• Title/Summary/Keyword: Project Manager

Search Result 378, Processing Time 0.03 seconds

A Study on the Evaluation Criteria of Safety Competency of Construction Manager (건설사업관리자 선정평가에 안전역량 평가항목 적용 연구)

  • Kim, Dosu;Joh, Hyunwoo;Kim, Gwanghee;Joo, Jinkyu;Shin, Yoonseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.46-54
    • /
    • 2020
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA (Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

OPTIMIZING QUALITY AND COST OF METAL CURTAIN WALL USING MULTI-OBJECTIVE GENETIC ALGORITHM AND QUALITY FUNCTION DEPLOYMENT

  • Tae-Kyung Lim;Chang-Baek Son;Jae-Jin Son;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.409-416
    • /
    • 2009
  • This paper presents a tool called Quality-Cost optimization system (QCOS), which integrates Multi-Objective Genetic Algorithm (MOGA) and Quality Function Deployment (QFD), for tradeoff between quality and cost of the unitized metal curtain-wall unit. A construction owner as the external customer pursues to maximize the quality of the curtain-wall unit. However, the contractor as the internal customer pursues to minimize the cost involved in designing, manufacturing and installing the curtain-wall unit. It is crucial for project manager to find the tradeoff point which satisfies the conflicting interests pursued by the both parties. The system would be beneficial to establish a quality plan satisfying the both parties. Survey questionnaires were administered to the construction owner who has an experience of curtain-wall project, the architects who are the independent assessor, and the contractors who were involved in curtain-wall design and installation. The Customer Requirements (CRs) and their importance weights, the relationship between CRs and Technical Attributes (TAs) consisting of a curtain-wall unit, and the cost ratios of each components consisting curtain-wall unit are obtained from the three groups mentioned previously. The data obtained from the surveys were used as the QFD input to compute the Owner Satisfaction (OS) and Contractor Satisfaction (CS). MOGA is applied to optimize resource allocation under limited budget when multi-objectives, OS and CS, are pursued at the same time. The deterministic multi-objective optimization method using MOGA and QFD is extended to stochastic model to better deal with the uncertainties of QFD input and the variability of QFD output. A case study demonstrates the system and verifies the system conformance.

  • PDF

Time Management Status of Small Contractors and Suggestions on Education for Time Management in Colleges (소규모 건설회사의 공정관리 현황과 대학의 공정관리 교육방안)

  • Jang, Myung-Houn;Yi, Yong-Kyu
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.3
    • /
    • pp.413-422
    • /
    • 2016
  • A construction manager tries to complete a construction project within its duration and budget using available resources. Schedule networks such as Bar-chart and CPM(critical path method) are used to finish the project within the duration. A survey shows that small contractors prefer Microsoft Excel to commercial time management softwares to manage construction time in their fields, because the Excel is useful to control cost with schedule and few time management experts works in the small contractors. A college produces talented graduates who are able to manage time of a construction project. But the quality and quantity of college eduction for time management is insufficient. Another survey shows that majors in Architectural engineering of local national universities have the curriculum for time management, and teach mainly the theory of network scheduling and how to make the network schedule. The several majors have classes for the theory and exercise of commercial time management softwares in several majors. It is necessary to educate time management experts able to use Bar-chart and commercial time management softwares for the small contractors.

Direction of CM Services Defect Liability in the CM Contract

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.3
    • /
    • pp.209-217
    • /
    • 2013
  • The execution of a construction project involves the engagement of many participants. Generally, the Authority uses CM to certify that the Work is built according to the contract documents. The CM work scope is expressed in the Construction Technology Management Act and its Regulation. The mandated and delegated CM services are limited to the construction period. If Contractor is required to repair a construction defect, the Contractor should bear the burden of the inspection service for the defect repair, because it is associated with him. Nevertheless, CM should submit a bond to provide the inspection and supervision service for the defect repair. These may result in conflict with each liability. Therefore, CM service in the law and regulation was investigated and analyzed in this study to classify the characteristics of CM contracts, and it was suggested that the CM liability for the inspection and supervision service for the defect repair should be reconsidered.

Analyzing the Working Conditions for Female Field Managers Employed by General Contractors

  • Son, Chang-Baek;Shin, Won-Sang;Lee, Dong-Eun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.441-448
    • /
    • 2013
  • In recent years, the number of female workers pursuing careers in the construction engineering and management field has increased, despite the fact that the job positions have been traditionally considered as retaining job functions and/or qualities that are more appropriate to male than female. This may be attributed to the fact that the positions also require delicate and/or detail-oriented job functions, which can be successfully performed by female. It is important for project participants to understand the working conditions for female field managers by analyzing their job performance. This study collects expert opinions regarding female's managerial performance on job site. Survey questionnaires were administered to two focus groups, male and female field managers who work for general contractors. This study contributes to encouraging female's social and economic involvement by investigating the challenges they face in the workplace, and provides measures to respond to such challenges.

A Improvement of Sub-contractor Management in Domestic Building Construction Sites - Through Specialized Quality Work of Sub-contractors (국내 건설공사 현장의 하도급관리 개선방안 - 하도급자의 품질업무 전문화를 통하여)

  • Son Hyun-Duck;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.292-295
    • /
    • 2002
  • A purpose of subcontractor management succeed in construction project. Specially in the subcontractor management of quality management, it is necessary that subcontractors not only acquire ISO 9000 quality system certification but also continuously and without a break fulfill ISO 9000 quality system. As a result, we proposed that a general contractor play an important role in a manager of subcontractors to keep up the ISO 9000 duality system of subcontractors.

  • PDF

A Management of Child Care Facility for Electrical Safety using Home-Smart Cabinet Panel(H-SCP) (지능형 홈 분전반을 이용한 영유아 시설 전기 안전 관리)

  • Ahn, Jae-Min;Lim, Young-Bae;Bae, Seok-Myeong
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2144-2145
    • /
    • 2011
  • We carry out a demonstration project to verify performance of a Home- Smart Cabinet Panel(H-SCP) at the child care facility. It is difficult to prevent an electrical disaster using a existing cabinet panel because electrical events are invisible and unforeseeable. So we construct a integrated information system with a Home-Smart Cabinet Panel(H-SCP) for management of low-voltage customers. The integrated information system with the H-SCP maintain the transmitted data from H-SCP, alert a electrical event to a administrator and show a state of customer health in real time respectively. A manager of electrical safety can prevent electrical disaster to maintain electrical facilities after analysis on the integrated information system.

  • PDF

An Effective Project risk Management Based on Systems Engineering (시스템엔지니어링에 기반한 효과적인 리스크 관리)

  • Kang, Top;Kim, Sung-Cheol;Oh, Jung-Taek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.1
    • /
    • pp.43-51
    • /
    • 2011
  • SE generally defines approaching ways of conducting identification, verification and integration of an optimized product and process solution to meet customer's needs by leveraging organizational competency in engineering and management. To successfully develop a new product under mass production contract, it is important to efficiently carry out the program by ensuring that three major competencies are secured; core technology, system integration, and program management. For successful implementation of tasks in the three areas, systematic execution is called for, which requires identifying risk factors in advance. In particular, comprehensive risk management role and responsibility is required for program management. Success of a development program is determined by complex elements of human resources, organization culture, and overall competency of an organization in technology and program management, including capability of the program manager. In this paper, a risk management solution is suggested to lead a program to success with a more efficient way through actual risk management by the concept of SE around the above three areas.

Turbulence Models for the Surface Discharge of Heated Water

  • Choi, Hung-Sik;Lee, Kil-Seong
    • Korean Journal of Hydrosciences
    • /
    • v.3
    • /
    • pp.61-79
    • /
    • 1992
  • In oder to predict the dispersion of a thermal discharge with strong turbulent and buoyant effects, the development of a numerical model using turbulence model and its application are significantly increased. In this study, a three-dimensional steady-state model for the surface discharge heated water into quiescent water body is developed. For the model closure of turbulent terms the four-equation turbulence model is used. For economic mumerical simulation, the elliptic governing equations are transformed to the partially parabolic equations. In general, the simulated results by the present model agree well with the experimental results by Pande and Rajratnam (1977). The model characteristics are presented in comparison with the predicted results from the two-eqauation turbulence model by McGuirk and Rodi (1979).

  • PDF

An Estimating System for the CO2 Emissions using Discrete Event Simulation (이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템)

  • Yi, Chang-Yong;Gwak, Han-Seong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF