CAN TRUST BETWEEN AN OWNER AND A CONTRACTOR BE ESTABLISHED: A PRINCIPAL-AGENT PERSPECTIVE

  • Jiang-wei Xu;Sungwoo Moon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1474-1478
    • /
    • 2009
  • The cooperation and trust among the project participants play a critical role in the success or failure of any delivery system in construction industry. But it is very difficult to establish trust between an owner and a contractor when rational people only pursue only their own material self-interest. Based on the principal-agent theory, this paper will introduce the altruistic behavior into the traditional principal-agent model, and model the reciprocal behavior between the owner and contractor. We will show that both the owner and the contractor benefit from their reciprocal behavior, and hence trust establishing between them is possible. More importantly, we will proof that the higher the project uncertainty is, the more important trust establishing is.

  • PDF

Development of Non-face-to-face Small and Medium-Sized Construction Project Management UI for Owners through Analyzes construction project management-related patents (특허 분석에 의한 발주자용 중.소규모 현장 비대면 건설사업관리 UI개발)

  • Kang, Sang-Chan;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.67-68
    • /
    • 2020
  • Real-time information on the construction project required by the owner make the project's transparency and overall productivity will be improved. This study analyzes domestic and foreign patents for construction project management to identify trends in technology development, construct cloud-based construction project management system solution UI, and proposes functions and services for each module. Trend research is conducted through patent search, and the analysis is divided into quantitative analysis which means quantitative statistics and qualitative analysis which means the technical contents of each patent. The construction project management system solution is based on smart devices at small and medium-sized sites, allowing both the owner and the construction personnel to share information.

  • PDF

A Study on the Characteristics of "Early Contractor Involvement Method" in Public Project in Japan

  • Tamura, Atsushi
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.42-49
    • /
    • 2022
  • In recent years, Owner, Architects, and Contractor are increasingly collaborating with each other from pre construction phase in construction projects, which is called Early Contractor Involvement (ECI). In Japan, the ECI method has been introduced in several public building projects since 2015. The purpose of this study is mainly to clarify the characteristics of the ECI method in Japan and to compare the contract clauses of the ECI method in the UK and the USA. The results of the survey are as follows. (1) the ECI method was supposed to make it possible to achieve appropriate quality, cost, and construction period by reflecting Contractor's technology and know-how in the design documents and specifications. (2) According to the database, there were 27 cases of the ECI method in Japan from 2015 to 2021, of which 13 cases for which bidding information could be obtained had a variety of technical proposals, mainly VE proposals, depending on the project characteristics. (3), Japan's ECI method has very much in common with SBC + PCSA in the UK. On the other hand, ECI Method in Japan differs from in the UK in that Owner, Architect, and Contractor enter into a partnership agreement, which is similar to ConsensusDocs CD541 in the USA. (4) The ECI method in Japan has the following problems: Owner depends on Contractor for cost control, the division of roles among project members is complicated, and more work from Owner than the DBB method are required.

  • PDF

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

A Multilevel Project-Oriented Risk-Mining Framework for Overseas Construction Projects

  • Son, JeongWook;Lee, JeeHee;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.39-40
    • /
    • 2015
  • As international construction market increases, the importance of risk management in international construction project is emphasized. Unfortunately, current risk management practice does not sufficiently deal with project risks. Although a lot of risk analysis techniques have been introduced, most of them focus on project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to manage and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

A View from the Bottom: Project-Oriented Risk Mining Approach for Overseas Construction Projects

  • Lee, JeeHee;Son, JeongWook;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.97-100
    • /
    • 2015
  • Analysis of construction tender documents in overseas projects is a very important issue from a risk management point of view. Unfortunately, majority of construction firms are biased by winning contracts without in-depth analysis of tender documents. As a result, many contractors have incurred loss in overseas projects. Although a lot of risk analysis techniques have been introduced, most of them focus project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to control and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized and assess them. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining, data mining, and information visualization. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

A Model for Deciding Evaluation Weights in Design-Build Delivery Method (일괄입찰방식의 적격심사분이별 배점 결정모델 개발)

  • Kim Man-Chul;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.91-100
    • /
    • 2005
  • Design-build that a single entity performs whole construction process under singular responsibility is one of the project delivery system comes to take expectation effects of time savings, cost saving, and quality assurance. On the other hand, a current domestic method for selecting a design-build contractor is difficult to reflect the purpose of owner and the project characteristics when owner selects the design-build contractor. The purpose of this research is to suggest a model for deciding evaluation weights in design-build which can reflect the purpose of owner and the project characteristics. This research can help owner to select the best suitable design-build contractor for the project.

TREE FORM CLASSIFICATION OF OWNER PAYMENT BEHAVIOUR

  • Hanh Tran;David G. Carmichael;Maria C. A. Balatbat
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.526-533
    • /
    • 2011
  • Contracting is said to be a high-risk business, and a common cause of business failure is related to cash management. A contractor's financial viability depends heavily on how actual payments from an owner deviate from those defined in the contract. The paper presents a method for contractors to evaluate the punctuality and fullness of owner payments based on historical behaviour. It does this by classifying owners according to their late and incomplete payment practices. A payment profile of an owner, in the form of aging claims submitted by the contractor, is used as a basis for the method's development. Regression trees are constructed based on three predictor variables, namely, the average time to payment following a claim, the total amount ending up being paid within a certain period and the level of variability in claim response times. The Tree package in the publicly available R program is used for building the trees. The analysis is particularly useful for contractors at the pre-tendering stage, when contractors predict the likely payment scenario in an upcoming project. Based on the method, the contractor can decide whether to tender or not tender, or adjust its financial preparations accordingly. The paper is a contribution in risk management applied to claim and dispute resolution practice. It is argued that by contractors having a better understanding of owner payment behaviour, fewer disputes and contractor business failures will occur.

  • PDF

OVERALL BENEFIT-DURATION OPTIMIZATION (OBDO) FOR OWNERS IN LARGE-SCALE CONSTRUCTION PROJECTS

  • Seng-Kiong Ting;Heng Pan
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.780-785
    • /
    • 2005
  • This paper aims to consider an overall benefit-duration optimization (OBDO) problem for the sake of maximizing owner's economic benefits, whilst considering influences of schedule compression incurred opportunity income on the profitability of a large-scale construction project. Unlike previous schedule optimization models and techniques that have focused on project duration or cost minimization, with greater weight on contractors' interests, OBDO facilitates owner's economic benefits through overall benefit-duration optimization. In this paper, the objective function of OBDO model is formulated. An example is illustrated to prove the feasibility and practicability of the overall benefit-duration optimization problem. The significance of employing OBDO model and future research work are also described.

  • PDF

A Fuzzy AHP Model for Selection of Consultant Contractor in Bidding Phase in Vietnam

  • Ha, Tran Thanh;Hoai, Long Le;Lee, Young Dai
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.35-43
    • /
    • 2015
  • Project Management Consultant (PMC) plays a vital role in the overall performance of any project. Selecting right PMC for right project is the most crucial challenge for any construction owner. Thus, PMC selection is one of the main decisions made by owners at the early phase of construction project. It is not easy for the project owner to select a competent PMC due to the fuzziness, imprecision, vagueness, incomplete and qualitative criteria of the decision. This paper presents a model for selecting PMC contractor using the Fuzzy Analytical Hierarchy Process (FAHP). And a fuzzy number based framework is proposed to be a viable method for PMC contractor selection. A case study to illustrate the application of the model is also presented in this paper.