• 제목/요약/키워드: Project Life Cycle Cost

검색결과 172건 처리시간 0.033초

INTEGRATED LIFE-CYCLE COST ANALYSIS CONSIDERING ENVIRONMENTAL COSTS: A HIGHWAY PROJECT CASE

  • Woo-Sik Jang;Heedae Park;Sungmin Kim;Seung Heon Han;Jong Seo Jeon
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.273-279
    • /
    • 2011
  • Concerns over the environment have spawned a number of research studies in the construction industry, as the construction of built environments and large infrastructures involves diverse environmental impacts and loads of hazardous emissions. Many researchers have attempted to quantify these environmental loads, including greenhouse gases, carbon dioxide, nitrogen dioxide, and sulfur dioxide, to name a few. However, little research has been conducted regarding integrating the life-cycle assessment (LCA) of environmental loads with the current life-cycle cost analysis (LCCA) approach. This study aims to estimate the environmental loads as a monetary value using the European Climate Exchange (ECX) rate and, then, to integrate those impacts with the pure construction cost. Toward this end, this study suggests an integrated approach that takes into account the environmental effect on the evaluation of the life-cycle cost (LCC). The bill of quantity (BOQ) data of a real highway project are collected and analyzed for this purpose. As a result, considering the environmental loads in the pavement process, the total LCC increased 16% from the traditional LCC cost. This study suggests an integrated approach that will account the environmental effect on the LCC. Additionally, this study is expected to contribute to better decision-making, from the perspective of more sustainable development, for government as well as for contractors.

  • PDF

정보시스템 수명주기에 인프라가 미치는 영향관계에 대한 연구 (A Study on the Effects of ICT Infrastructure Cost on Information System Life Cycle)

  • 문흥근;김정호;이석준;박성식
    • 정보화연구
    • /
    • 제10권3호
    • /
    • pp.323-334
    • /
    • 2013
  • 사업기획, 프로젝트 관리, 품질 등 정보시스템의 구축에 관한 연구는 많이 수행되었다. 정보시스템의 수명주기에서 신규투자는 20%의 자원 비중을 차지하고 있고, 유지보수와 인프라가 자원 비용의 80%를 차지하고 있어 유지보수에 대한 관심과 연구가 매우 필요하다. 그동안의 정보시스템 경제적 수명주기 연구는 유지보수 비용을 활용하여 진행되었으며, 인프라 비용의 반영이 정보시스템의 경제적 수명주기에 어떤 영향을 주는지에 대한 연구가 없었다. 본 연구는 정보시스템 수명주기 비용의 40%를 차지하고 있는 인프라 비용을 경제적 수명주기 산정에 어떻게 반영해야 하는지, 그리고 인프라 비용 반영에 따른 정보시스템의 경제적 수명주기 변화에 대하여 살펴보았다.

Life Cycle Cost Breakdown Structure Development of Buildings through Delphi Analysis

  • Jeong, Jae-Hyuk;Shin, Han-Woo;Ryu, Han-Guk;Kim, Gwang-Hee;Kim, Tae-Hui
    • 한국건축시공학회지
    • /
    • 제12권5호
    • /
    • pp.528-538
    • /
    • 2012
  • With domestic construction projects becoming bigger, more specialized and more advanced, the construction industry is striving to improve quality and quantity, and is diversifying functions and shapes. Nevertheless, the process of a construction project causes problems when we estimate construction price, because the cost breakdown structures are different in each step. The primary aim of this study was to estimate building life cycle cost using the Delphi method. The cost breakdown structure for life cycle cost was classified into planning, design, construction, maintenance and waste disposal, and each detailed classification was determined by estimating life cycle cost. Moreover, the developed cost breakdown structure is verified by consulting with experts to secure objectivity and validity.

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

댐 공사에서의 Fast Track을 적용한 생애주기분석에 관한 연구 (The Study on Application of Fast Track Method for Dam Project Life Cycle′s Analysis)

  • 윤재호;문영일
    • 한국수자원학회논문집
    • /
    • 제36권5호
    • /
    • pp.715-724
    • /
    • 2003
  • 이 연구의 목적은 사회간접자본의 대표적인 시설인 댐과 같이 기획, 조사, 타당성분석 단계에서부터 설계, 계약, 시공 및 유지관리단계까지 건설 생애주기가 긴 경우 Risk에 노출되는 시간 또한 길어져 건설기간 지연에 따른 비용증가는 물론 적기 미 준공시의 증액비용과 이용연기에 따른 편익손실로 국가 전체의 경쟁력을 저하시킴으로 이들 문제점을 감소시키는 방법을 모색하는 것이다. 이에 본 연구에서는 생애주기 각 단계별로 경제성분석을 통한 공기와 비용을 연계 분석하여 효율적이고 체계적인 사업수행단계 및 건설공정 Network모델을 도출하고 이 성과를 토대로 생애주기분석에 있어 Fast Track기법을 적용하는 하나의 새로운 방안으로 제안하고자 한다.

각종지원금제도에 의한 냉열원시스템의 라이프 사이클 코스트 분석 (Life Cycle Cost Analysis of Primary Cooling System by Systematic Support Cost)

  • 김종민;정순성;최창호
    • 한국태양에너지학회 논문집
    • /
    • 제22권4호
    • /
    • pp.97-106
    • /
    • 2002
  • The purpose of this study is to analyze the life cycle cost of primary cooling system by systematic support cost. Life Cycle Cost(LCC) is the process of making an economic assessment of an item, area, system, or facility by considering all significant costs of ownership over an economic life, expressed in terms of equivalent costs. The essence of life cycle costing is the analysis of equivalent costs of various alternative proposals. In order to select economical primary cooling system in early heat source plan stages, the research investigates cost items and cost characteristics during project process phases such as planning/design, construction, maintenance /management, and demolition/sell phases. The study also analyze the life cycle cost by capacity leading to suggest the most economical primary cooling system by systematic support cost.

Implementing an Application Tool of Life Cycle Cost Analysis (LCCA) for Highway Maintenance and Rehabilitation in California, USA

  • Kim, Changmo;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.376-380
    • /
    • 2015
  • Life-Cycle Cost Analysis (LCCA) for highway projects is known as an effective analytical technique that uses economic principles to evaluate long-term alternative investment options, especially for comparing the values of alternative pavement design structures and construction strategies. In the Unites States, the 2012 Moving Ahead for Progress in the 21st Century Act (MAP-21) amended the United States Code to mandate that the United States Government Accountability Office (GOA) conducts a study of the best practices for calculating life-cycle costs and benefits for the federally funded highway projects in 2013. The RealCost 2.5CA program was developed and adapted as an official LCCA tool to comply with regulatory requirements for California state highway projects in 2013. Utilization of this California-customized LCCA software helps Caltrans to achieve substantial economic benefits (agency cost and road user cost savings) for highway projects. Proper implementation of LCCA for roadway construction and rehabilitation would deliver noticeable savings of agency's roadway maintenance cost especially in developing counties where financial difficulties exist.

  • PDF

주요 건물군의 유사도 정량화 측정 시스템 (Quantitative estimation system development for project similarity)

  • 이은지;최병일;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.162-163
    • /
    • 2014
  • Operation and maintenance stage consists the largest portion of project life cycle cost. Appropriate management and analysis of such stages have massive effect on the total project cost. The effective prediction of optimized repair period is one of main factors in ㅌ management. However, it has been analyzed that the prediction of appropriate repair period revealed limitations in reliability. Therefore, this study suggests a methodology of repair period prediction by dividing finished projects into similar groups with same properties to be compared with the target project using quantitative variables.

  • PDF

확률적 방법에 의한 철도시설물의 LCC 분석 (Probability- based Life Cycle Cost Analysis of Railroad Structures)

  • 소병춘;최영민;조선규;신경철;정재동
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.971-976
    • /
    • 2004
  • The management of railroad structures is more difficult and complicate because there are many structures such as rail, bridge, tunnel, station, and so on. Therefore, LCC(Life Cycle Cost) analysis of railroad structures as public infrastructure must contain a maintenance cost as well as an initial cost in order to make a more effective management during the life cycle on the design phase. This paper presents a cost classification scheme considering user costs such as value of delayed time of passenger and freight. Also, in this study it is developed a probabilistic life cycle cost(PLCC) analysis model of railroad structures taking into account uncertainties and variations of input variables in order to analyze LCC. It may be stated that the model proposed in this study can greatly contribute to the making optimal decision, the estimate of the maintenance cost and the allocate of budget in the project of railroad structures.

  • PDF

한국형 고속전철 시스템의 비용분석 (Life Cycle Cost Analysis for Korea High-Speed Rail Project)

  • 이태형;목진용;박춘수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.376-381
    • /
    • 2002
  • In this study, we have analyzed the cost of korea high-speed rail project. The predicted cost in planning phase and adjustment data to 5th year are collected. Then, predicted cost is compared with adjustment in year/item/system base. We make a project history table for criteria to review project history and research & development activity. We have developed CBS(cost breakdown structure) and allocated adjustment data to them. It is shown that cost prediction related to research St development activity in planning phase is relatively correct.

  • PDF