• Title/Summary/Keyword: Project Cost Performance

Search Result 424, Processing Time 0.031 seconds

Structural health monitoring of a cable-stayed bridge using smart sensor technology: deployment and evaluation

  • Jang, Shinae;Jo, Hongki;Cho, Soojin;Mechitov, Kirill;Rice, Jennifer A.;Sim, Sung-Han;Jung, Hyung-Jo;Yun, Chung-Bangm;Spencer, Billie F. Jr.;Agha, Gul
    • Smart Structures and Systems
    • /
    • v.6 no.5_6
    • /
    • pp.439-459
    • /
    • 2010
  • Structural health monitoring (SHM) of civil infrastructure using wireless smart sensor networks (WSSNs) has received significant public attention in recent years. The benefits of WSSNs are that they are low-cost, easy to install, and provide effective data management via on-board computation. This paper reports on the deployment and evaluation of a state-of-the-art WSSN on the new Jindo Bridge, a cable-stayed bridge in South Korea with a 344-m main span and two 70-m side spans. The central components of the WSSN deployment are the Imote2 smart sensor platforms, a custom-designed multimetric sensor boards, base stations, and software provided by the Illinois Structural Health Monitoring Project (ISHMP) Services Toolsuite. In total, 70 sensor nodes and two base stations have been deployed to monitor the bridge using an autonomous SHM application with excessive wind and vibration triggering the system to initiate monitoring. Additionally, the performance of the system is evaluated in terms of hardware durability, software stability, power consumption and energy harvesting capabilities. The Jindo Bridge SHM system constitutes the largest deployment of wireless smart sensors for civil infrastructure monitoring to date. This deployment demonstrates the strong potential of WSSNs for monitoring of large scale civil infrastructure.

A Study on Development of Electronic Performance Support System Prototype for Improving the Efficiency of Quality Inspection of Temporary Work (가설공사 품질점검 업무효율 향상을 위한 전자작업지원시스템(EPSS) 프로토타입 개발에 관한 연구)

  • Yoon, Soo-Ho;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.13-27
    • /
    • 2019
  • While temporary construction work applies to a temporary facility, it has a high use frequency during the construction period accounting for around 10% of the construction cost, it requires systematic management. However, construction inspection information of temporary construction work often has no special specification in the design documents and specification items, with the items on various standards also being formidable. Because of this, related inspection are likely to be performed inefficiently with a high probability for occurrence of human errors when quality inspection is conducted for the temporary construction work. In the present study, therefore, apply to the electronic operation support system capable of supporting implementation of inspection of providing related information for the contemporary construction work. To achieve this, a prototype is developed by using IDEF0 to identify information flow by process and organizing EPSS-based quality inspection Task. And then, efficiency of the quality inspection and information accessibility for temporary construction work are to be improved by verification method of Sample Project.

Development of ITB Risk Mgt. Model Based on AI in Bidding Phase for Oversea EPC Projects (플랜트 EPC 해외 사업을 위한 입찰단계 시 AI 기반의 ITB Risk 관리 모델 개발)

  • Lee, Don-Hee;Yoon, Gun-Ho;Kim, Jeong-Joon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.4
    • /
    • pp.151-160
    • /
    • 2019
  • EPC companies to continue operating overseas, it is increasingly becoming apparent that risk is no longer something to be avoided but a subject to be managed. During the bidding stage, the requirements, specifications and project line items within the bid package must be studied in details to analyze the various risk factors in order to avoid cost overruns. However, reviewing vast quantities of bidding documents is time consuming and labor intensive and is not an easy task and this is where automated information technology can help. For this study, I have constructed an ITB analysis model based on Watson AI that can analyze and apply vast amount of documents more effectively in a short time. Configuration of the Watson Explorer AI architecture for AI-based ITB risk management model research, the selection of learning procedures and analysis subjects, and the performance evaluation criteria were defined, and a test bed was constructed to conduct a pilot research. Consequently, I verified the effectiveness of the analytical time reduction and the quality of its results and VOC operations by professionals.

Spatiotemporal chronographical modeling of procurement and material flow for building projects

  • Francis, Adel;Miresco, Edmond;Le Meur, Erwan
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.119-139
    • /
    • 2019
  • Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. Better on-site management allows for substantial productivity improvements and cost savings. The procurement system should be able to manage a wider variety of materials and products of the required quality in order to have less stock, in less time, using less space, with less investment and avoiding multiple storage stations. The objective of this paper is to demonstrate the advantages of using the Chronographic modeling, by combining spatiotemporal technical scheduling with the 4D simulations, the Last Planner System and the Takt-time when modeling the construction of building projects. This paper work toward the aforementioned goal by examining the impact that material flow has on site occupancy. The proposed spatiotemporal model promotes efficient site use, defines optimal site-occupancy and workforce-rotation rates, minimizes intermediate stocks, and ensures a suitable procurement process. This paper study the material flow on the site and consider horizontal and vertical paths, traffic flows and appropriate means of transportation to ensure fluidity and safety. This paper contributes to the existing body of knowledge by linking execution and supply to the spatial and temporal aspects. The methodology compare the performance and procurement processes for the proposed Chronographic model with the Gantt-Precedence diagram. Two examples are presented to demonstrate the benefits of the proposed model and to validate the related concepts. This validation is designed to test the model's graphical ability to simulate construction and procurement.

A Method of Calculating Baseline Productivity by Reflecting Construction Project Data Characteristics (건설 프로젝트 데이터 특성을 반영한 기준생산성 산정 방법)

  • Kim Eunseo;Kim Junyoung;Joo Seonu;Ahn Changbum;Park Moonseo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.3-11
    • /
    • 2023
  • This research examines the need for a quantitative and objective method of calculating baseline productivity in the construction industry, which is known for its high volatility in performance and productivity. The existing literature's baseline productivity calculation methods rely heavily on subjective criteria, limiting their effectiveness. Additionally, data collection methods such as the "Five-minute Rating" are costly and time-consuming, making it challenging to collect detailed data at construction sites. To address these issues, this study proposes an objective baseline calculation method using unimpacted productivity BP, a work check sheet to systematically record detailed data, and a data collection and utilization process that minimizes cost and time requirements. This paper also suggests using unimpacted productivity BP and comparative analysis to address the objectivity and reliability issues of existing baseline productivity calculation methods.

Hospice Medicine and Nursing Ethics (호스피스의료와 간호윤리)

  • Moon, Seong-Jea
    • The Korean Society of Law and Medicine
    • /
    • v.9 no.1
    • /
    • pp.385-411
    • /
    • 2008
  • The goal of medicine is to contribute to promoting national health by preventing diseases and providing treatment. The scope of modern medicine isn't merely confined to disease testing, treatment and prevention in accordance to that, and making experiments by using the human body is widespread. The advance in modern medicine has made a great contribution to valuing human dignity and actualizing a manly life, but there is a problem that has still nagged modern medicine: treatment and healing for terminal patients including cancer patients. In advanced countries, pain care and hospice medicine are already universal. Offering a helping hand for terminal patients to lead a less painful and more manly life from diverse angles instead of merely focusing on treatment is called the very hospice medicine. That is a comprehensive package of medical services to take care of death-facing terminal patients and their families with affection. That is providing physical, mental and social support for the patients to pass away in peace after living a dignified and decent life, and that is comforting their bereaved families. The National Hospice Organization of the United States provides terminal patients and their families with sustained hospital care and home care in a move to lend assistance to them. In our country, however, tertiary medical institutions simply provide medical care for terminal patients to extend their lives, and there are few institutional efforts to help them. Hospice medicine is offered mostly in our country by non- professionals including doctors, nurses, social workers, pastors or physical therapists. Terminal patients' needs cannot be satisfied in the same manner as those of other patients, and it's needed to take a different approach to their treatment as well. Nevertheless, the focus of medical care is still placed on treatment only, which should be taken seriously. Ministry for Health, Welfare & Family Affairs and Health Insurance Review & Assessment Service held a public hearing on May 21, 2008, on the cost of hospice care, quality control and demonstration project to gather extensive opinions from the academic community, experts and consumer groups to draw up plans about manpower supply, facilities and demonstration project, but the institutions are not going to work on hospice education, securement of facilities and relevant legislation. In 2002, Ministry for Health, Welfare & Family Affairs made an official announcement to introduce a hospice nurse system to nurture nurse specialists in this area. That ministry legislated for the qualifications of advanced nurse practitioner and a hospice nurse system(Article 24 and 2 in Enforcement Regulations for the Medical Law), but few specific plans are under way to carry out the regulations. It's well known that the medical law defines a nurse as a professional health care worker, and there is a move to draw a line between the responsibilities of doctors and those of nurses in association with medical errors. Specifically, the roles of professional hospice are increasingly expected to be accentuated in conjunction with treatment for terminal patients, and it seems that delving into possible problems with the job performance of nurses and coming up with workable countermeasures are what scholars of conscience should do in an effort to contribute to the development of medicine and the realization of a dignified and manly life.

  • PDF

Active VM Consolidation for Cloud Data Centers under Energy Saving Approach

  • Saxena, Shailesh;Khan, Mohammad Zubair;Singh, Ravendra;Noorwali, Abdulfattah
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.11
    • /
    • pp.345-353
    • /
    • 2021
  • Cloud computing represent a new era of computing that's forms through the combination of service-oriented architecture (SOA), Internet and grid computing with virtualization technology. Virtualization is a concept through which every cloud is enable to provide on-demand services to the users. Most IT service provider adopt cloud based services for their users to meet the high demand of computation, as it is most flexible, reliable and scalable technology. Energy based performance tradeoff become the main challenge in cloud computing, as its acceptance and popularity increases day by day. Cloud data centers required a huge amount of power supply to the virtualization of servers for maintain on- demand high computing. High power demand increase the energy cost of service providers as well as it also harm the environment through the emission of CO2. An optimization of cloud computing based on energy-performance tradeoff is required to obtain the balance between energy saving and QoS (quality of services) policies of cloud. A study about power usage of resources in cloud data centers based on workload assign to them, says that an idle server consume near about 50% of its peak utilization power [1]. Therefore, more number of underutilized servers in any cloud data center is responsible to reduce the energy performance tradeoff. To handle this issue, a lots of research proposed as energy efficient algorithms for minimize the consumption of energy and also maintain the SLA (service level agreement) at a satisfactory level. VM (virtual machine) consolidation is one such technique that ensured about the balance of energy based SLA. In the scope of this paper, we explore reinforcement with fuzzy logic (RFL) for VM consolidation to achieve energy based SLA. In this proposed RFL based active VM consolidation, the primary objective is to manage physical server (PS) nodes in order to avoid over-utilized and under-utilized, and to optimize the placement of VMs. A dynamic threshold (based on RFL) is proposed for over-utilized PS detection. For over-utilized PS, a VM selection policy based on fuzzy logic is proposed, which selects VM for migration to maintain the balance of SLA. Additionally, it incorporate VM placement policy through categorization of non-overutilized servers as- balanced, under-utilized and critical. CloudSim toolkit is used to simulate the proposed work on real-world work load traces of CoMon Project define by PlanetLab. Simulation results shows that the proposed policies is most energy efficient compared to others in terms of reduction in both electricity usage and SLA violation.

A Study on the Carbon Market and Carbon Funds Development. (탄소시장과 탄소펀드 개발에 관한 연구)

  • Son, Woo-Sik;Park, Myong-Sop
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.46
    • /
    • pp.265-313
    • /
    • 2010
  • Kyoto Protocol is an international convention on concrete performance program for UNFCCC(United Nations Framework Convention on Climate Change), which regulate and prevent to global warming and officially came into effect on February 16, 2005. Kyoto flexible mechanisms, the agreed environmental system in March 1997 in the Third Conference of Parties in UNFCCC General Assembly, Emission Trading System(ETS), Clean Development Mechanism(CDM) and Joint Implementation(JI), are key policies related to environment. In advanced countries, greenhouse gas emissions should be reduced average 5.2% level compared to 1990 in total emissions during 2008-2012. World leading carbon market finished the trial on the EU ETS I greenhouse gas emissions trading system, EU ETS II is operated regularly after 2008. World Bank leads to make 'Prototype Carbon Fund(PCF)' in April 2004, which is the world first carbon fund and a representative public carbon fund type, World Bank operate various funds including present PCF. Thus, I would like to propose as follows in relation to this study: First, in the validity analysis of carbon funds, it would be needed to analyze the Emission Reduction Cost Efficiency(ERCE) of carbon. The ERCE is a break-even value which brings the Net Present Value(NPV) to zero. NPV approach is used among projects and it enables potential projects to be compared and evaluated the ERCE on the basis of the net present value of net future cash flows. Therefore, according to results of analysis, carbon funds should be developed and invested. Second, it would be necessary to allow of issuing bonds together with carbon funds, carbon finance etc. Third, carbon funds, it would be reasonable to have a relatively enough maturity in project and as a financial derivatives in the international financial markets, it is needed various types of transactions. Fourth, it would be needed to standardize the carbon emissions trading for more efficiently. Fifth, it would be necessary to establish and invest in various kinds of domestic and overseas global carbon funds, including governments, privates, governments and privates sectors. And it is also needed to establish the medium and long term plans for carbon funds. Sixth, it would be needed to foster the advanced trade mechanisms for carbon funds in the most effective ways. Finally, carbon funds should be used in harmony with international societies to reduce global warming as the social responsible investing funds and it should be contribute to sustainable development. In addition, it would seem that carbon funds should be studied on establishing the contributable standard of sustainable development in the future assignment.

  • PDF

Development of an Economic Material Selection Model for G-SEED Certification (녹색건축(G-SEED) 인증을 위한 경제적 자재선정 모델 개발)

  • Jeon, Byung-Ju;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.6
    • /
    • pp.613-622
    • /
    • 2020
  • The South Korean government plans for a 37 % reduction in CO2 emissions against business as usual by 2030. Subsequently, the Ministry of Land, Infrastructure and Transport declared a 26.9 % reduction target in greenhouse gas emissions from buildings by 2020 and established the Green Standard for Energy and Environmental Design (G-SEED) to help improve the environmental performance of buildings. Construction companies often work with consulting firms to prepare for G-SEED certification. In the process, owing to inefficient data sharing and work connections, it is difficult to achieve economic efficiency and obtain certification. The objective of this study was to develop an economic model to assist contractors in achieving the required G-SEED scores for materials and resources. To do this, we automated the process for material comparison and selection on the basis of an analysis of actual consulting data, and developed a model that selects material alternatives that can meet the required scores at a minimum cost. Information on materials is input by applying a genetic algorithm to the optimization of alternatives. When the model was applied to actual data, the construction cost could be lowered by 79.3 % compared with existing methods. The economical material selection model is expected to not only reduce construction costs for owners desiring G-SEED certification but also shorten the project design time.

The Effective Approach for Non-Point Source Management (효과적인 비점오염원관리를 위한 접근 방향)

  • Park, Jae Hong;Ryu, Jichul;Shin, Dong Seok;Lee, Jae Kwan
    • Journal of Wetlands Research
    • /
    • v.21 no.2
    • /
    • pp.140-146
    • /
    • 2019
  • In order to manage non-point sources, the paradigm of the system should be changed so that the management of non-point sources will be systematized from the beginning of the use and development of the land. It is necessary to change the method of national subsidy support and poeration plan for the non-point source management area. In order to increase the effectiveness of the non-point source reduction project, it is necessary to provide a minimum support ratio and to provide additional support according to the performance of the local government. A new system should be established to evaluate the performance of non-point source reduction projects and to monitor the operational effectiveness. It is necessary to establish the related rules that can lead the local government to take responsible administration so that the local governments faithfully carry out the non-point source reduction project and achieve the planned achievement and become the sustainable maintenance. Alternative solutions are needed, such as problems with the use of $100{\mu}m$ filter in automatic sampling and analysis, timely acquisition of water sampling and analysis during rainfall, and effective management of non-point sources network operation management. As an alternative, it is necessary to consider improving the performance of sampling and analysis equipment, and operate the base station. In addition, countermeasures are needed if the amount of pollutant reduction according to the non-point source reduction facility promoted by the national subsidy is required to be used as the development load of the TMDLs. As an alternative, it is possible to consider supporting incentive type of part of the maintenance cost of the non-point source reduction facility depending on the amount of pollutants reduction.