Investigating delay factors in construction industry: A Korean perspective

  • Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.177-190
    • /
    • 2006
  • Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.

PROPOSING MANAGEMENT OF WORK PRIORITY TO REDUCE CONSTRUCTION FAILURE CLAIMS

  • In-ho Kim;Moon-Seo Park;Hyun-Soo Lee
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1171-1176
    • /
    • 2005
  • Dispute related to construction projects involving numerous persons is one of the biggest challenges faced by contractors today. It costs a substantial amount of money and time in resolving these kinds of claims. Recently, with the changes in the construction environment and thought of relation with owner, the number of construction claims has increased. But, a majority of these claims do not prevail, and in fact, frequently get dismissed in its entirety. The reasons for such dismissals include the ignorance about the claims, lack of clear and convincing evidence, and so on. But most of reasons are the claims are not managed well on construction process. This paper analyzes the failure causes by relying on past claim failure cases, and then drew works that have connection with failure causes through interview. It also presented importance degree of construction management works.

  • PDF

금융권 핵심 PMO 기능과 운영형태에 관한 연구 (A Research on the core PMO function and operation type for the IT project of financial industry in Korea)

  • 이재범;이재철;장윤희
    • 디지털융복합연구
    • /
    • 제7권3호
    • /
    • pp.35-47
    • /
    • 2009
  • The IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques, TQM to decrease project failure, and to increase IS performance. But, in spite of such various efforts, the latest Standish Group's research indicates that the project scale is bulkier than $1{\sim}2$ year ago and IS development project's batting average falls from 34% to 28% at the same time, proceeded project is increased, and project discharged arrives to $15%{\sim}18%$. According to a research, success possibility increased by 37% after a year of PMO introduction, and increased sharply by 62% after 2 years and by 65% after S years. This research has a goal to survey how the PMO function and operation type affect the IS project performance in the financial industry. I determine nine independent variables and three dependent variables from previous researches. The results of this study are that the four core functions of PMO have relationship with project performance. But, technical support function does not relate with organization performance. Among the four core PMO operation types, three types have an effect on the IS project performance except the perfectionist type.

  • PDF

AHP를 이용한 프로젝트 선정에 관한 실증적 연구 (An Study on Project Selection based on Analytic Hierarchy Process)

  • 김주완;이욱기;김판수
    • 대한안전경영과학회지
    • /
    • 제9권2호
    • /
    • pp.195-214
    • /
    • 2007
  • The purpose of this study is to explore the applicability of AHP(Analytic Hierarchy Process) to select more productive projects among various proposed projects in a particular company. To achieve this research objective, the characteristics of project evaluation and selection are first reviewed with respect to when, where, and how the decision is made. Then the theoretical basis of the AHP is briefly reviewed along with its mathematical underpinnings to construct the framework of project evaluation and selection. To be more specific, the evaluation and selection criteria were reorganized in the AHP-based framework to make the process of project evaluation and selection more productive. Project evaluation and selection is one of the most important activities for the most companies to be more advantageous in the market. Despite the importance of decision making process of project selection, not many of how to choose the best project were suggested as the reliable project selection methods in the industries. It may be because it involves various activities related to conflict resolution among different evaluation criteria, high uncertainties of market, and the unclear tradeoff among various project objectives. Furthermore, the decision, once made at this point, tends to be irrevocable until the whole process turns out to be a complete success or failure. As the result, the AHP method showed better financial performance rather than the traditional method in a case study.

실시간 프로젝트 위험관리를 위한 베이지안 네트워크 모형의 개발 (Developing a Bayesian Network Model for Real-time Project Risk Management)

  • 김지영;안선응
    • 산업공학
    • /
    • 제24권2호
    • /
    • pp.119-127
    • /
    • 2011
  • Most companies have been increasing temporary work projects to maximize the usage of their resources. They also have been developing the effective techniques for analyzing and managing the state of the projects. In order to monitor the state of a project in real-time and predict the project's future state more accurately, this paper suggests the Bayesian Network (BN) as a tool for discovering the causes of project risk and presenting the failure probability of the project. The proposed BN modeling method with consideration of the Earned Value Management (EVM) method shows how to induce the predictive and conditional probability of the risk occurrence in the future. The advantages of the suggested model are (1) that the cause of a project risk can be easily figured out via the BN, (2) that the future value of the project can be sufficiently increased by updating relevant components of the project, and (3) that more credible prediction can be made in the similar and future situation by using the data obtained in current analysis. A numerical example is also given.

대규모 공공투자사업의 경제적 타당성 평가와 환경영향평가 통압 방안 - 새만금 간척사업을 사례로 - (Integration of the Feasibility Assessment Procedure and EIA of the Big Public Investment Project : In the Case of the Saemangeum Reclamation Project)

  • 최미희
    • 환경영향평가
    • /
    • 제11권2호
    • /
    • pp.93-107
    • /
    • 2002
  • The choice of big public investment project needs an appropriate feasibility analysis before it is implemented, bemuse a rot wisely chosen one would bring about big and longrun societal costs. But the feasibility analysis for the big public investment project in Korea has been done without linking the economic benefits and environmental damages. Consequently social conflicts arose frequently during and after project implementation, owing to such concerns asincreasing costs and serious ecological damages. The recent social conflict over the Saemangeum Project is a typical case. This reclamation project began in 1991 and finished 60% of the whole process in 1999, when its feasibility was again assessed under the public pressure by the joint assessment team consisting of both citizen's and government's professionals. Even the assessment report by this joint team could not show the convincing results owing to the improper assessment procedure and failure to set proper feasibility criteria. This paper pointed out the limitations of our current procedure of feasibility assessment and identified the concrete problems that atosee during the recent reassessment process of the Saemangeum reclamation project by the joint team. In order to improve the current problem-ridden practices, it is concluded by the policy recommendation for establishing a right feasibility assessment procedure for the public investment projects.

프로젝트관리 성숙도별 리스크관리 적용 (On the Application of Risk Management by Levels of Project Management Maturity)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제34권2호
    • /
    • pp.19-29
    • /
    • 2011
  • The uncertainty of a project generates risks hindering the goal achievement of the project, and the risks affect the success or failure of the project significantly. Risk management, a part of the project management, includes various processes, and there are also various tools or techniques applicable to that. In an organization, the application of project management develops gradually from low to high maturity, and the organization should choose and implement a method of application proper for the level of its maturity. This article suggests a method to reduce inefficiency of the management and how to apply risk management by levels of maturity for easier application. For this, the stages of project management maturity levels were divided into the introduction, development, and maturity step, and methods of risk management suitable for each stage were applied. And methods of risk management that need to be applied by the levels of project maturity are divided into three factors : risk management processes, risk management tools and techniques, and risk management standards and templates. It is expected to be favorable approaches for the application of risk management in an organization to divide those factors into more concrete processes, tools, techniques, and standards and apply them by the levels of management maturity.

경전철사업에서의 철도전문기관과 지자체 간의 협력사례 (Cooperation Case between Railway Specialized Authorities and Local Government in LRT Project)

  • 송재일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2217-2224
    • /
    • 2011
  • The railway industry has well developed with Korea's economic growth as follows - Industrial railway's electrification in 1973, Seoul subway opening in 1974, Busan subway opening in 1985, High speed railway opening in 2004. But LRT as city transportation means has been faced with many difficulties. Looking at the LRT projects implemented until now, there are some issues like the transportation demand, the quality & safety of RS and facilities, the poor management of inhabitant complaints and the failure to maintain policy coherence. They have caused not only the project schedule to extend but also the project costs to increase, even to obstruct the project progress itself in some cases. These risk factors become the obstacle of LRT project's success, but it is said that more basic problem is the lack of risk management capability of competent authorities in railway business. Under these circumstance, Railway specialized Authorities and Local government have cooperated to identify various risk factors and to prepare the measures in advance, so we try to introduce this cooperation case, which will help other local government as an useful reference.

  • PDF

건설기획단계에서의 위험요인 도출 (An Extraction of the Risk Events in the Construction Planning Phase)

  • 권순오;김선규;이낙운
    • 산업기술연구
    • /
    • 제25권B호
    • /
    • pp.99-106
    • /
    • 2005
  • The planning phase of construction project success or failure of the enterprise decision the 1st dangerous duration which occurs very there is a possibility of making with the phase which is important, of construction project in life cycle most many risk. But the risk management from planning phase well does not become accomplished is the actual condition from existing construction project. Consequently, it classifies the risk event from project initial planning phase of construction project from this study which probably is substantial risk event the possibility of accomplishing from a planning phase successfully in order to be.

  • PDF

A Study of Applying Extreme Programming Method in Mobile Game Development Environment

  • Seo, Yeung-Su;Jung, Hun;Park, Hae-Woo;Yu, Chun-Gun;Lee, Jun-Hyuk;Kang, Byung-Wook
    • 한국정보컨버전스학회:학술대회논문집
    • /
    • 한국정보컨버전스학회 2008년도 International conference on information convergence
    • /
    • pp.59-62
    • /
    • 2008
  • When performing a project, the most important thing is building a result with planned quality within development period. Particularly, if the project is delayed or has no good quality in the case of the mobile game development project which is sensitive to the release time and quality, it is immediately connected to the failure of the project. Extreme Programming is a methodology that divides the development cycle into smaller units for reducing the risk factor of the project in which the development period is important. In this paper, we suggest the Expanded Extreme Programming for mobile game development environment in which the development period and quality are important

  • PDF