최근 국내외에서 다양한 BIM 지침이 개발된 바 있으며 관련 지침에서는 BIM 적용을 위한 기본원칙과 표준을 제시하고 있다. 그러나 시공단계의 대표적 기능인 공정관리 분야에 관한 BIM 적용 내용은 구체적이지 못하여 실무에서 활용하기에는 어려움이 따른다. 따라서 본 연구에서는 시공단계의 공정관리에 활용되는 대표적 BIM 도구인 4D CAD 시스템에 관한 기능별 성과품 납품 지침을 제시하고자 하였으며, 설문 분석을 통해 기능의 우선순위를 도출하여 프로젝트의 특성에 따라 사용자가 납품 지침의 수준을 선택적으로 활용할 수 있는 납품 지침을 구성하였다. 또한, 4D CAD 기반 공정관리 성과품 납품 지침의 활용방안을 제시하여 납품 지침의 활용성을 검증하였으며, 연구 결과는 시공단계 BIM 활용이 증대되는 시점에서 공정관리 BIM기능의 지침으로 활용성을 가질 수 있다.
As the portion of information systems (IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for scientific and efficient management of IS budget. Since IS budget makes much effect on the delivery time, quality and productivity of IS projects, the exact cost estimation is also necessary for the successful accomplishment of IS projects. The primary concern in the cost estimation of IS projects is software cost estimation, which requires the measurement of the size of softwares. There are two methods for sizing software : line-of-code approach, function point model. In this paper, we propose a function-point-based model for estimating software cost. The proposed model is derived by collecting about fifty domestic IT projects in public sector and analyzing their relationship between cost drivers and development effort. Since the proposed model is developed by simplifying the function point model that can be used only when detailed user requirements are specified, it can be also applied at project planning and budgeting phase.
Purpose Due to the complexity of policy environment in modern society, it is accepted as common basics of policy design to mix up a variety of policy instruments aiming the multiple functions. However, under the current situation of written-down policy specification, not only the public officers but also the policy researchers cannot easily grasp such frameworks as policy portfolio. The purpose of this study is to develop "Policy Attributes Taxonomy" identifying and classifying the public programs to help making decisions for allocative efficiency with effectiveness-based information. Design/methodology/approach To figure out the main scheme and classification criteria of Policy Attributes Taxonomy which represents characteristics of public policies, previous theories and researches on policy components were explored. In addition, to test taxonomic feasibility of certain information system, a set of "Feasibility Standards" was drawn from "requirements for well-organized criteria" of eminent taxonomy literatures. Finally, current government classification system in the area of social service was tested to visualize the application of Taxonomy and Standards. Findings Program Taxonomy Schemes were set including "policy goals", "policy targets", "policy tools", "logical relation" and "delivery system". Each program and project could be condensed into these attributes, making their design more easily distinguishable. Policy portfolio could be readily made out by extracting certain characteristics according to this scheme. Moreover, this taxonomy could be used for rearrangement of present "Program Budget System" or estimation of "Basic Income".
Objectives: The purpose of this study is to compare the perceptions of the rural healthcare service improvement project' performance and reorganization of public health centers between project staffs and local residents. Methods: Data collection from this study was performed in 141 project areas using structured questionnaires. Data analysis was used in SPSS 22.0 version. Results: The public health center staffs were more positive about the items for improving health facilities than the local residents. Residents in the Si area generally perceived performance as more positive than residents in the Gun area, while public health center staffs in the Gun area perceived performance as more positive than public health center staffs in the Si area. Local residents expressed negative opinions about the reduction in the number of branches of public health clinics and health medical clinics. Conclusions: In conclusion, careful improvement projects for rural health care and the establishment of health care systems will be necessary, reflecting the opinions of local residents, along with a variety of regional characteristics.
본 연구는 국내 의료기관 중심 보건의료·복지통합 서비스 활성 방안을 모색하기위하여 대구의료원 달구벌건강주치의사업, 삼척의료원 301 네트워크 사업, 부산의료원 3 for 1 사업 을 프로그램 논리모형을 적용하여 사례 비교하였다. 상황적 측면에서 세 사업 모두 보건의료·복지 서비스의 분절과 의료사각지대 문제를 해결하기 위해 고안되었으며, 투입 요소 중 인력은 모두 다학제 팀 구성 현황은 유사하였으나 구체적인 구성 분야, 채용 규모, 고용 형태, 에서는 기관별 차이가 있었다. 예산을 지원받는 재원 출처의 차이로 각 사업은 지역사회와 협력하고 지원하는 방식과 향후 방향성에서의 차별성도 확인할 수 있었다. 산출은 수혜대상자 수와 진료 건수에 차이가 있었으며, 투입인력 또는 운영비 대비실인원 수, 수혜대상 1인당 사업비 비교시 다른 결과를 확인하였다. 의료기관 중심의 보건의료·복지 통합제공체계의 설계 시 우선적으로 권고하는 상황은 안정적인 기금마련 기전을 확보하고 이에 합당한 대상자와 서비스 전달체계를 구축하라는 것이다. 또한, 의료기관 내 사례관리 전담기구로서 각 부문의 활동을 연계할 수 있도록 위탁이 아닌 전담부서 설치, 적정 규모의 채용, 안정적 고용 체계가 필요하며, 민·관 협력 및 경증부터 중증까지 제공할 수 있는 포괄적 제공체계 구축을 제안한다. 이를 통해 의료기관 중심보건의료복지 통합 서비스 제공 사업은 지역사회에서 풀리지 않는 난제였던 보건의료 서비스 강화와 촘촘한 연계를 가능하게 함으로 궁극적인 지역사회 건강안전망 역할 강화를 기대한다.
The concept of construction information systems (IS) is very comprehensive and subjective. Acronyms in relation to the construction IS may include BIM, CIC, IT, nD-CAD, ERP, CALS, KM and so on. These terminologies are used in a somewhat mixed way causing possible misunderstandings in research and practice of construction information systems. Moreover, ever-changing construction business environment has widely affected the roles and methods of utilizing construction IS. Examples of these changes are dissemination of alternative project delivery systems, global standardization under highly competitive overseas market, and advancement of information and communication technologies. In this context, the purpose of this paper is to propose a high-level framework for information systems in the construction industry. Several different concepts in the area of construction IS were investigated first in order to identify the major variables of the framework. Trends of research and real-world implementations were then analyzed to support the rationale of the variables. Finally, a framework was proposed by re-arranging the relevant issues. Findings of this paper indicate that different acronyms commonly share many similar concepts in their definitions, however, in each acronym, the motivations and approaches to implementing construction IS are very different. Different approach can provide maximum effectiveness, while overlaps may happen causing practical inefficiency.
International Journal of Computer Science & Network Security
/
제21권7호
/
pp.233-240
/
2021
The majority of the Web's success can be related to its productivity and flexibility. Web Services (WSs) have the means to create new patterns for the delivery of software capabilities. The WS easily provides the use of existing components available via the Internet. WSs are a new trend that shares ubiquitous systems with others, so the popularity of the Web is increased day by day with their associated systems. This paper will explore and adopt the possibility of developing a technique that will automate instructors' scheduling of timetables within a Web services environment. This technique has an advantage that facilitates users to reduce the time cost and effort by reducing errors and costs for institutes. Providing dependable tables to avoid mistakes related to instituting schedules is ensured by an automated repetitive manual procedure. Automated systems are increasingly developed based on organizations and their customers. Still, the setting's difficulty of automation systems increases to rise as the system architecture and applications must accomplish various requirements and specifications of ever-demanding project scenarios. The automation system is composed of an operating system, platforms, devices, machines, control system, and information technology. This architecture provides more productivity and optimized services. The main purpose of this paper is to apply an automation system to enhance both quality and productivity. This paper also covers an agile method of proving an automation system by Finite State Machine (FSM) and Attributed Graph Grammar (AGG) tool.
The 8th International Conference on Construction Engineering and Project Management
/
pp.201-206
/
2020
Diversification of project delivery methods (PDM) under ever-changing construction business environment has significantly changed the role of project participants. Active efforts to effectively sharing the roles and responsibilities have been observed in the project management offices (PMOs) among owner/operator organizations as well as engineering, procurement, construction and maintenance (EPCM) firms. In order for being effective in a holistic way throughout the project life-cycle, a PMO needs to have 'adequate management skills' as well as 'essential technical capabilities' in cooperating with many different participants. One of the well-known examples of the PMO's tool to support these skills and capabilities is the effective 'work packaging (WP)' that serves as a common basis integrating all relevant information in a structured manner. In an attempt to enhance the construction productivity, the concept of 'advanced work packing (AWP)' has been introduced by Construction Industry Institute (CII). The AWP enables productivity to be improved by early planning of construction packages in the design phase "with the end in mind". The purpose of this study is to identify and evaluate the 'variables' of advanced work packing (AWP) for life-cycle information integration. Firstly, an extended concept of advanced WP based on the CII AWP was defined in order to comprehend many different issues of business functions (e.g. cost, schedule, quality, etc.). A structured list of major components and variables of AWP were then identified and examined for practical viability with real-world examples. Strategic fits and managerial effectiveness were stressed throughout the analyses. Findings, implications and lessons learned are briefly discussed as well.
The 3th International Conference on Construction Engineering and Project Management
/
pp.1346-1351
/
2009
In this paper we propose a framework for an Object Relational IFC Server (OR-IFC Server). Enormous amounts of information are generated in each project. Today, many BIM systems are developed by various CAD software vendors. Industry Foundation Classes (IFC) developed by International Alliance for Interoperability (IAI) is an open standard data model for exchanging data between the various BIM tools. The IFC provides a foundation for exchanging and sharing of information directly between software applications and define a shared building project model. The IFC model server is a database management system that can keep track of transactions, modifications, and deletions. It plays a role as an information hub for storing and sharing information between various parties involved in construction projects. Users can communicate with each other via the internet and utilize functions implemented in the model server such as partial data import/export, file merge, version control, etc. IFC model servers using relational database systems have been developed. However, they suffered from slow performance and long transaction time due to a complex mapping process between the IFC structure and a relational-database structure because the IFC model schema is defined in the EXPRESS language which is object-favored language. In order to simplify the mapping process, we developed a set of rules to map the IFC model to an object-relational database (ORDB). Once the database has been configured, only those pieces of information that are required for a specific information-exchange scenario are extracted using the pre-defined information delivery manual (IDM). Therefore, file sizes will be reduced when exchanging data, meaning that files can now be effectively exchanged and shared. In this study, the framework of the IFC server using ORDB and IDM and the method to develop it will be examined.
The 3th International Conference on Construction Engineering and Project Management
/
pp.40-40
/
2009
Construction firms have long sought success in the global construction market through diversifying revenue sources and project portfolios. The volume of international contracts has contributed to firms' sustained growth by mitigating the impact of the domestic market's cyclical nature. In spite of the importance of international construction, the uncertainty and dynamic changes surrounding global construction pose serious threats to global contactors. Over the last decade, the international construction industry has changed drastically in many ways, particularly including financial resource diversity, competition rules for the selection of contractors, and the terms of delivery systems requiring more competent total service providers. This paper investigates the important changes for global contractors through various documentation analysis as well as in-depth interviews with industry experts. This paper then analyzes the common strategies and lessons obtained from the cases of leading global contractors that have sustained their growth in the competitive global construction during the last decade. In addition, the authors further analyzed the comparisons between those firms and Korean contractors to discern any difference in sustaining their growth in the competitive market. It was found that those leading firms were quite proactive and responsive to changing markets by diversifying their market revenues to stabilize their revenue structure and enhancing their competency through a wide range of 'business convergence'. In addition, they significantly increased their upstream/downstream functional capabilities; hence becoming more competent service providers, able to grow in these rapidly changing market conditions. Finally, this paper benchmarks the critical strategies that support growth, which in turn can provide a strategic guideline for expansion into the global construction market.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.