• Title/Summary/Keyword: Project Phase

Search Result 1,146, Processing Time 0.026 seconds

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.

3D Digital Design Optimization Process Considering Constructability of Freeform Structure (비정형 구조물의 시공성을 고려한 3차원 디지털 설계 최적화 프로세스)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.35-43
    • /
    • 2013
  • Nowadays the widely used media in architecture include visualizations, animations and three-dimensional models. 3D digital methods using active CAM(Computer Aided Manufacturing) and CNC(Computerized Numerical Control) imaging have been developed for accurate shape and 3D measurements in freeform buildings. In contrast to a conventional building using auto CAD system and others, the proposed digital optimization method is based on a combination of 3D numerical data and parametric 3D model for design and construction. The objective of this paper is therefore to present digital optimization process for constructability of freeform building. The method can be useful in the effective implementation of an error-proofing process of freeform building during design and construction phase. 3D digital coordinate data can be used effectively to identify correct size of structural and finish members and installation location of each members in construction field. In addition, architects, engineers and contractors can evaluate design, materials, constructability and identify error-proofing opportunities. Other project participants can also include representatives from all levels of management, departments as well as workers and key subcontractors' personnel, if necessary. The 3D digital optimization process is therefore appropriate to serious variations in freeform shape. For future study, the developed digital optimization method is necessary to be carried out to verify the robustness and accuracy for constructability in construction field.

Dashboard Design for Evidence-based Policymaking of Sejong City Government (세종시 데이터 증거기반 정책수립을 위한 대시보드 디자인에 관한 연구)

  • Park, Jin-A;An, Se-Yun
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.12
    • /
    • pp.173-183
    • /
    • 2019
  • Sejong, Korea's special multifunctional administrative city, was created as a national project to relocated government ministries, the aim being to pursue more balanced regional economic development and boost national competitiveness. During the second phase development will focus on mitigating the challenges raised due to the increasing population and urbanization development. All of infrastructure, apartments, houses, private buildings, commercial structures, public buildings, citizens are producing more and more complex data. To face these challenges, Sejong city governments and policy maker recognizes the opportunity to ensure more enriched lives for citizen with data-driven city management, and effectively exploring how to use existing data to improve policy services and a more sustainable economic policy to enhance sustainable city management. As a city government is a complex decision making system, the analysis of astounding increase in city dada is valuable to gain insight in the affecting traffic flow. To support the requirement specification and management of government policy making, the graphic representation of information and data should be provide a different approach in the intuitive way. With in context, this paper outlines the design of interactive, web-based dashboard which provides data visualization regarding better policy making and risk management.

A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge (교량의 유지관리를 위한 BIM기반 자산관리 모델 개발에 관한 연구)

  • Kang, Jong-Min;Lee, Dong-Youl;Park, Jong-Bum;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.3-11
    • /
    • 2012
  • The most of domestic bridge has an used life under 30 years, Future maintenance budgets can be expected to increase. However, because of bridge maintenance budgets are limited, demand for asset management being performed to achieve required performance within available budget is increasing. To perform effective asset management of bridges should be made the best use of information to occur in all phase of construction project. Therefore, the development of system and DB is required to support asset management by effective information management. The objective of this study is the development of the BIM-based bridge asset management model. Through previous research survey, BIM capabilities and asset management components were established and mutual linkages were examined. Bridge asset management model was composed of alternate assessment model. In addition, BIM-based asset management model was performed case studies to verify feasibility and applicability. The proposed model can be applied to a current bridge maintenance procedures and supported to perform effective bridge maintenance tasks within a limited budget.

GIS 데이터구축 감리와 검수 프로그램

  • 조윤숙;박인만;정필구
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2002.03b
    • /
    • pp.11-24
    • /
    • 2002
  • Many GIS systems are not to be trusted becuase many GIS project managers often fail to notice importance of GIS data Construction. With this reason, it is a lively discussion on GIS administration system's adaption. The definition of GIS administration system is not clear, but GIS administration system generally is devided information system administration, audit guideline for the data construction of GIS. Audit guideline for the data construction of GIS. GIS data construction's goals are logical and reasonable action policy of GIS data construction in widespread filed, the other goal is creation of product to the purpose exactly. Audit guideline for the data construction of GIS is composed of optimum of GIS data construction's planning, optimum of GIS data construction's activity, optimum of GIS data quality management, optimum of consultations of GIS data construction, GIS data audit. GIS data audit is the phase of detection product's potential error in each level. GIS data audit is composed of filed examination or filed verification, examination with the naked eye, screen verification, program verification, auto verification. GIS information system's efficiency is linked with auto verification system's function variety, accuracy. this paper offer introduction of Audit guideline for the data construction of GIS, efficient auto verification program

  • PDF

A Design and Adaptation Technique of UML-based Layered Meta-Model for Component Development (컴포넌트 개발을 위한 UML 기반의 계층형 메타 모델 설계 및 적용기법)

  • Lee, Sook-Hee;Kim, Chul-Jin;Cho, Eun-Sook
    • Journal of the Korea Society for Simulation
    • /
    • v.15 no.2
    • /
    • pp.59-69
    • /
    • 2006
  • Component-based software development is introduced as a new development paradigm in software development method. This approach is different from existing software development approach because it is based on reusable and autonomous unit, component. Therefore, component-based development(CBD)is divided into two stages; component development process and component assembly process; application development process. Component development process is the core of CBD because component has a key for good software. Currently many methodologies or tools have been introduced by various academies or industries. However, those don't suggest systematic and flexible modeling techniques adaptable easily into component development project. Existing approaches have a unique orarbitrary modeling technique or provide heuristic guidelines for component modeling. As a result, many component developers are faced with a difficult problems; how to developcomponent models, when develop which diagrams, and so on. In order to address this problem, we suggest a meta-model driven approach for component development in this paper. We provide meta-models according to both layer and development phase. We expect that suggested meta-models allow component developers to develop appropriate models of the time.

  • PDF

Assessing the Performance of CMIP5 GCMs for Various Climatic Elements and Indicators over the Southeast US (다양한 기후요소와 지표에 대한 CMIP5 GCMs 모델 성능 평가 -미국 남동부 지역을 대상으로-)

  • Hwang, Syewoon
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.11
    • /
    • pp.1039-1050
    • /
    • 2014
  • The goal of this study is to demonstrate the diversity of model performance for various climatic elements and indicators. We evaluated the skills of the most advanced 17 General Circulation Models (GCMs) i.e., CMIP5 (Climate Model Inter-comparison project, phase 5) climate models in reproducing retrospective climatology from 1950 to 2000 over the Southeast US for the key climatic elements important in the hydrological and agricultural perspectives (i.e., precipitation, maximum and minimum temperature, and wind speed). The biases of raw CMIP5 GCMs were estimated for 16 different climatic indicators that imply mean climatology, temporal variability, extreme frequency, etc. using a grid-based observational dataset as reference. Based on the error (RMSE) and correlation (R) of GCM outputs, the error-based GCM ranks were assigned on average over the indicators. Overall, the GCMs showed much better accuracy in representing mean climatology of temperature comparing to other elements whereas few GCM showed acceptable skills for precipitation. It was also found that the model skills and ranks would be substantially different by the climatic elements, error statistics applied for evaluation, and indicators as well. This study presents significance of GCM uncertainty and the needs of considering rational strategies for climate model evaluation and selection.

Evaluation of Handover Requirements of Construction Information for Efficient Facility Management (효율적인 자산관리를 위한 건설정보 이양요건 평가)

  • Lee, Ikhaeng;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.12-20
    • /
    • 2018
  • As facilities have become larger, more complex, and advanced, the importance of the facility management in the operation phase of the building is increasing. As a result, the scope of the facility management function is expanding, and the requirements of information are ever-increasing. However, inefficient exchange of information occurs due to duplicated tasks and lack of collaboration among the construction life cycle phases, resulting in cost loss. These low interoperability issues can be complemented by construction information management from a life cycle perspective. Efficient construction information management at each life-cycle stage is derived from the owner's will and is materialized through the construction information handover requirements by the owner. The purpose of this study is to develop an evaluation method of construction information handover requirements for facility management. In order to develop the method, facility management types and business functions are also classified and defined in this paper. Using the methodology proposed by this study, a case-study of evaluating the 'takeover items' submitted by contractors was performed for the purpose of research validation. The results of the case-study found that the most effective areas are in the order of 'legal informations', 'drawings', 'guides', etc. This study can be used as a reference data for deriving handover requirements for construction information at the early stage of the project.

Study on Management Plan of the Financial Supervisory Service According to Increase of Risk of Household Debts (중소형증권사 Project-Financing 우발채무 확대에 따른 금융감독원 관리방안에 관한 연구)

  • Lee, YunHong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.21-33
    • /
    • 2018
  • In 2018, the real estate markets have hardly been transacted according to the government's tight regulations of real estates, and have the high possibility to reach a low hit due to the hike of loan interest rates following the U. S rise of base money rate. The key profits for the large construction companies mainly come from the overseas plant projects and the domestic non-governmental construction projects. They suffered a lot such as the lowering of their credit ratings due to the large losses caused by the frquent design changes and work delay. Even in the domestic non-governmental construction projects, the general business risks are on the rise due to the property marketing moving over to the decreasing phase. The small and medium sized security companies has realized a lot of operaring profits as they participated in the PF market to make up for the losses in the securities trading business. But, now as the housing market is not so good around the nation except Seoul and the financial states of large construction companies are not good enough, they can face the liquidity crisis if there happens the problems in the PF backed securities which they have handled. As Korean economy experienced the crisis in the savings banks before, it is recommended that Financial Supervisory Service proposes the preemptive control method and supervision direction to overcome the crisis.

A study on the navigation message contents of the future Korean navigation satellite (미래 한국형 항법위성을 위한 위성항법메세지에 대한 연구)

  • Jo, Jung-Hyun;Lee, Woo-Kyoung;Choe, Nam-Mi;Baek, Jeong-Ho
    • Journal of Satellite, Information and Communications
    • /
    • v.7 no.1
    • /
    • pp.108-115
    • /
    • 2012
  • Many studies relating the satellite navigation has been done by a relatively small research community in Korea. Most of domestic research has been focused on the application of the satellite navigation technology, but recently the topics of the next generation satellite navigation system are emphasized for its importance. Even opinions suggesting a future Korea's own satellite navigation system are not that uncommon. Due to the geographic, economic, and technological reasons, it is not widely discussed yet. However, a development technical roadmap regarding the Korea's own navigation satellite was established on the Korea Space Development Plan in general term. Currently four global navigation satellite systems are operating or being deployed. Several regional navigation satellite systems are in planning and development phase. Particularly in Asia, China has launched several satellites to complete their own global navigation satellite system, COMPASS until 2020. Japan launched one satellite and has planned to launch rest of set until 2013. It is proper time to develop Korea's own navigation satellite system to acquire the domestic space development technology and the security of navigational infrastructure. In this study, the validity or the feasibility of the Korea's own satellite navigation system is not discussed; rather the possibility and suitability of the additional information to the current operational navigation message is main target. For the first payload of the future Korea's satellite navigation satellite, a regional augmented system is more likely. This study also is focused on that aspect.