• 제목/요약/키워드: Project Map

검색결과 412건 처리시간 0.036초

수치바람모의에 의한 한반도 바람지도 구축 (Establishment of Korean Wind Map by Numerical Wind Simulation)

  • 김현구;장문석;이화운;최현정
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 2006년 제4회 한국유체공학학술대회 논문집
    • /
    • pp.265-268
    • /
    • 2006
  • In this paper, the research background and objectives of the wind mapping project of the Korean Peninsula, which has been carrying out as a part of "Investigation of new-renewable energy resources and establishment of comprehensive management system" funded by Korea Ministry of Commerce, Industry and Energy, are introduced together with the intermediate result of the project so far. The Korean wind map is to be established by numerical wind simulation based on terrain model ME-DEM and land-use model ME-LUM with the spatial resolution of 10km.

  • PDF

구조적 또는 정보공학 소프트웨어 개발 방법론 개선 절차 (The Procedure for Improving Structural Methodology or Information engineering Methodology)

  • 정병권;윤석민
    • 정보처리학회논문지D
    • /
    • 제9D권6호
    • /
    • pp.1083-1090
    • /
    • 2002
  • 소프트웨어개발방법론은 급변하는 정보기술변화에 따라가지 못한다. 대부분의 소프트웨어 개발 프로젝트는 구조적 또는 정보공학 방법론을 사용한다. 기존 소프트웨어 개발 방법론이 프로젝트에 적용할 기술이 반영이 안되어 있다면, 프로젝트는 비효율적으로 수행되어진다. 본 논문은 새로운 정보기술을 기존의 구조적 또는 정보공학 방법론에 용이하게 반영하여 개선하는 모델을 제안한다. 본 모델은 소프트웨어 생명주기를 단계들로 나누고 각 단계는 관점 영역으로 나누어 분할된 작은 영역에 새로 적용할 정보기술을 반영하는 분할과 정복 기법을 활용한다. 적용사례는 설계단계를 중심으로 KCC 정보통신(주)에서 사용한 클라이언트 서버 방법론 CS@RoadMap에 웹 기반 소프트웨어 개발절차를 반영하였다. CS@RoadMap방법론에 웹 기술을 반영한 Web@RoadMap방법론을 공공 프로젝트에 적용하였다.

Assessment of Accuracy of IKONOS Image Map, Traditional Orthophoto Map and Conventional Line Map of Kathmandu Valley : A Pilot Study

  • Kayastha, D.M.;Chhatkuli, R.R.;Paudel, J.R.
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2003년도 Proceedings of ACRS 2003 ISRS
    • /
    • pp.988-990
    • /
    • 2003
  • IKONOS image mapping is being considered a possible replacement to the traditional mapping in many countries due to their ease of access to current data and their potential high resolution. Survey Department of His Majesty's Government completed traditional orthophoto mapping of all urban and semi-urban areas of the country. The 1:5000 monochrome orthophoto maps of Kathmandu Valley were completed in 2003. In 2002, as a test, production of a near natural colour Image Map at 1:5000 scale of a part of Kathmandu Valley based on IKONOS data was carried out. A conventional line map plotting of the same area at 1:5000 was also prepared. The objective of the pilot project was to assess the geometric accuracy and the information content of these maps. The details of the study and their results are underlined. The findings of the study helps to explain whether IKONOS image map can replace conventional orthophoto map at 1:5,000 for urban areas of Nepal like Kathmandu.

  • PDF

A Portfolio Model for National IT R&D Strategy Project Selection Methods

  • Ryu, Dong-Hyun;Lee, Woo-Jin
    • Journal of information and communication convergence engineering
    • /
    • 제9권5호
    • /
    • pp.491-499
    • /
    • 2011
  • In this paper, we offer a new strategic portfolio model for national IT R&D project selection in Korea. A risk and return (R-R) portfolio model was developed using an objectively quantified index on the two axes of risk and return, in order to select a strategic project and allocate resources in compliance with a national IT R&D strategy. We strategize using the R-R portfolio model to solve the non-strategy and subjectivity problems of the existing national R&D project selection model. We also use the quantified evaluation index of the IT technology road map (TRM) and the technical level reports (TLR) for the subjectivity of project selection, and try to discover the weights using the analytic hierarchy process (AHP). In addition, we intend to maximize the chance for a successful national IT R&D project, by selecting a strategic portfolio project and balancing the allocation of resources effectively and objectively.

프로젝트 위험관리강화를 통한 원가개선의 6시그마 사례 (A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management)

  • 정하성;이동화;이민구
    • 품질경영학회지
    • /
    • 제33권3호
    • /
    • pp.135-148
    • /
    • 2005
  • This paper considers a six sigma project for reducing the project costs through project risk management. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A risk management process map is used to identify process input and output variables. Seven key process input variables are selected by using C&E diagram and X-Y matrix and finally four vital few input variables are selected by the related statistical analysis. The optimum alternatives of the vital few input variables are obtained by the method of PUGH matrix. The process is running on control plan and we obtained substantial project cost reductions in early stage of the control phase.

Long-Term Wind Resource Mapping of Korean West-South Offshore for the 2.5 GW Offshore Wind Power Project

  • Kim, Hyun-Goo;Jang, Moon-Seok;Ko, Suk-Hwan
    • 한국환경과학회지
    • /
    • 제22권10호
    • /
    • pp.1305-1316
    • /
    • 2013
  • A long-term wind resource map was made to provide the key design data for the 2.5 GW Korean West-South Offshore Wind Project, and its reliability was validated. A one-way dynamic downscaling of the MERRA reanalysis meteorological data of the Yeongwang-Gochang offshore was carried out using WindSim, a Computational Fluid Dynamics based wind resource mapping software, to establish a 33-year time series wind resource map of 100 m x 100 m spatial resolution and 1-hour interval temporal resolution from 1979 to 2012. The simulated wind resource map was validated by comparison with wind measurement data from the HeMOSU offshore meteorological tower, the Wangdeungdo Island meteorological tower, and the Gochang transmission tower on the nearby coastline, and the uncertainty due to long-term variability was analyzed. The long-term variability of the wind power was investigated in inter-annual, monthly, and daily units while the short-term variability was examined as the pattern of the coefficient of variation in hourly units. The results showed that the inter-annual variability had a maximum wind index variance of 22.3% while the short-term variability, i.e., the annual standard deviation of the hourly average wind power, was $0.041{\pm}0.001$, indicating steady variability.

농촌마을종합개발사업 경관계획수립에 관한 연구 - 예산 오촌권역 - (A Study on the Rural Landscape Planning in Rural Village Development Projects - Yesan O-chon District -)

  • 백승석;민흥기;문영숙;정기호
    • 농촌계획
    • /
    • 제19권1호
    • /
    • pp.179-188
    • /
    • 2013
  • This study has been performed with the purpose of making Rural Village Development Project Landscape Plan in which landscape characteristics in rural villages are reflected so that landscape in the medium to long term shall be established and managed. The issue that has been brought up is that procedures of Rural Landscape Plan and Rural Village Development Project Landscape Plan have been focused on facilities. The study carries out resources survey in agriculture, daily life and history and culture to make Rural Village Development Project Landscape Plan in O-chon district. Through landscape evaluation map participated by local residents, landscape management areas which they can form and manage have been established. The study also suggests Projects and guidelines appropriate to management areas. The study has a different signification from the existing Rural Village Development Project Landscape Plan which is fundamentally devoted to specific projects. The study shows Landscape Plan in the medium to long term and suggests guidelines available to be used by residents.

충청북도 농촌중심지활성화사업에 적용된 거점강화전략과 계획의 특성 (Characteristics of the Strategies and Plans for Activating Central Area in the Rural Town Regeneration Projects in Chungcheongbuk-do)

  • 이창우;임지택
    • 한국농촌건축학회논문집
    • /
    • 제22권4호
    • /
    • pp.63-70
    • /
    • 2020
  • Due to population decline and aging, many rural towns have become increasingly declining, and the government has been carrying out the rural town regeneration project to activate central area with the concept of compact city. The purpose of this study is to analyze the strategies and plans promoted in the rural town regeneration projects for the six towns in Chungcheongbuk-do and to identify their characteristics. The main subjects of the study are hardware plans such as the public facility plans and streetscape plans, which were carried out by local governments to revitalize the centre. In particular, the contents of each detailed plan, the location of each facility, detailed budget, and relationship between public facilities and commercial street in the six cases were analyzed by distribution map, relationship map and data comparison. Through this, the characteristics of the new application methods of each project to strengthen the central area were analyzed and classified into five types. The results of the study are to provide useful basic research to determine the direction of the project and select the contents of the plan in the rural town regeneration projects.