• 제목/요약/키워드: Project Delivery Method

검색결과 121건 처리시간 0.026초

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • 한국BIM학회 논문집
    • /
    • 제5권4호
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

확률 통계적 일정 시뮬레이선 - 민감도 분석을 이용한 최종 공사비 예측 (Predicting Construction Project Cost using Sensitivity Analysis in Stochastic Project Scheduling Simulation (SPSS))

  • 이동은;박찬식
    • 한국건설관리학회논문집
    • /
    • 제6권4호
    • /
    • pp.80-90
    • /
    • 2005
  • 프로젝트의 일정 네트워크는 선-후행 관계로 정의된 액티 비 티들로 구성되어 있다 액티비티를 완료하는데 소요되는 기간은 다양한 단축-지연 원인들에 의해 임의적이고, 확률-통계적 인 특성을 지닌다. 이러한 특성은 최종공사기간을 불확실하게하며, 재무리스크의 주요인이 된다. 본 연구는 선행 연구에서 개발된 확률-통계적 일정 시뮬레이션 시스템(Stochastic Project Scheduling Simulation)을 확장하여 액티비티 기간이 임의적으로 변동함에 따라 최종공사비가 어떻게 거동하는지 추정하는 방법론을 제시한다. 액티비티 기간을 임의의 변수로 취급하였고, 액티비티에 할당된 직접공사비에 공사기간의 단축-지연에 따른 간접비의 증감을 반영하여 최종공사비를 추정하였다. 액티비티 기간의 변동에 따라 의존 변수인 간접비가 변동하는 특성을 고려하여 시뮬레이션 출력값들(최종공사기간들)의 통계적 특성을 정량적으로 분석하여 최종공사비를 추정하였으며, 예비할 필요가 있는 지체보상금의 정도를 정량화하였다. 기존의 결정론적 기법이 불확실성을 내재한 체 지체 보상금의 비율을 주관적으로 적용해 왔던 반면, 본 연구에서 제시된 기법은 확실성과 신뢰도를 가지고 지체보상금의 비율을 책정할 수 있도록 하는 방법론을 제시하고 있다. 하나의 예제 프로젝트가 시뮬레이션을 이용한 정량분석기법을 예시하기위해 사용되었으며, 불확실성을 내포하고 있는 액티비티 기간들이 최종공사비에 미치는 영향을 검증하기위해 시뮬레이션 모의실험을 실행하였다 자동화된 민감도분석 기법을 이용하여 액티비티 기간을 정의하는 확률분포함수의 통계적 위치를 변화시킴에 따라 최종공사기간 및 최종공사비가 어떠한 거동을 나타내는지 확인하였다. 예제로 사용된 표본 프로젝트에 내재되어있는 재무리스크에 대응하기위해 지체보상금을 어느 정도까지 보유할 필요가 있는지를 정량적으로 분석하고, 의사결정을 위해 어떻게 적용될 수 있는지를 소개한다. 본 연구에 제시된 기법은 연구자들 및 현업 종사자들에게 최종공사비 예측에있어서 액티비티 기간 변화의 확률적 영향과 이론적 의미를 밝힘으로 프로젝트 자본계획과 관련된 위기관리에 진보된 예측방법론을 제공한다.

프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토 (BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service.)

  • 이창희;이정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF

공공발주자 의사결정에 미치는 가치공학(VE)의 영향력 분석 - 프로젝트 생애주기를 중심으로 - (The Influence Analysis of Value Engineering for the Public Empoyer's Decision Marking - Focused on the Project Life Cycle -)

  • 박종순;전재열
    • 한국건설관리학회논문집
    • /
    • 제16권2호
    • /
    • pp.12-20
    • /
    • 2015
  • 공공프로젝트 발주자들에게 VE의 중요성이 점증되고 있다. 본 연구에서는 VE 공공발주체계의 과학화, 시스템화를 통하여 공공발주자의 의사결정을 객관화시키고 발주체계 관련자들의 상호신뢰 회복을 위한 의사결정 지원체계의 구축을 위하여, 공공발주자에게 미치는 VE 프로젝트 발주체계의 영향력 분석에 대한 DB를 구축하는데 그 목적이 있다. 이에 국내의 VE 수행현황 분석을 통하여 수행체계의 문제점을 고찰하고, 도출된 문제점의 개선을 위하여 건설VE 수행사례를 통한 프로젝트 발주 시 고려하여야 할 VE 영향요소를 추출하여 설문결과에 대한 회귀분석 및 요인분석을 통하여 전체의 60%이상의 영향력을 가지는 15개의 영향요소를 도출한다. 도출된 영향요소에 대한 AHP분석을 통하여 프로젝트 생애주기 동안의 각 단계에 미치는 영향력을 분석하여 제시하였다.

국내 무인항공기의 경로계획 연구 (A Review of Routing Plan for Unmanned Aerial Vehicle : Focused on In-Country Researches)

  • 김진우;김진욱;채준재
    • 산업경영시스템학회지
    • /
    • 제38권4호
    • /
    • pp.212-225
    • /
    • 2015
  • UAV (Unmanned Aerial Vehicle), the pilotless plane or drone, draws researchers' attention at these days for its extended use to various area. The research was initiated for military use of the UAV, but the area of applicable field is extended to surveillance, communication, and even delivery for commercial use. As increasing the interest in UAV, the needs of research for operating the flying object which is not directly visible when it conducts a certain mission to remote place is obviously grown as much as developing high performance pilotless plane is required. One of the project supported by government is related to the use of UAV for logistics fields and controlling UAV to deliver the certain items to isolated or not-easy-to-access place is one of the important issues. At the initial stage of the project, the previous researches for controlling UAV need to be organized to understand current state of art in local researches. Thus, this study is one of the steps to develop the unmanned system for using in military or commercial. Specifically, we focused on reviewing the approaches of controlling UAV from origination to destination in previous in-country researches because the delivery involves the routing planning and the efficient and effective routing plan is critical to success to delivery mission using UAV. This routing plan includes the method to avoid the obstacles and reach the final destination without a crash. This research also present the classification and categorization of the papers and it could guide the researchers, who conduct researches and explore in comparable fields, to catch the current address of the research.

건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안 (A Process Model for Project Management of Design-Build System and Method for Constitution of Database)

  • 김의석;김창교;이경국;박상준;손보식;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.242-245
    • /
    • 2004
  • 공공 건설사업 발주 정책의 변화 및 대형화, 복잡화되고 있는 건축 프로젝트의 특성에 따라 향후 건설시장은 디자인 빌드 방식의 건설사업이 더욱 증가할 것으로 예상된다. 그러나 디자인 빌드의 증가와 더불어 운영관리 측면에서의 문제점이 나타나고 있다. 디자인 빌드 방식은 일괄사업자가 설계와 시공에 대한 책임을 전담하게 되므로 많은 리스크 요인이 존재하며, 기본설계에서 실시설계를 거쳐 시공단계에 이르는 업무 프로세스가 명확히 규명되어 있지 않아 사업의 진행에 따른 사업 수행자의 일관되고 체계적인 관리가 어려운 실정이다. 이에 본 연구에서는 디자인 빌드 프로젝트의 효과적인 수행을 위한 프로세스 모델을 개발하고, 관련지식의 체계적인 축적 및 활용을 위한 데이터베이스의 구축방안을 제시하고자 한다.

  • PDF

VE 적용에 의한 지하 골조공사 개선연구 (Case Study on the Improvement of Underground Building Works through the VE)

  • 홍재욱;김선국;이종국
    • 한국건설관리학회논문집
    • /
    • 제5권3호
    • /
    • pp.106-113
    • /
    • 2004
  • 건설산업의 고부가가치화를 위해서는 계획적인 원가절감에 의한 방법과 기능의 향상에 의한 방법 및 효율적인 추가 원가투입에 의하여 더 높은 기능 향상을 실현함으로써 부가가치를 높이는 방법을 추구하여야 할 것이다. 특히 건축공사에서 골조공사는 전체 공정 및 원가에 영향을 크게 미치는 주요 공정으로서 철저한 공사관리 계획과 관리가 요구되는 부분으로서 생산 활동 및 공사 방식 선정의 효과를 크게 볼 수 있는 항목이라 할 수 있다. 본 연구는 현재 도심지 공사에서 날로 증가하고 있는 지하공사의 비율을 감안하여 지하골조 공사의 성능개선에 초점을 두었다. 건축물의 지하골조공사에 있어 효과적인 공기 및 원가절감을 위하여 VE 기법을 검토하여 VE 프로세스와 분석차원을 모델링하고, 이를 현장에 적용, 사례연구를 통하여 그 타당성을 입증하였다. 따라서 본 연구는 건축물 지하골조공사의 VE 활용모델로서 기술대안 선정방식 수립의 기초적인 연구가 될 것으로 기대된다.

BTL 사업주체별 문제분석과 해결방안에 관한 연구 (A Study For An Improved BTL Project Delivery Method)

  • 김창덕;박혜신;이민재;유정호
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.53-63
    • /
    • 2006
  • 2005년부터 장부는 국민경제 선순환과 국민 삶의 질 향상이라는 목표 하에, 높은 수준의 공공서비스를 조기 또는 적기에 제공하기 위한 방책의 일환으로 BTL 사업의 시행을 추진하고 있다. 그러나 시행 초기부터 낮은 사업수익률, 사업제안 비용의 부담, 제도적 구조적 사업 진입 장벽으로 인한 지방 중소규모 건설업체의 불만 등 많은 문제점을 나타내고 있어 성공적인 BTL 사업에 걸림돌이 되고 있다. 이에 정부는 지방 중소업체의 참여율을 시공 비율 규정으로 정하고 사업성이 떨어지는 적정 이하 규모 공사를 BTL사업에서 제외하는 등의 대책을 세웠으나 근본적이 해결책으로서는 미흡한 것으로 조사되고 있다. 본 연구에서는 BTL 사업 추진 중 개선되어야 할 사항들에 대해서 문헌조사 및 전문가와의 심층 면담조사 등을 통해 조사 및 분석하였다. 본 연구 결과 가장 근본적인 개선사항으로 BTL 사업 수행 주체의 구성 방식이 시공자 중심으로 되어있는 DBFO(Design, Build, Finance, and Operate) 방식에 있음을 확인하고, 이러한 사업 수행 주체의 구성 방식을 재무적 투자자가 건설사업 관리자의 전문지식을 최대한 활용할 수 있도록 하는 FCDO(Finance, Construction Management, Development and Operate) 방식으로의 전환을 개선방안으로 제시한다.

공공 건설사업 CM at Risk 적용시 GMP 산출 프로세스 (GMP Calculation Process in CM at Risk for Public Construction Project)

  • 김건성;김정훈;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.48-49
    • /
    • 2020
  • Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.

  • PDF

정보활용기술 발전에 따른 효과적 사이버 교육을 위한 설계 및 구현의 차이에 대한 연구 (Research on Effects of Three Different Designs and Implementations on Cyber Education)

  • 하태현;강정화
    • 컴퓨터교육학회논문지
    • /
    • 제6권4호
    • /
    • pp.71-83
    • /
    • 2003
  • 이 연구는 다양한 개발 방법을 통해 효과적인 사이버 교육 프로그램을 찾는 것을 주목적으로 한다. '다양한 방법'의 접근은 어떤 전달 기술 (Delivery Technology)에 의해서 사이버 교육이 이루어 지고 있는가에 따라서 분류되었다. 제 1 세대에서 사용한 기술로써는 문자, Flash 그리고 애니메이션 이며, 제 2 세대와 제 3 세대에서는 동영상 비디오와 오디오 등 멀티미디어 기술을 사용하였으나 다만 비디오 클립에서 강의 되는 학습전달방법이 다르다. 평가결과 3 세대 기술을 이용한 방법이 가장 효과적인 학습 전달 기술로 평가되고 있다. 그러나 여기에서 사용한 멀티미디어를 이용한 학습 전달 방법은 개발에 드는 많은 비용 뿐만이 아니라 학습자에게도 네트워크의 전송속도가 빠른 최신의 컴퓨터를 필요로 한다. 그러므로 사이버 교육을 위한 멀티미디어를 이용한 프로그램 개발과 아울러 전송 속도 등과 같은 기술적인 개발도 이루어져야 한다고 생각한다.

  • PDF