BENCHMARKING THE PREPROJECT PLANNING PRACTICE FOR THE BUILDING CONSTRUCTION INDUSTRY IN TAIWAN

  • Yu-Ren Wang;Yi-Jao Chen;Chun-Yin Yu;Shin-Si Jang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.324-329
    • /
    • 2011
  • Significant decisions are made by the project team during the early planning phase of capital facility project developments. The preproject planning phase begins after a decision is made to proceed with a project concept and continues until the detail design stage. Many of the industry practitioners and researchers have recognized the importance of preproject planning and that inadequate early planning is one of the key factors affecting project success. Nevertheless, the preproject planning practices vary significantly for the construction industry in Taiwan and the quality of preproject planning relies heavily on individual project team's experience. This research sets out to benchmark the preproject planning practice for the building construction industry in Taiwan. From late 2007 to early 2010, the researchers collected information from a total of 92 building construction projects using questionnaire survey. The analysis results show that the surveyed projects with better preproject planning have better cost and schedule performances on average. It is recommended that project team spend more efforts in the preproject planning stage to have a better chance of achieving project success.

  • PDF

A Portfolio Model for National IT R&D Strategy Project Selection Methods

  • Ryu, Dong-Hyun;Lee, Woo-Jin
    • Journal of information and communication convergence engineering
    • /
    • v.9 no.5
    • /
    • pp.491-499
    • /
    • 2011
  • In this paper, we offer a new strategic portfolio model for national IT R&D project selection in Korea. A risk and return (R-R) portfolio model was developed using an objectively quantified index on the two axes of risk and return, in order to select a strategic project and allocate resources in compliance with a national IT R&D strategy. We strategize using the R-R portfolio model to solve the non-strategy and subjectivity problems of the existing national R&D project selection model. We also use the quantified evaluation index of the IT technology road map (TRM) and the technical level reports (TLR) for the subjectivity of project selection, and try to discover the weights using the analytic hierarchy process (AHP). In addition, we intend to maximize the chance for a successful national IT R&D project, by selecting a strategic portfolio project and balancing the allocation of resources effectively and objectively.

Development of the Training Course for Project Managers (프로젝트관리자 양성을 위한 실무 교육과정 개발)

  • Ko, Jesuk
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.2 no.1
    • /
    • pp.61-67
    • /
    • 2006
  • Project management is the process of guiding the project from its beginning through its performance to its closure. Project management includes three basic operations which are planning, organizing and control. In particular, the project managers role and responsibility is regarded as the most important part when companies are supposed to work together. The purpose of this study is to address the knowledge and skills requirement of project manager. The demand of project manager has been increasing to perform accurately and share information effectively. In this paper, the proposed course can be used to provide a rudimentary scheme to train and develop knowledge and skills of project managers.

  • PDF

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

Project Management : Simplifying or Exacerbating (프로젝트를 위한 프로젝트 관리의 역할)

  • Qureshi, Sheheryar Mohsin;Kang, Chang Wook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.2
    • /
    • pp.9-18
    • /
    • 2014
  • The purpose of this research is to initiate discussion to simplify existing tools and methods for managing projects which make project management a harder job to perform and a tougher task to handle. Additionally, summarizing the definitions of "project" that have been found from reviewing the relevant literature, it deliberates on revising the duties and responsibilities of project manager and proposes performance expectancy triangle explaining a relationship among accountability, responsibility and authority - the Tri-butes. It sheds light on several factors critical to the success of projects. Finally, we propose a function indicating that customer demands or desires greatly affect project complexity.

Prioritization of Price Volatility Management Strategies in Construction Projects

  • Joukar, Alireza;Nahmens, Isabelina;Harvey, Craig
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.15-25
    • /
    • 2017
  • The existence of material price volatility in construction projects puts forward substantial risks for all parties involved. Depending on the parties involved in the project, type of contracts, and state of the market various risk management strategies are practiced by contracting parties to manage project risks related to price volatility. Unfortunately, in many cases companies fail to select an adequate approach to better manage volatilities of material prices due to the lack of a decision support system to aid in the selection of an appropriate strategy based on the project characteristics. The aim of this study is to identify critical project factors and align them to documented strategies to manage price volatility based on an extensive literature review and industry interviews. This study found Integrated Project Delivery (IPD) as the ideal strategy with respect to project duration; quantitative risk management methods with respect to the cost; and Price Adjustment Clauses (PAC) with respect to the risk allocation, as the top price volatility management strategies.

A STUDY ON THE SELECTION CRITERIA OF DELIVERY SYSTEM BY TYPES OF THE PUBLIC CONSTRUCTION PROJECTS

  • Eun-A Choi;Su-Man Choi;Jai-Dong Koo;Nam-Gi Lim;Sang-Beom Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1440-1445
    • /
    • 2009
  • Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.

  • PDF

Development of Criteria for Evaluating Projects through Running of Basic Projet Courses in Computer Science & Information Engineering (기초프로젝트 과목 운영을 통한 컴퓨터.정보공학 분야의 프로젝트 평가 기준 개발)

  • Cho, Soosun
    • Journal of Engineering Education Research
    • /
    • v.17 no.6
    • /
    • pp.77-83
    • /
    • 2014
  • This paper deals with the practical experience and lessons to develop the criteria for evaluating projects in Computer Science & Information Engineering. In engineering education, project-based learning is different from problem-based learning. Project tasks are closer to professional reality. And self-direction is stronger in project work. In this paper, the development of project evaluation criteria is introduced with consideration of these differences. It is explained through running examples of basic project courses in Computer Science & Information Engineering.

EVALUATING THE FEASIBILITY OF THE HIGHWAY ENGINEERING SCHEDULE USING SIMULATION TECHNIQUE

  • Liu Weijun;Yuan Jianbo;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.897-901
    • /
    • 2005
  • In the highway engineering, the performance, quantity and status of machines available for the project have direct impact on the project time. For instance, the status of machines, such as working or in trouble, have great influence on the activity execution. Therefore, while scheduling the project, the project manager always increases the spare machines or prolong the activity time to avoid delaying the project time when some of the machines are in trouble in construction site. However, how many are the spare machines and how long are the prolonged activity time, which are estimated subjectively by the manager. This subjective estimation has been criticized for systematically overestimating or underestimating quantity of the machines and the activity time. In the paper, we propose and prototype a model to simulate the status of the machines in construction site, and then to evaluate the schedule feasibility considering the performance, quantity and statues of the machines involved.

  • PDF