• Title/Summary/Keyword: Project Operation System

Search Result 745, Processing Time 0.033 seconds

Performance of Dish-Stirliling Solar Power System (Dish-Stirling 태양열 발전시스템 운전 및 성능분석)

  • Kim, Jin-Soo;Kang, Yong-Heack;Lee, Sang-Nam;Yoon, Hwan-Ki;Yu, Chang-Kyun;Kim, Jong-Kyu;Jo, Dok-Ki
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.180-183
    • /
    • 2006
  • As a final step for developing a small-scale solar thermal power generation technology, a demonstration project for a dish-stirling power system has been carried out by KIER. During the two years project period, 10kW solar-only power system was built in Jinhae city and successful solar operations were demonstrated. In this paper an example of typical clean day operation and analysis results was introduced.

  • PDF

Developing the Management System of the Constructing Railway Safety Test Facilities Using the Model-Based Systems Engineering Approach (모델기반 시스템엔지니어링 접근을 통한 철도안전 시험설비구축 사업 관리체계 개발)

  • Kim, Yun-Mi;Choi, Kyoung-Jin;Cho, Youn-Ok
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1964-1969
    • /
    • 2008
  • A railway is a complex system integrated with a lot of technical elements such as rolling stock, power, signal control, communications, tracks, stations, operation control systems, and so on. As a mass transportation system, a railway could contain potential risks that may result in a high death rate and property losses. Accordingly, Railroad Safety Technology R&D Corps. is adopting the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective project management methods with Systems Engineering techniques. To support that, we propose the more effectual management method of constructing the Railway Safety Test Facilities applying the model-based systems engineering tool to the research.

  • PDF

APPLICATION OF USN TECHNOLOGY FOR MONITORING EARTH RETAINING WALL

  • Sungwoo Moon;Eungi Choi;Injoon Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.517-520
    • /
    • 2013
  • In construction operation, the temporary structure is used to support designed facilities or to provide work spaces for construction activities. Since the structure is used only during the construction operation, the operation may be given insufficient attention. The contractor is likely to try to save cost on the material and labor cost. This contractor's behavior frequently leads to construction accidents. In order to prevent accidents from the failure, the operation should be carefully monitored for identifying the effect of dynamics in the surrounding site area. Otherwise, any unexpected adversary effect could result in a very costly construction failure. This study presents the feasibility of the ubiquitous sensor network (USN) technology in collecting construction data during the construction operation of earth retaining walls. The study is based on the result at the Construction System Integration Laboratory (CSIL) at the Pusan National University. A USN-based system has been developed for monitoring the behavior of the temporary structure of earth retaining walls. The data collected from the sensors were used to understand the behavior of the temporary structure. The result of this study will be used in increasing the safety during the construction operation of retaining walls.

  • PDF

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

Real-Time Scheduling System Re-Construction for Automated Manufacturing in a Korean 300mm Wafer Fab (반도체 자동화 생산을 위한 실시간 일정계획 시스템 재 구축에 관한 연구 : 300mm 반도체 제조라인 적용 사례)

  • Choi, Seong-Woo;Lee, Jung-Seung
    • Journal of Intelligence and Information Systems
    • /
    • v.15 no.4
    • /
    • pp.213-224
    • /
    • 2009
  • This paper describes a real-time scheduling system re-construction project for automated manufacturing at a 300mm wafer fab of Korean semiconductor manufacturing company. During executing this project, for each main operation such as clean, diffusion, deposition, photolithography, and metallization, each adopted scheduling algorithm was developed, and then those were implemented in a real-time scheduling system. In this paper, we focus on the scheduling algorithms and real-time scheduling system for clean and diffusion operations, that is, a serial-process block with the constraint of limited queue time and batch processors. After this project was completed, the automated manufacturing utilizations of clean and diffusion operations became around 91% and 83% respectively, which were about 50% and 10% at the beginning of this project. The automated manufacturing system reduces direct operating costs, increased throughput on the equipments, and suggests continuous and uninterrupted processings.

  • PDF

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF

Development of 10 kW Dish-Stirling System for Commercialization and Analysis of Operating Characteristics (10 kW급 접시형 태양열발전시스템 사업모델 개발 및 운전특성 분석)

  • Kim, Jong-Kyu;Lee, Sang-Nam;Kang, Yong-Heack
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.6
    • /
    • pp.118-124
    • /
    • 2010
  • In order to develop commercial model of 10kW dish-Stirling solar thermal power system, modification for the exiting facility was taken for a year as a Leading Project in KIER. During the project, solar tracking system, control and monitoring system and high durability reflector were developed and long term operation were performed. The solar tracking system was tested for four months to investigate the degree of precision and adapted to the control system for an actual operation from October in 2009. The sun tracking accuracy of ${\pm}4$ mrad using modified control system was obtained and the system operated successfully during the experimental period. The monitoring system displays engine pressure, electric generation amounts, generator RPM, receiver temperatures, and etc. from Stirling engine and weather data of Direct Normal Irradiation, Horizontal Global Insolation, wind speed & direction, and atmosphere temperature from weather station. According to the operating results in a clear sky day, electric power of 6,890 W was generated at the DNI value of 850 W/$m^2$ and the averaged solar-to-electricity efficiency during a whole day reached to 18.99%. From the overall operating results, linear power generation trend could be observed with increasing DNI value. The solar-to-electricity efficiency achieved to 19% around the DNI value of 700 W/$m^2$ and increased to 20% when the DNI value goes up to 900 W/$m^2$.

A Study on the Classification System of National Construction Project based on WBS (WBS 기반의 국책 건설사업 기록물 분류체계에 대한 연구)

  • Jeong, Ki-Ae;Jung, Kuk-Hwan;Kim, Chang-Ha
    • Journal of Information Management
    • /
    • v.41 no.1
    • /
    • pp.173-200
    • /
    • 2010
  • National construction project for SOC(Social Overhead Capital) is led by the government and invested high cost and all capabilities for long times. In general case the life times of SOC facilities are permanently. According to the long life time of the facilities documents and records of national projects are also retained permanently. Consistent classification systems are required to operation and maintenance of the facilities efficiently and to support the organic co-works for several Stakeholders. Therefore the classification of national construction projects are based on WBS of the project. WBS is the hierarchy structure that established and developed in project management project management methodology to produce deliverables of the projects. As a result, this study provides a prospect of project records classification systems in the 21st Century.

Design and Operational Test of 22.9kV, 30m, 3phase HTS Cable Cooling System

  • Kim Do-Hyung;Kim Choon-Dong;Park In-Son;Jang Hyun-Man;Lee Su-Kil
    • Progress in Superconductivity and Cryogenics
    • /
    • v.8 no.2
    • /
    • pp.46-49
    • /
    • 2006
  • The 30m, 3phase, 22.9kV HTS (High Temperature Superconducting) power cable system was produced by LS Cable Ltd. The project aims for a commercial HTS cable. The designing, the manufacturing and the initial operating of HTS cable system were completed by 2004. Then, we have performed a long term operational test since February, 2005. This paper mainly reports the result of the HTS cable cooling operation.

A Study on development of Assesment System for BTL Project;Prediction of Reasonable Construction and Maintenance Cost in Education Facilities. (합리적 교육시설물 유지보수 및 공사비 예측을 위한 BTL 적격성 평가 시스템 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.111-116
    • /
    • 2006
  • The objective of this research is to develop an assesment system for BTL Project. A new method for the prediction of construction and maintenance cost in the educational facilities has been considered and under development by the authors. This paper explains the current BTL assesment method used by most local district office of education and lists its potential problems. Main conceptual modules in the new Assesment System are shown in this paper. Also, viable results of each module are discussed in this paper.

  • PDF