 2011
  • In general, the early stage of urban renewal such as preparing a master plan and processing administrative works including planning permission are conducted by local governments in Korea. The local governments need to review the status of projects that are undergone in other local governments' territories. However, no integrated information system to manage information to this end at the level of nation exists in Korea. If the system would be developed, it may support central government to obtain information on required resources at the national level. In addition, local governments can gain guidance on the process and recognize potential problematic situations from others experience. The system should include functions to collect data on project summary, cost and schedule of projects according to local governments. The expected effects from using the information system are as following. First, information generated from project practice become more credible on account of management at the national level. Because the authorized party such as system administrative agents of governments are responsible for collecting and managing data. Second, the unified information system with no regard to the place where projects progresses reduces the efforts for accumulating reference data for aiding local governments decision making by providing appropriate information timely. Also, enhanced information accessibility for stakeholders make the project process clear. Finally, oversight management is enforced with visualization technology adopted in the system, presenting master plan and mass model including information on usage by floors and progressing information graphically. Ultimately, potential challenges can be anticipated by considering records accumulated from other local governments' projects. This paper presents concept, functionalities, and architecture of information system enabling to manage data from individual projects and aggregate those for oversight management for local and central governments. As a part of systems analysis, general requirements of briefing system for governments and necessary data fields to this end are identified.

  • PDF

Initial Stage of Plan for Urban Residents Participation Community Garden (도시 내 주민참여형 커뮤니티 가든 계획의 초기단계에 관한 연구)

  • Park, Eun-Ji;Lee, Yeun-Sook
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2011.04a
    • /
    • pp.135-140
    • /
    • 2011
  • Recently, people aim for a healthy environment which enhances quality of life, and also there are communication in green space like therapy garden and weekend farm growing. Meanwhile, in Korea, administrative organizations have leaded to plan and proceed in reference to physical regeneration in local areas, and this had caused social and maintenance problems. The purpose of this study was to introduce a concept of community garden which is regarded as green and community space and to insist on a way of residents participation on plan for community garden and its necessity. For that, there were five ways of residents participation on plan for community garden based on literatured and theoretical contemplation and case studies, and these were subject to construction project of community garden in deteriorated area in Jeonju city. This study can provide improvement guidelines for the initial stage of plan for residents participation community garden.

  • PDF

Gap Between Rural Village Planning and Implementation - Focused on Unique Experience Village, Seochon - (농촌마을계획과 실행의 차이 분석 - 충남 서천군 이색체험마을 사례를 중심으로 -)

  • Jung, Hui;Kim, Hye-Min
    • Journal of Korean Society of Rural Planning
    • /
    • v.13 no.3
    • /
    • pp.91-101
    • /
    • 2007
  • Recently the number of rural development plans are increased and projects supported by government are various. These makes rural plans important. But there are many gaps between proposed plan and implementation. These gaps were wasteful in terms of resource management. This study examines differences between plan and implementation and the reasons why they are occurred. For this purpose, we did a case study which is focused on the four-year implementation of 2004-2006 "Unique Experience Village Master Plan" of Seochon, Chungbuk. As a result, we verified facts of gaps and causes, and two major causes were detected : one is the absence of operating and managing body(such as promoter of project, village leader, residences), and the other is inadequate master plan.

Implementation and Significance of Market Modernization Plan in Seoul, 1967-1973 (1967-1973년 서울의 시장 현대화계획의 시행과 의의)

  • Park, Ilhyang
    • Journal of architectural history
    • /
    • v.30 no.1
    • /
    • pp.19-32
    • /
    • 2021
  • The markets are the basic urban facilities for maintaining daily life. Although the urban structure changed rapidly and the population quickly concentrated in the city, the markets remained traditional and backward. To solve various problems in the small excess markets, the Seoul Metropolitan Government had pushed ahead with the market modernization plan since 1967. The purpose of this study is to analyze the process of establishing the market modernization plan and the progress of this project, and to identify the historical meaning of this plan. The results of this study as follows; The market modernization plan aimed to modernize market operation system as well as buildings, and the Government was able to achieve its first goal by enforcing the construction of high-rise buildings, as the markets were newly built with the relatively large scaled fireproof structures. Despite its various limitations, these markets were also regarded as the model of the modern market.