• 제목/요약/키워드: Project Delay

검색결과 282건 처리시간 0.029초

시스템 다이나믹스를 이용한 부에노스아이레스 수도사업 양여계약사례의 고찰 (Reviewing Contract of the Buenosaires Water Concession Case with System Dynamics)

  • 이상은;차동훈;박희경
    • 상하수도학회지
    • /
    • 제20권1호
    • /
    • pp.104-114
    • /
    • 2006
  • Recently, the PPP (Public-Private-Participate) program on water and wastewater services in Korea has been under an active debate. However, the controversy has reached the limits of getting more valuable implications from past foreign experience beyond conceptual and/or qualitative case studies. This paper analyze scientifically and quantitatively the Buenos Aires Water Concession Project focused on propriety of the contract using system dynamics modeling. The results show that Buenos Aires's Project has several problems in the contract phase even though Argentina government spent much time to design it. Analysis results suggest that estimation of K factor considering delay effect and future uncertainty, reduction of the first fixed terms of contract, etc., are needed for a proper contract.

The Status of the KRR-l&2 Decommissioning Activities

  • Chung, Un-Soo;Park, Seung-Kook;Hong, Sang-Bum;Park, Jin-Ho
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2004년도 Proceedings of the 4th Korea-China Joint Workshop on Nuclear Waste Management
    • /
    • pp.96-105
    • /
    • 2004
  • The decommissioning project of the KRR 1 & 2 was started in January 1997. The actual decommissioning activity was started at the RI production facility and was finished at the end of 2002. The dismantling works of all components including the reactor structure of the KRR-2 was started in January, 2003 and will be carried out for 2 years till the end of 2004. The project schedule is estimated to delay for 4∼5 months beyond the original plan because of delaying on the cutting of thermal column nose and removal of the graphite bricks, but it may be caught up during the removal working of concrete from biological shielding structure. This paper summarizes the general status of the KRR 1 & 2 and decommissioning activities.

  • PDF

지하주차장 슬래브 균열저감을 위한 수축저감 콘크리트 현장적용 사례 (Application of shrinkage-reduced concrete to mitigate cracks of slab in parking garages)

  • 서종해;이정호;이규식;전병갑;김준삼;이회근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.197-200
    • /
    • 2012
  • Concrete has cracks from shrinkage that necessarily result from in hardening process. Shrinkage-reduced concrete developed for crack reduction was utilized at a sample construction project. As a result, it is confirmed that crack initation ratio was remarkably reduced when compared to the case of normal concrete utilization. Additional sample project is supposed to use delay joints as well as srinkage-reduced concrete. Subsequently, the result will be reported. The greatest factor which affects in drying shrinkage is unit quantity of water. However, there are a lot off difficulties in field supervision because proper measuring means is not presented in present standard. Therfore, problems depending on ready-mixed concrete concrete companies should be improved by preparing the related standard assoon as possible.

  • PDF

불확실성 및 가변성 환경의 신뢰성 향상을 위한 체크리스트 설계 (Design of Checklist for Improvement of Reliability of Uncertainty and Variability Environment)

  • 이은서
    • 정보처리학회논문지:소프트웨어 및 데이터공학
    • /
    • 제3권10호
    • /
    • pp.389-396
    • /
    • 2014
  • 프로젝트 수행은 많은 결함을 내포하고 있다. 특히 유사한 분야의 프로젝트 수행 경험이 없다면 결함은 전체 시스템에 많은 영향을 주게 된다. 따라서 이와 같은 결함은 프로젝트의 성공 여부를 판단할 수 있는 중요한 요소가 된다. 결국 효율적인 위험관리는 문제에 쉽게 대처할 수 있게 해주며, 예상하지 못한 품질, 예산초과 및 일정 지연이 되지 않도록 해준다. 본 연구에서는 소프트웨어 개발 시, 프로세스의 신뢰성 향상을 위하여 체크포인트를 제시하고 이를 활용하여 전체 시스템의 신뢰성을 향상하고자 한다.

교통대응 신호제어 시스템의 효율성 평가 (The Assessment of TRACS(Traffic Adaptive Control System))

  • 이영인
    • 대한교통학회지
    • /
    • 제13권1호
    • /
    • pp.5-33
    • /
    • 1995
  • This paper addresses the outlines of the traffic signal timing principles engaged in TRACS and the results of field test. Research team, encompassing research institute, university, and electronic company, conducted the three-year project for developing the new system, named TRACS(Traffic Adaptive Control System). The project was successfully completed in 1994. TRACS aims at accomplishing the objectives of better traffic adaptability and more reliable travel time prediction. TRACS operates in real-time adjusting signal timings throughout the system in response to variations in traffic demand and system capacity. The purpose of TRACS is to control traffic on an area basis rather than on an isolated intersection basis. An other purpose of TRACS is to provide real-time road traffic information such as volume, speed, delay , travel time, and so on. The performance of the first version of TRACS was compared to the conventional TOD control through field test. The test result was promi ing in that TRACS consistantly outperformed the conventional control method. The change of signaltiming reacted timely to the variation of traffic demand. Extensive operational test of TRACS will be conducted this year, and some functions will be enhanced.

  • PDF

효과적인 기술검토회를 위한 동료검토회 프로세스 (The Peer-Review Process for an effective Technical Review)

  • 최요철;조연옥;이재천
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1333-1339
    • /
    • 2008
  • Typically, we regularly have carried out a technical review to know a progress status and outcomes of a project to the appropriate technical plans. But during the technical review executed at a planned point of time, lots of problems; reports of an ambiguous progress status and outcomes, a discordance between opinions, and an hour's delay, have been occurred. To solve those problems an early stage, an informal reviews are executed before the formal technical review. One of the informal review is the Peer-Review. This paper is a matter of the effective and efficient Reer-Review process utilized in performing the national research and development project. Additionally, it was presented a general misunderstanding and improvement plan about the Peer-Review.

  • PDF

프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토 (BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service.)

  • 이창희;이정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF

설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 - (A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage -)

  • 박원호;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

CONSTRUCTABILITY REVIEWS: A STRATEGIC PROCESS IN DESIGN DEVELOPMENT

  • Patrick T.I. Lam;Franky W.H. Wong
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.1-8
    • /
    • 2007
  • Construction designs are often produced with insufficient considerations on the constructability aspects. Poor constructability has resulted in delay, cost increase, disputes, safety hazards and inconvenience to the public. Increasingly, there has been a call for more systematic input of construction knowledge in the planning and design processes of modern day's infrastructure development. In some countries, notably the US, the practice of constructability reviews is on the rise, with concomitant benefits. It is advocated that construction plans and designs be subject to constructability reviews as early as possible. It should be made part of the project management strategy driven by the client. This paper outlines the constructability review process and benefits, whilst drawing lessons from a number of case studies.

  • PDF

SIMPLIFIED SIMULATION APPROACH TO MANAGING SCHEDULE-OVERRUN RISKS IN CONSTRUCTION OPERATIONS

  • Wah-Ho CHAN;Ming LU
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.929-934
    • /
    • 2005
  • The complex and dynamic job nature and the ever-changing working environment of construction projects inevitably present uncertainties to construction operations. Identification, evaluation and control of uncertainties constitute main elements of risk management and critical tasks of project management in construction. This paper is focused on application of a simplified discrete-event simulation approach in management of schedule-overrun risks, each being the combination of the occurrence probability of an uncertain interruptive factor and its potential consequence in terms of time delay. A case study observed from a concreting operation in Hong Kong is converted into a simulation model and analyzed with an in-house-developed simulation package for demonstrating how the proposed approach can be implemented to manage multiple schedule-overrun risks on construction projects.

  • PDF