• Title/Summary/Keyword: Project Operation System

Search Result 745, Processing Time 0.034 seconds

Development of Maintenance Management System Module in BTL Project for Educational Facilities (교육시설물 BTL 사업의 유지관리 시스템 모듈 개발)

  • Lee, Eun-Dong;Son, Jae-Ho;Kim, Jae-On
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.132-141
    • /
    • 2007
  • According to the public information of the Ministry of Education & Human Resources Development, the construction project of educational facilities from 2005 to 2007 will use BTL (Build-Transfer-Lease) contract. Budget of those projects will be the worth over 13 trillion won. In this research, the estimation standards for the public health maintenance expenses are established which is the part of the operation and maintenance cost in the total BTL project cost. Also, a system core module using the developed standard was introduced in this paper. A comparative analyses were conducted with the several possible estimation case to validate the system developed.

A Software Architecture Life Cycle Model Based on the Program Management Perspective : The Expanded Spiral Model (프로그램 관리 관점에 기반을 둔 소프트웨어 아키텍처 생애주기 모델 : 확장된 나선형 모델)

  • Koh, Seokha
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.2
    • /
    • pp.69-87
    • /
    • 2013
  • The expanded spiral model in this paper consists of five processes of architecture design, architectural construction, architectural maintenance, operation, and architectural management. The former four processes are executed alternatively, while the latter architectural management process is executed continuously interacting with the other processes during the whole life cycle of the system. The expanded spiral model provides a conceptual framework to sort discussions of architectural degeneration into those of product-oriented processes and those of management processes, making it possible to incorporate the models and body of knowledge about project and program management especially those of Project Management Institute, into discussions of architectural degeneration. A good architecture decomposes the software-intensive system into components mutually interacting in a well-formed structure. The architecture design process and the architectural construction process together create the object system with well-designed architecture. The architectural maintenance process prevents the implemented architecture deviate from the designed architecture. The architectural management process monitors the changes of requirements including architecturally significant requirements, supports the other processes to be executed reflecting various perspectives of stake-holders, and creates and documents the reasons of architectural decisions, which is considered as a key element of the architecture.

An operational issues analysis of ICT-based on-board train control system (ICT기반 차상제어시스템 개발에 따른 운영 이슈 사항 분석)

  • Kim, Young-Hoon;Choi, Won-Suk
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1043-1048
    • /
    • 2011
  • In the case of a low density branch line, these areas are operating at a loss. So much money is used for infrastructure maintenance cost. To solve the problem, our institute have a project to develop the Information & Communication Technology based train operation system. In a similar research in the Europe, The UK's Transport Research Laboratory experienced analysis of operational issue for developing ERTMS from Level II to Level III. In this paper, we study about railway operational issues before development of ICT based train operation system. An analysis target of operational issues are railway business process & data, drivability and moving or virtual block system.

  • PDF

SE Application Methods of Pre-Business for Effective Operation of Driveless LRT System (무인운전경전철시스템의 효과적 운영을 위한 사업초기단계 SE적용방안)

  • Chung, Su-Young;Park, Soo-Choong;Min, Kyung-Se;Jeon, Seo-Tak
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3312-3317
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to Driverless LRT system. Therefore, PM and SE technique is applied for efficient management of a construction business. In case of SE(System Engineering) in domestic, most foreign companies are doing to lead but we are under effort for the environment that a domestic company can lead. In this study, We emphasize to SE importance of pre-business for operation to be effective of Driveless LRT system, and propose about activities in the SE at requirements definitions and requirements analysis steps of a highest level. To achieve this, We propose SE Application Methods of Pre-Business regarding assistance process of project planning, evaluation and control, and risk management.

  • PDF

Development of Operating Program for EECU Test Bench

  • Kang, Myoungcheol;Kho, Seonghee;Ki, Jayoung
    • International Journal of Aerospace System Engineering
    • /
    • v.1 no.1
    • /
    • pp.10-15
    • /
    • 2014
  • This study presents technical description of the operating program development that operates the test bench for functional test of EECU. The test bench is capable of testing, simulation and adjustment of the EECU software using the operating program. The test bench is for the Development Project of the EECU platform for FADEC system. The operating program is consists of 3 modules which are the test bench operating module, cockpit simulator module and SILS module. The operating module mainly carries out the EECU test with manual operation and operating scenarios. Also that record and process the test data. The cockpit simulator module is capable of implementation of virtual cockpit control input and engine status display. The SILS module can simulate engine and EECU operation in software environment.

Design of Ground Station System for CubeSat STEP Cube Lab. (큐브위성 STEP Cube Lab.의 지상국 시스템 설계)

  • Jeon, Younghyeon;Chae, Bonggeon;Jeong, Hyeonmo;Jeon, Seongyong;Oh, Hyunung
    • Journal of Aerospace System Engineering
    • /
    • v.6 no.4
    • /
    • pp.34-39
    • /
    • 2012
  • CubeSats classified as pico-class satellite require a ground station to track the satellite, transmit a command, and receive an on-orbit data such as SOH (State-of-Health) and mission data according to the operation plan. For this, ground station system has to be properly designed to perform a communication to with the satellite with enough up- and down-link budgets. In this study, a conceptual design of the ground station has been performed for the CubeSat named as STEP Cube Lab. (Cube Laboratory for Space Technology Experimental Project). The paper includes a ground station hardware interface design, link budget analysis and a ground station software realization. In addition, the operation plan of the ground station has been established considering the STEP Cube Lab. mission requirements.

Simulation System for Earthmoving Operation with Traffic Flow

  • Kyoungmin Kim;Kyong Ju Kim;Hyeon Jeong Cho;Sang Kyu Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1359-1363
    • /
    • 2009
  • The object of this research is to develop a simulation system for earthmoving operations in consideration of the impact of congestion in-between equipment and existing traffic flow around the site. The congestion in-between equipment and traffic flow affect work productivity. The conventional discrete event simulation, however, has limitations in simulating the flow of construction equipment. To consider the impact of congestion in-between equipment and existing traffic flow, in this paper, a multi-agent based simulation model that can realize characteristics of truck behavior more accurately to consider the impact of congestion was proposed. In this simulation model, multiple agents can identify environmental changes and adapt themselves to the new environment. This modeling approach is a better choice for this problem since it describes behavioral characteristics of each agent by sensing changes in dynamic surroundings. This study suggests a detailed system design of the multi-agent based simulation system.

  • PDF

USING GIS TO IMPROVE ROADWAY CONSTRUCTION PLANNING

  • Sanghyeok Kang;Jongwon Seo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.643-648
    • /
    • 2005
  • The planning process for roadway construction involves a large amount of information on design, construction methods, quantities, unit costs, production rates, and site conditions. Therefore, it is very important to acquire, manage, and process the necessary information efficiently to produce a rigorous construction plan. GIS (Geographic Information System) is a very effective tool for integrating and managing various types of information including spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Interactive Space Scheduling' and 'Operation Level Planning' functions. The proposed system can assist construction planners in a unique way by integrating design and construction information and creating modularized design elements for space scheduling in real time. It is expected that the proposed system could improve the efficiency of roadway construction planning.

  • PDF

Research of Circuit Working Construction Elevator with Single-guide Rail and Multi-cages

  • Kun Zhang;Kaiqiang Wang;Di Li;Qing Sun;Zhen Ye;Wei Liu
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.137-144
    • /
    • 2022
  • As one of the most important vertical transportation equipment in super high-rise buildings, the construction elevator directly affects the project period, cost, and effectiveness. The paper proposes a new construction elevator with single-guide rail and multi-cages. It can solve the problems of single construction elevator capacity shortage and efficacy decrease with height reduction, the occupancy of plan and elevation position of multiple construction elevators, and extension of total construction period by cycling operation of multi-cages on a single-guide rail. The paper focuses on the design and research of the main components of the equipment, such as the rotating guide rail mechanism, vertical bearing mast tie system, segmented electrical power supply system, group control scheduling system, and safety anti-collision system.

A Strategy of Technology Development for the Railway System based on Railway Network (철도망 구축을 고려한 철도시스템의 기술개발전략)

  • Lee Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.319-324
    • /
    • 2006
  • Studied was a strategy of technology development for railway system in terms of railway network. First, The successful launch of the Korean HST system has not only decreased logistics burden but also significantly transformed the Korean trunk-line railway network, revolutionizing the logistics and technology sectors and reinvigorating the Korean railway industry in one century. Korean railway industry sector is now investing to develop many different types of railway system(G7, Post G7, tilting train...) so that these kinds of various railway system development should be integrated with the National Inter-modal Transportation Network Plan. To secure sufficient capacity that is required by the National Railroad Plan, the railway industry needs to establish mid- and long-term train purchase and operation strategies in compliance with railway construction and operation policies. During a railway construction planning, train operators, based on their train operation strategies, should come up with measures to closely cooperate with project operators from the planning stage through to the opening of a railway system. To be more precise, train operators should establish long-term train procurement plans reflecting both long-term national railroad network plans and plans for each railway line in order to suggest appropriate roles and schedules for each line. Also, based on the long-term railway plan, directions should be decided concerning the research and development of trains in advance.