• 제목/요약/키워드: Project Operation System

검색결과 745건 처리시간 0.04초

Description of Range Control System in Space Center

  • Yun, Sek-Young;Choi,Yong-Tae;Lee, Hyo-Keun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2002년도 ICCAS
    • /
    • pp.53.2-53
    • /
    • 2002
  • NARO Space Center is being developed as a national project for the Korea Space Development Program. Among the major missions of the Space Center, the Range Control System is the focal point for all command and control operation of the Space Center. The acquired data from the Tracking Stations and the on-site facilities is processed and distributed in the Control Center. Data processing or data fusion is needed for the exact tracking of the Launch Vehicle from several tracking systems. The first phase, which is the best telemetry source is selected among data streams that are received from each telemetry stations using some pre-defined criterion. Trajectory data and major telemetry parameters...

  • PDF

PICmicro controller 교육을 위한 RTOS 적용 연구 (Implementation of a Real Time OS for the Education of PICmicro Controller)

  • 이영대;문찬우
    • 한국인터넷방송통신학회논문지
    • /
    • 제8권5호
    • /
    • pp.167-172
    • /
    • 2008
  • 자동차, 로봇 등의 분야에서 실시간 운영체제의 사용이 증가하고 있다. PICmicro의 마이크로컨트롤러는 산업현장에서 많이 사용되고 있는 마이크로컨트롤러로서, 이 제품군에 실시간 운영체제(RTOS)를 탑재하려는 연구가 폭 넓게 이루어지고 있으나 일부 제품군에서는 리소스의 제한으로 RTOS의 탑재가 어려운 경우가 많다. 이 연구에서는 교육적 목적으로 리소스가 제한된 PIC16F87x 시리즈에 대해 RTOS의 기능을 구현한다.

  • PDF

SE 툴을 이용한 도시철도 표준사양 형상관리 방안 연구 (Study of Configuration Management for City Train Standard Specifications using SE Tool)

  • 이우동
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 B
    • /
    • pp.1095-1096
    • /
    • 2006
  • Configuration management plays a key role in systems engineering process for any project from earlier stage of development. It consists of five major activities, ie., configuration management planing, configuration identification, configuration control, configuration status accounting and configuration verification and audit, and is essential to control system design development and operation throughout entire life cycle of the system development. And it is directly associated with other part of systems engineering management, ie., technical data management which provides traceability of important decisions and changes during development. In this paper, we describe how to apply CASE(Computer-aided Systems Engineering) tool-Cradle for the configuration management to achieve effectiveness of City Train Standard Specification Management process.

  • PDF

BIM 기반 토공 장비 계획 및 운영 자동화 시스템 (BIM Based Automated Planning and Operation System for Earthwork Equipment)

  • 김정환;장준현;민지홍;서종원
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2011년도 정기 학술대회
    • /
    • pp.375-378
    • /
    • 2011
  • 건설공사에서 토공사가 차지하는 비중은 타공종에 비하여 높다. 즉 건설공사의 생산성을 향상시키기 위하여 토공사를 중점적으로 관리하는 일은 매우 중요하다고 할 수 있다. 그러나 현재의 토공 시스템은 굴삭 조종자와 현장 계획 관리자의 경험적 지식에만 의지하여 토공 계획을 수립하고 있는 실정이며, 또한 노동 집약적 토공작업의 한계를 벗어나지 못하는 현실로 인하여 토공사를 관리함에 어려움이 있다. 이러한 당면 과제를 극복하고자 BIM 기반의 토공 시스템에 대하여 소개하고자 한다. 본 논문에서는 굴삭 장비와 연계하는 토공 계획과 운영 자동화 시스템에 대하여 주로 다루게 된다. 굴삭 작업 계획 생성 시스템, 장비 조종 인터페이스, 웹 기반 Project Management Information System(PMIS)이 개발되는 과정에서 적용된 BIM 요소기술에 대하여 살펴본다.

  • PDF

선박검사부문의 품질경영과 검사서비스의 만족도에 관한 실증연구 (An Empirical Study on Quality Management of Ship Inspection Sector and Satisfaction of Inspection Service)

  • 노창균
    • 해양환경안전학회지
    • /
    • 제7권3호
    • /
    • pp.117-127
    • /
    • 2001
  • On this research, recognizing that ship inspection is closely related in improving ship safety', the importance of active quality managements of ship inspection has been notified. This paper aims to explore effective ways to improve inspection service and develop customer-centered inspection administration, by carrying out a case study on K Company. The methods applied for this research project are as follows, 1) sector-based examination of the existence of the ISO 9001 system; 2) evaluation of the operation of the system; 3) conduction of a survey questionnaire with the participation of all staff and inspection companies to analyze customer satisfaction of their inspection service, and 4) statistical analysis of the data collected from the survey questionnaire.

  • PDF

Development of BIM-based bridge maintenance system for cable-stayed bridges

  • Shim, Chang-su;Kang, Hwirang;Dang, Ngoc Son;Lee, Deokkeun
    • Smart Structures and Systems
    • /
    • 제20권6호
    • /
    • pp.697-708
    • /
    • 2017
  • Maintenance plays a critical role in the bridge industry, but actual practices show many limitations because of traditional, 2D-based information systems. It is necessary to develop a new generation of maintenance information management systems for more reliable decision making in bridge maintenance. Enhancing current work processes requires a BIM-based 3D digital model that can use information from the whole lifecycle of a project (design, construction, operation, and maintenance) through continuous exchanges and updates from each stakeholder. This study describes the development of a data scheme for maintenance of cable-stayed bridges. We implemented the proposed system for a cable-stayed bridge and discussed its effectiveness.

154kV급 실증시험용 인텔리전트 변전소 구축 (Construction of 154kV Intelligent Substation for Verification Test)

  • 정영환;김정배;이학성;최인혁;이동일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.661-662
    • /
    • 2007
  • We have carried out the construction of the 154kV intelligent substation with KEPRI. The intelligent substation is built in Gochang testing facility of KEPCO and consists of electronic instruments for GIS(gas insulated switchgear), digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are introduced compared with the instrument transformer of conventional type. Digital control panel(DCP) replaces the LCP(local control panel) which is drived for mechanical operation. For the monitoring of the condition of GIS and TR, various sensors are used. In this paper, we mention the synopsis and report the progress state of project.

  • PDF

동력차용 차량 시뮬레이터 (A Vehicle Simulator for a Power Car)

  • 이주훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 추계학술대회 논문집 학회본부A
    • /
    • pp.344-346
    • /
    • 1998
  • The OBCS(On-Board Computer System) achieves train system diagnosis and control. For commercial train operation, it must guarantee the reliability for safe and have low cost operational algorithm. To guarantee the diagnosis function and the control ability of OBCS, sufficient actual railway running test under severe conditions is required. But, running test has some limitations for making severe conditions because of safety and it demands quite long time and a lot of costs. So simulator is required and is utilized in many countries. We designed a simulator to test various functions and performance of controllers for high speed train's power car under various conditions and it is represented briefly.

  • PDF

A FRAMEWORK FOR SIMULATING CONSTRUCTION PROCESSES FOR OPTIMIZING THE FLOOR CONSTRUCTION CYCLE USING BIM

  • Seung-Jun Ahn;Hyun-Soo Lee;Moonseo Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.835-840
    • /
    • 2009
  • Lately, Building Information Modeling (BIM) emerges as the most promising technology, now is expected to bring a great deal of improvement of productivity in every aspect of the construction industry. One of the BIM based scheduling is to use BIM model as a base for applying to schedule analysis and simulation tools. This type of tools may incorporate a various types of information such as the building model, construction method information, resource information, productivity information, rules and constraints to optimize activity sequencing. This paper proposes a framework of BIM based simulating system which can be used to optimize construction processes, especially for the floor construction cycle. For the purpose, all of the necessary components of the system will be defined and represented, and next an algorithm will be introduced to demonstrate the principle of simulating operation. The benefits of this technique are basically two : to test and optimize construction methods in respect of the construction duration and to reduce the floor construction cycle.

  • PDF

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF