• Title/Summary/Keyword: Project Cost Performance

Search Result 424, Processing Time 0.025 seconds

A Study on the Design Value Analysis Methodology for Bridge Structure Using Reliability Analysis (신뢰성 해석을 이용한 교량구조물의 설계VA기법 연구)

  • Kim, Seong-Il;Lee, Kwang-Mo;Choi, Suk-Won;Jung, Jun-Hwa;Kim, Seong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.114-125
    • /
    • 2009
  • In this study, a design value analysis technique that considered stochastic LCC and stochastic performance evaluation was proposed, and by introducing the concept of reliability analysis, a decision making that secured reliability was supported. The results of this study, which was carried out according to the above objectives and methods, are summarized as follows: 1) The design value analysis procedures and value state function, improved in order to carry out a reliable analysis when evaluating alternate proposals that were extracted after the function definition was complete, were formalized, and in order to secure consistency and efficiency for value evaluation procedures, an evaluation index scheme was proposed; 2) Database collection and analysis were done for a bridge's LCC analysis. As for the collection scope of data, literature of previous research done on a bridge's LCC analysis was used as the basis for analysis, and for securing reliability regarding analysis results and dealing with uncertainty of collected data, the MCS technique was applied; 3) Weights and evaluation ranks for performance evaluation of each of the alternate proposals, as well as LCC analysis model, analysis period, discount rate, user expense, safety inspection and safety diagnosis expense conditions for LCC analysis were proposed. Lastly, a feasibility study was done and conclusion was made about "OO grand bridge and connecting road construction work execution design" project centered on value analysis execution case.

Does Process Quality of Inpatient Care Serve as a Guide to Reduce Potentially Preventable Readmission (PPR)? (의료서비스의 과정적 질과 잠재적으로 예방 가능한 재입원율과의 관계)

  • Choi, Jae-Young
    • Korea Journal of Hospital Management
    • /
    • v.23 no.1
    • /
    • pp.87-106
    • /
    • 2018
  • Objective: The objective of this study is to examine the association between process quality of inpatient care and risk-adjusted, thirty-day potentially preventable hospital readmission (PPR) rates. Data Sources/Study Setting: This was an observational cross-sectional study of nonfederal acute-care hospitals located in two states California and Florida, discharging Medicare patients with a principal discharge diagnosis of heart failure, acute myocardial infarction, or pneumonia January through December 31, 2007. Data were obtained from the Healthcare Cost and Utilization Project State Inpatient Database of the Agency for Healthcare Research and Quality, Centers for Medicare and Medicaid Services Hospital Compare database, and the American Hospital Association Annual Survey of Hospitals. Study Design: The dependent variable of this study is condition-specific, risk-adjusted, thirty-day potentially preventable hospital readmission (PPR). 3M's PPR software was utilized to determine whether a readmission was potentially preventable. The independent variable of this study is hospital performance for process quality of inpatient care, measured by hospital adherence to recommended processes of care. We used multivariate hierarchical logistic models, clustered by hospitals, to examine the relationship between condition-specific, risk-adjusted, thirty-day PPR rates and process quality of inpatient care, after taking clinical and socio-demographic characteristics of patients and structural and operational characteristics of hospitals into account. Findings: Better performance on the process quality metrics was associated with better patient outcome (i.e., low thirty-day PPR rates) in pneumonia, but not generally in two cardiovascular conditions (i.e., heart failure and acute myocardial infarction). Practical Implication: Adherence to the process quality metrics currently in use by CMS is associated with risk-adjusted, thirty-day PPR rates for patients with pneumonia, but not with cardiovascular conditions. More evidence-based process quality metrics closely linked to 30-day PPR rates, particularly for cardiovascular conditions, need to be developed to serve as a guideline to reduce potentially preventable readmissions.

Performance Analysis of MBMS and Wi-Fi Priority Policy in Heterogeneous Networks having a dispersed Single-cell MBMS (분산된 단일 셀 MBMS을 지원하는 이종 네트워크 환경에서 MBMS와 와이파이 사용자 우선 정책에 대한 성능 분석)

  • Jeong, Un Ho;Lee, Jung Moon;Kim, Gi Taek;Nam, Boo Hee;Kim, Dong Hoi
    • Journal of Broadcast Engineering
    • /
    • v.18 no.2
    • /
    • pp.215-224
    • /
    • 2013
  • With the rising popularity of smart-phones, the supply of Internet protocol television is largely increased and it causes the wireless communication network load to be increased. To overcome such an overloading problem, 3GPP is now working on the standardization of MBMS since LTE Release 6 specification. MBMS has good performance in bandwidth efficiency by sharing the same bandwidth with the mulitple MBMS users having the same content. According to the proposed algorithm, in heterogeneous networks having a dispersed Single-cell MBMS where 3GPP network and Wi-Fi network are mixed, if the number of MBMS users, who are belonging to cells supporting a dispersed Single-cell MBMS, is more than a specified threshold, the MBMS priority policy is operated. Otherwise, the Wi-Fi priority policy is executed. As the simulation results show both the increase of total available bandwidth ratio and the decrease of network usage cost, it is confirmed that the proposed scheme allows the network efficiency to be maximized.

Development of an Appropriate Deposit-Estimation System for Restoration of Land-Use-Changed Forest Lands Using the Delphi Technique (델파이 기법을 활용한 적정 산지복구비 산출체계의 개발)

  • Koo, Kiwoon;Kweon, Hyeongkeun;Lee, Sang In;Kwon, Semyung;Seo, Jung Il
    • Journal of Korean Society of Forest Science
    • /
    • v.110 no.4
    • /
    • pp.630-647
    • /
    • 2021
  • We determined the current problem of the restoration deposit-estimation system, stipulated by the Mountainous Districts Management Act, using the Delphi technique. Consequently, we proposed a standard model for forest land restoration to derive a reasonable deposit-estimation system. With the result of the Delphi survey, the inappropriateness of land-use type and slope gradient classifications was shown; the insufficiency of standard works was a significant problem in the current system. A way to solve these problems was devised, to reorganize the current land-use type into the subject of the site. The specific subjects included the following: (i) to permit or report forest land-use change and temporary use of forest land, (ii) to report temporary use of forest land, (iii) to permit stone collection or sale for mineral mining, and (iv) to allow sediment collection. The current slope gradient subdivision into (a) θ<10°, (b) 10°≦θ<15°, (c) 15°≦θ<20°, (d) 20°≦θ<25°, (e) 25°≦θ<30°, and (f) θ≧30° and the reorganization of 17 standard works into 22 standard works were deemed as solutions, along with seven additional works. We developed 24 standard models for the forest land restoration project based on the aforementioned results. The deposits estimated by these models ranged from 34,185,000 (Korean) won to 607,403,000 won. If additional works, premiums, discounts, and supervision fees are added to the models, the deposit increases to an estimated 668,143,000 won subject to permission for stone collection or sale and mineral mining. Experts agree on the distribution of the restoration deposits estimated by these models at a high level in the Delphi survey. Our findings are expected to contribute to securing the appropriateness of the restoration cost deposited for the smooth performance of the vicariously executed restoration project.

Development of an Automated Gangform Climbing System for Apartment Housing Construction - Structural Stability and Tower Crane Lifting Load Analysis - (공동주택 전용 갱폼 인양 자동화 기술의 개발 - 구조적 안정성 및 타워크레인 양중부하 분석 -)

  • Lee, Jeong-Ho;Yang, Sang-Hoon;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.48-59
    • /
    • 2012
  • Gangform, compared to the traditional forms, is a systemized form which can reduce construction duration and cost by the advantage of using it repeatedly. However, transportation and climbing process of the Gangform is highly dependant on the performance of tower crane. Gangform climbing process takes one day out of six to seven days of a structural work cycle. Tower cranes can not be used in other lifting works when they lift the Gangform during the structural work cycle, causing the delay in the construction project. Numerous efforts and researches have been done in domestic and international industry to solve such limitations of Gangform climbing process. Especially, "A Study on the Development of Automatic Gangform Climbing System for Apartment Housing Construction"has suggested a conceptual model which can climb the Gangform system without a tower crane. In this paper, the technical and economical feasibilities of previously proposed Automatic Gangform climbing system are examined by evaluating its structural stability and lifting load reduction effect.

Development of Metric-Based Two-Tier Work Force Strategy (성과극대화를 위한 기능인력의 육성 및 활용전략)

  • Chang Soon-Woong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-81
    • /
    • 2003
  • The construction industry has been experiencing a major challenge in its work force, 'the shortage of skilled craft workers.' This problem has been caused by several factors such as the poor image of the construction industry, lack of training and education, unclear career path, declining wages, and changing work force demographics. A 'step-change' approach called the 'Two-Tier Work Force Strategy' has been proposed by the Center for Construction Industry Studies (CCIS) to deal with the work force related issues in a radical way. It is composed of two separate strategies, Tier I and II. The Tier I strategy uses less skilled and task trained craft workers, and has a larger administrative site management team than the Tier II strategy. The Tier II strategy utilizes fewer, better-educated, and higher skilled workers who perform some lower-management functions in addition to craft functions. They are paid more, but produce more through higher skills, stay on the job longer through multi-skilling, and deliver improved project performance in safety, quality, schedule, and cost The Two-Tier Work Force Strategy has the potential to resolve the current work force problems and foster a better work force environment in the future.

  • PDF

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

Trend Analysis of Labor Input Ratios by Work Types in Apartment Housing Constructions (공동주택 건설공사에서 공종별 실투입 노무비율의 추이분석)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.97-104
    • /
    • 2015
  • Apartment Housing 25 in the field of construction since 2000 collected by types of labor: reinforced concrete, plaster, internal, equipment, electrics communication, the other work. And the performance of labor input was collected in the amount of construction work performed on a monthly basis. After changing the construction period in the standardization work that is 100% of the construction period, the amount was converted into labor ratio by type. Analysis of the input flow rate and the amount of labor conclusions were as follows: (1) The size of the labor rate is reinforced concrete work (38.25%), plastering work (5.10%), internal work (5.67%), equipment work (9.10%), electrics communication (8.76%), the other works (33.12%) and the size of labor rate is the largest work in reinforced concrete work. (2) The peak of labor input ratio was from 52.5% month to 62.5% month. This was when the labor rate of 3.6%. (3) The period month of the largest labor ratio% is 35% month by reinforced concrete construction, and this time it was 2.12% per month labor rate, and reinforced concrete construction is finishing from 65% month to 80% month. This showed the greatest congestion of mutual interference between each works is being continue. The results of this study are the greatest congestion in apartment housing construction has informed the high period(%months), which is essential to a successful project.

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.

The Performance of the National Authorization System of Private Qualification (강건설계방법을 활용한 창의적 문제해결 실습과정)

  • Kim, Tai-Oun
    • Journal of Engineering Education Research
    • /
    • v.11 no.1
    • /
    • pp.64-75
    • /
    • 2008
  • A new product development and product realization process (PRP) is a circulating and feedback process by generating ideas through creative problem solving process. The early stages of PRP correspond to conceptual design and product development, in which a large portion of product life cycle cost can be saved. The optimal design method for this stage is a robust design suggested by Taguchi. Quality must be 'engineered in' since it can not be 'inspected out.' A robust design is an engineering methodology to improve the quality of a product by minimizing the efforts of variations without eliminating the causes. The objective of this study is to propose a scheme and a case study of robust design for exploring design parameters, and introduce a creative problem solving process. Major research subjects include a creative problem solving process, robust design procedure and their implementation. For the experiment of Taguchi method, a toy catapult is adopted. For the creativity development, a short project is assigned to devise a similar tool with the toy catapult. A reference model is suggested to compare and evaluate their ideas.