• Title/Summary/Keyword: Project Operation System

Search Result 745, Processing Time 0.042 seconds

Analysis of PMIS Users Satisfaction and Loyalty Using Structural Equation Model

  • Kim, Min-Cheol;Lee, Hyung-Il;Cho, Sang-Ho;Kim, Ju-Hyung
    • Architectural research
    • /
    • v.23 no.1
    • /
    • pp.1-10
    • /
    • 2021
  • Project management information systems (PMIS) have been implemented to support cooperation among the participants of construction projects. Unlike other information systems used by members from an organization with similar culture and business environment, the PMIS are members from one-off fragmented project organization with diverse professional background. Successful operation is significantly affected by the tendencies of client's side and individual awareness of participants. In this regard, it is imperative to evaluate the success of the system based on the individual characteristics of PMIS users. Thus, this study proposes a method for determining the system success by analyzing the extent of the effects of system factors such as System Quality, Information Quality, and Service Quality and individual factors such as a user's IT application ability, Extrinsic Motivation to achieve User Satisfaction, and loyalty. Accordingly, a structural equation model (SEM), an effective tool to examine of the comprehensive structure of a causal relationship, is applied for analysis because the internal awareness of individuals is established as a variable.

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

System Specification of ATP for Standard System of KRTCS (한국형 무선통신기반 열차제어시스템 표준체계 구축을 위한 ATP 개발사양 연구)

  • Oh, Seh-Chan;Yoon, Yong-Ki;Kim, Yong-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.255-260
    • /
    • 2011
  • The train control system is a facility to ensure safe train operation, and its safety is the most important factor for system introduction. Therefore, in order to improve practical usability in the business, safety analysis and evaluation of train control system and train control related core technologies are needed. Korea Railroad Research Institute has carried out standard development of radio-based train control system as a government research and development project. In this paper, we present a system specification of ATP, a core part of train control system, for standard system of Korean radio-based train control system(KRTCS). The paper present a operation environment and primary ATP functions, and functional requirement specifications.

  • PDF

Rough-cut simulation algorithm for the decision of operations policy at the block paint shop in shipbuilding (조선 도장공정 운영전략 수립을 위한 사전모의실험기법)

  • Chung, Kuy-Hoon;Park, Chang-Kyu;Min, Sang-Gyu;Park, Ju-Chull;Cho, Kyu-Kab
    • IE interfaces
    • /
    • v.14 no.1
    • /
    • pp.59-66
    • /
    • 2001
  • This paper introduces the case study that has been performed at the block paint shop, Hyundai Heavy Industries. First of all, the overall production processes of shipbuilding and research activities conducted by Korean are reviewed with a view-point of production planning. Then HYPOS(Hyundai heavy industries Painting shop Operation System) project is briefly described, which has several modules such as planning module, scheduling module, work order module, and DB(database) management module. Although the HYPOS system has several modules, this paper mainly focuses on the planning module that utilizes the rough-cut simulation algorithm to make a decision about the policy for production schedule. The HYPOS has been operated since June, 2000 and the operation data has been collected for the purpose of future evaluation about the performance of HYPOS system. The evaluation of HYPOS will be shown in a public domain as soon as the enough operation data is available.

  • PDF

Program development For software maintenance of existing SCADA system in KEPCO (SCADA 시스템의 소프트웨어 연구 개발)

  • Shin, Keon-Hak;Woo, Hee-Gon
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.321-324
    • /
    • 1987
  • The development of SCADA system program has been studied for the purpose of upgrading its function and increasing the effect of system application. The results of this project are divided into 3 steps, Analysis of the system function and operating system, Improvement of programs for effective alarm/logging system, Development of programs for the statistical analysis of power system operation.

  • PDF

A Study of Factors Influencing Delivery Methods Selection on Public Construction Projects (공공공사 발주방식 선정에 영향을 미치는 요인 연구)

  • Kim, Dae-gil;Lee, Ung-Kyun;Lee, Hak-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.218-219
    • /
    • 2014
  • The selection of an appropriate contract method is vital for the successful operation of the project. However, there has been a lack of studies on objective decision making support models for use in the planning stage of a project contract. The present study had the goal of analyzing the factors that influence contract method selection, as an initial study for developing a project contract method selection model. The existing related studies were analyzed, and the factors considered in the literature were selected. Then, based on the findings, the opinions of an expert group on the important factors for contract method selection were collected through a survey. The collected opinions were analyzed using factor analysis, a statistical analysis method. The results will be utilized in the future as preliminary data for developing a decision making model for selecting a contract method.

  • PDF

IMPLEMENTATION OF A DECISION SUPPORT SYSTEM FOR INTEGRATED RIVER BASIN WATER MANAGEMENT IN KOREA

  • Shim Soon-Do;Shim Kyu-Cheoul
    • Water Engineering Research
    • /
    • v.5 no.4
    • /
    • pp.157-176
    • /
    • 2004
  • This research presents a prototype development and implementation of Decision Support System (DSS) for integrated river basin water management for the flood control. The DSS consists of Relational Database Management System, Hydrologic Data Monitoring System, Spatial Analysis Module, Spatial and Temporal Analysis for Rainfall Event Tool, Flood Forecasting Module, Real-Time Operation of Multi Reservoir System, and Dialog Module with Graphical User Interface and Graphic Display Systems. The developed DSS provides an automated process of alternative evaluation and selection within a flexible, fully integrated, interactive, centered relational database management system in a user-friendly computer environment. The river basin decision-maker for the flood control should expect that she or he could manage the flood events more effectively by fully grasping the hydrologic situation throughout the basin.

  • PDF

A Case Study for Manufacturing Information System Design in Make-to-Order Production (수주생산방식에서 생산정보시스템 설계방법에 관한 사례연구)

  • Seo, Jun-Yong;Kim, Jae-Gyun;Koh, Jae-Moon
    • IE interfaces
    • /
    • v.12 no.4
    • /
    • pp.514-531
    • /
    • 1999
  • This paper deals with the design of the manufacturing information system which is able to respond rapidly to various requirements of customers in make-to-order environment. The system is required to maintain a consistent flow of information from the start to the end. For this, we adopt an approach based on Information Engineering (IE) methodology, which consists of four stages: planning, analysis, basic design, and detail design. The first is a planing stage which establishes a project goal and organizes a project team. In the second stage, current activities are analyzed and problems are defined. The basic design is accomplished in the third stage, where a project scope is defined and an overall feature of the new system is presented. And then, in the last stage, the operation plan of each subsystem is drawn up in detail and all subsystems are integrated. This study applies the methodology to the case of H company and focuses on designing forms which are easy-to-write, easy-to-understand, and field-oriented. These forms are interrelated and can be used for systematic analysis and design. By applying them to the system design, we have obtained effect of reducing cost and time.

  • PDF

Analysis of Relative Importance and Priority of Civil Servant's Education Training Policy: Using Analytic Hierarchy Process (AHP) Method (공무원교육훈련정책의 상대적 중요도와 우선순위 분석: 계층의사결정방법(AHP)을 활용하여)

  • Park, Jong-Deuk
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.4
    • /
    • pp.263-272
    • /
    • 2012
  • In an attempt to analyze the policy priority on civil servant's education training policy as human resource management in this study, a positive analysis with the experts using AHP method was conducted. Summarizing the outcome of the study; First, in terms of relative priority of the evaluation elements by sector, the education training operation system, among education training program, education training evaluation, and education infrastructure, was analyzed as the most important element. Second, as a result of analyzing the priority of detail sectors of civil servant's education training, Action learning education program was proved to be the top priority project education training program aspect and education training operation system was also evaluated as the top priority project in education training agency budget expansion aspect, education training and personnel administration link was evaluated as the top priority project education training evaluation, and trainer secure was proved to be the top priority education infrastructure. Such outcome of the project is expected to make commitment for evaluating the civil servant's education training policy.

A Study on Efficient Methods of Cadastral Resurvey Responsible Agency Operation (지적재조사 책임수행기관 운영의 효율화 방안 연구)

  • Lee, Jae-Hyuk;Hong, Sung-Eon
    • Journal of Industrial Convergence
    • /
    • v.20 no.8
    • /
    • pp.33-40
    • /
    • 2022
  • In this study, we tried to suggest a plan to improve the efficiency of operation after analyzing the actual conditions by selecting case areas operated by the cadastral resurvey responsible agency system. The research results are as follows. In the evaluation of the selection of a cadastral resurvey agency, a method to raise the qualitative evaluation score was suggested. The expansion of support for the cadastral resurvey agency made it possible to automatically connect and install when the LandyGo program is updated, and suggested that prior training should be stipulated in the related regulations. In the performance of cadastral resurvey surveying and division of duties, the installation of temporary boundary monuments and determine boundary monuments should be integrated. And this suggested the direction of conserving the project cost of the cadastral resurvey agency through joint implementation. Also, in the short-term and long-term perspectives, a plan for realization of project cost distribution in connection with the expansion of the entrustment of the cadastral resurvey responsible agency was presented. If the responsible agency system is operated by reflecting the results of this research, it is expected to improve the satisfaction of the project participants and shorten the project period.