Jang, Shinae;Jo, Hongki;Cho, Soojin;Mechitov, Kirill;Rice, Jennifer A.;Sim, Sung-Han;Jung, Hyung-Jo;Yun, Chung-Bangm;Spencer, Billie F. Jr.;Agha, Gul
Smart Structures and Systems
/
v.6
no.5_6
/
pp.439-459
/
2010
Structural health monitoring (SHM) of civil infrastructure using wireless smart sensor networks (WSSNs) has received significant public attention in recent years. The benefits of WSSNs are that they are low-cost, easy to install, and provide effective data management via on-board computation. This paper reports on the deployment and evaluation of a state-of-the-art WSSN on the new Jindo Bridge, a cable-stayed bridge in South Korea with a 344-m main span and two 70-m side spans. The central components of the WSSN deployment are the Imote2 smart sensor platforms, a custom-designed multimetric sensor boards, base stations, and software provided by the Illinois Structural Health Monitoring Project (ISHMP) Services Toolsuite. In total, 70 sensor nodes and two base stations have been deployed to monitor the bridge using an autonomous SHM application with excessive wind and vibration triggering the system to initiate monitoring. Additionally, the performance of the system is evaluated in terms of hardware durability, software stability, power consumption and energy harvesting capabilities. The Jindo Bridge SHM system constitutes the largest deployment of wireless smart sensors for civil infrastructure monitoring to date. This deployment demonstrates the strong potential of WSSNs for monitoring of large scale civil infrastructure.
Korean Journal of Construction Engineering and Management
/
v.20
no.2
/
pp.13-27
/
2019
While temporary construction work applies to a temporary facility, it has a high use frequency during the construction period accounting for around 10% of the construction cost, it requires systematic management. However, construction inspection information of temporary construction work often has no special specification in the design documents and specification items, with the items on various standards also being formidable. Because of this, related inspection are likely to be performed inefficiently with a high probability for occurrence of human errors when quality inspection is conducted for the temporary construction work. In the present study, therefore, apply to the electronic operation support system capable of supporting implementation of inspection of providing related information for the contemporary construction work. To achieve this, a prototype is developed by using IDEF0 to identify information flow by process and organizing EPSS-based quality inspection Task. And then, efficiency of the quality inspection and information accessibility for temporary construction work are to be improved by verification method of Sample Project.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.19
no.4
/
pp.151-160
/
2019
EPC companies to continue operating overseas, it is increasingly becoming apparent that risk is no longer something to be avoided but a subject to be managed. During the bidding stage, the requirements, specifications and project line items within the bid package must be studied in details to analyze the various risk factors in order to avoid cost overruns. However, reviewing vast quantities of bidding documents is time consuming and labor intensive and is not an easy task and this is where automated information technology can help. For this study, I have constructed an ITB analysis model based on Watson AI that can analyze and apply vast amount of documents more effectively in a short time. Configuration of the Watson Explorer AI architecture for AI-based ITB risk management model research, the selection of learning procedures and analysis subjects, and the performance evaluation criteria were defined, and a test bed was constructed to conduct a pilot research. Consequently, I verified the effectiveness of the analytical time reduction and the quality of its results and VOC operations by professionals.
Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. Better on-site management allows for substantial productivity improvements and cost savings. The procurement system should be able to manage a wider variety of materials and products of the required quality in order to have less stock, in less time, using less space, with less investment and avoiding multiple storage stations. The objective of this paper is to demonstrate the advantages of using the Chronographic modeling, by combining spatiotemporal technical scheduling with the 4D simulations, the Last Planner System and the Takt-time when modeling the construction of building projects. This paper work toward the aforementioned goal by examining the impact that material flow has on site occupancy. The proposed spatiotemporal model promotes efficient site use, defines optimal site-occupancy and workforce-rotation rates, minimizes intermediate stocks, and ensures a suitable procurement process. This paper study the material flow on the site and consider horizontal and vertical paths, traffic flows and appropriate means of transportation to ensure fluidity and safety. This paper contributes to the existing body of knowledge by linking execution and supply to the spatial and temporal aspects. The methodology compare the performance and procurement processes for the proposed Chronographic model with the Gantt-Precedence diagram. Two examples are presented to demonstrate the benefits of the proposed model and to validate the related concepts. This validation is designed to test the model's graphical ability to simulate construction and procurement.
Kim Eunseo;Kim Junyoung;Joo Seonu;Ahn Changbum;Park Moonseo
Korean Journal of Construction Engineering and Management
/
v.24
no.3
/
pp.3-11
/
2023
This research examines the need for a quantitative and objective method of calculating baseline productivity in the construction industry, which is known for its high volatility in performance and productivity. The existing literature's baseline productivity calculation methods rely heavily on subjective criteria, limiting their effectiveness. Additionally, data collection methods such as the "Five-minute Rating" are costly and time-consuming, making it challenging to collect detailed data at construction sites. To address these issues, this study proposes an objective baseline calculation method using unimpacted productivity BP, a work check sheet to systematically record detailed data, and a data collection and utilization process that minimizes cost and time requirements. This paper also suggests using unimpacted productivity BP and comparative analysis to address the objectivity and reliability issues of existing baseline productivity calculation methods.
The goal of medicine is to contribute to promoting national health by preventing diseases and providing treatment. The scope of modern medicine isn't merely confined to disease testing, treatment and prevention in accordance to that, and making experiments by using the human body is widespread. The advance in modern medicine has made a great contribution to valuing human dignity and actualizing a manly life, but there is a problem that has still nagged modern medicine: treatment and healing for terminal patients including cancer patients. In advanced countries, pain care and hospice medicine are already universal. Offering a helping hand for terminal patients to lead a less painful and more manly life from diverse angles instead of merely focusing on treatment is called the very hospice medicine. That is a comprehensive package of medical services to take care of death-facing terminal patients and their families with affection. That is providing physical, mental and social support for the patients to pass away in peace after living a dignified and decent life, and that is comforting their bereaved families. The National Hospice Organization of the United States provides terminal patients and their families with sustained hospital care and home care in a move to lend assistance to them. In our country, however, tertiary medical institutions simply provide medical care for terminal patients to extend their lives, and there are few institutional efforts to help them. Hospice medicine is offered mostly in our country by non- professionals including doctors, nurses, social workers, pastors or physical therapists. Terminal patients' needs cannot be satisfied in the same manner as those of other patients, and it's needed to take a different approach to their treatment as well. Nevertheless, the focus of medical care is still placed on treatment only, which should be taken seriously. Ministry for Health, Welfare & Family Affairs and Health Insurance Review & Assessment Service held a public hearing on May 21, 2008, on the cost of hospice care, quality control and demonstration project to gather extensive opinions from the academic community, experts and consumer groups to draw up plans about manpower supply, facilities and demonstration project, but the institutions are not going to work on hospice education, securement of facilities and relevant legislation. In 2002, Ministry for Health, Welfare & Family Affairs made an official announcement to introduce a hospice nurse system to nurture nurse specialists in this area. That ministry legislated for the qualifications of advanced nurse practitioner and a hospice nurse system(Article 24 and 2 in Enforcement Regulations for the Medical Law), but few specific plans are under way to carry out the regulations. It's well known that the medical law defines a nurse as a professional health care worker, and there is a move to draw a line between the responsibilities of doctors and those of nurses in association with medical errors. Specifically, the roles of professional hospice are increasingly expected to be accentuated in conjunction with treatment for terminal patients, and it seems that delving into possible problems with the job performance of nurses and coming up with workable countermeasures are what scholars of conscience should do in an effort to contribute to the development of medicine and the realization of a dignified and manly life.
Saxena, Shailesh;Khan, Mohammad Zubair;Singh, Ravendra;Noorwali, Abdulfattah
International Journal of Computer Science & Network Security
/
v.21
no.11
/
pp.345-353
/
2021
Cloud computing represent a new era of computing that's forms through the combination of service-oriented architecture (SOA), Internet and grid computing with virtualization technology. Virtualization is a concept through which every cloud is enable to provide on-demand services to the users. Most IT service provider adopt cloud based services for their users to meet the high demand of computation, as it is most flexible, reliable and scalable technology. Energy based performance tradeoff become the main challenge in cloud computing, as its acceptance and popularity increases day by day. Cloud data centers required a huge amount of power supply to the virtualization of servers for maintain on- demand high computing. High power demand increase the energy cost of service providers as well as it also harm the environment through the emission of CO2. An optimization of cloud computing based on energy-performance tradeoff is required to obtain the balance between energy saving and QoS (quality of services) policies of cloud. A study about power usage of resources in cloud data centers based on workload assign to them, says that an idle server consume near about 50% of its peak utilization power [1]. Therefore, more number of underutilized servers in any cloud data center is responsible to reduce the energy performance tradeoff. To handle this issue, a lots of research proposed as energy efficient algorithms for minimize the consumption of energy and also maintain the SLA (service level agreement) at a satisfactory level. VM (virtual machine) consolidation is one such technique that ensured about the balance of energy based SLA. In the scope of this paper, we explore reinforcement with fuzzy logic (RFL) for VM consolidation to achieve energy based SLA. In this proposed RFL based active VM consolidation, the primary objective is to manage physical server (PS) nodes in order to avoid over-utilized and under-utilized, and to optimize the placement of VMs. A dynamic threshold (based on RFL) is proposed for over-utilized PS detection. For over-utilized PS, a VM selection policy based on fuzzy logic is proposed, which selects VM for migration to maintain the balance of SLA. Additionally, it incorporate VM placement policy through categorization of non-overutilized servers as- balanced, under-utilized and critical. CloudSim toolkit is used to simulate the proposed work on real-world work load traces of CoMon Project define by PlanetLab. Simulation results shows that the proposed policies is most energy efficient compared to others in terms of reduction in both electricity usage and SLA violation.
Kyoto Protocol is an international convention on concrete performance program for UNFCCC(United Nations Framework Convention on Climate Change), which regulate and prevent to global warming and officially came into effect on February 16, 2005. Kyoto flexible mechanisms, the agreed environmental system in March 1997 in the Third Conference of Parties in UNFCCC General Assembly, Emission Trading System(ETS), Clean Development Mechanism(CDM) and Joint Implementation(JI), are key policies related to environment. In advanced countries, greenhouse gas emissions should be reduced average 5.2% level compared to 1990 in total emissions during 2008-2012. World leading carbon market finished the trial on the EU ETS I greenhouse gas emissions trading system, EU ETS II is operated regularly after 2008. World Bank leads to make 'Prototype Carbon Fund(PCF)' in April 2004, which is the world first carbon fund and a representative public carbon fund type, World Bank operate various funds including present PCF. Thus, I would like to propose as follows in relation to this study: First, in the validity analysis of carbon funds, it would be needed to analyze the Emission Reduction Cost Efficiency(ERCE) of carbon. The ERCE is a break-even value which brings the Net Present Value(NPV) to zero. NPV approach is used among projects and it enables potential projects to be compared and evaluated the ERCE on the basis of the net present value of net future cash flows. Therefore, according to results of analysis, carbon funds should be developed and invested. Second, it would be necessary to allow of issuing bonds together with carbon funds, carbon finance etc. Third, carbon funds, it would be reasonable to have a relatively enough maturity in project and as a financial derivatives in the international financial markets, it is needed various types of transactions. Fourth, it would be needed to standardize the carbon emissions trading for more efficiently. Fifth, it would be necessary to establish and invest in various kinds of domestic and overseas global carbon funds, including governments, privates, governments and privates sectors. And it is also needed to establish the medium and long term plans for carbon funds. Sixth, it would be needed to foster the advanced trade mechanisms for carbon funds in the most effective ways. Finally, carbon funds should be used in harmony with international societies to reduce global warming as the social responsible investing funds and it should be contribute to sustainable development. In addition, it would seem that carbon funds should be studied on establishing the contributable standard of sustainable development in the future assignment.
KSCE Journal of Civil and Environmental Engineering Research
/
v.40
no.6
/
pp.613-622
/
2020
The South Korean government plans for a 37 % reduction in CO2 emissions against business as usual by 2030. Subsequently, the Ministry of Land, Infrastructure and Transport declared a 26.9 % reduction target in greenhouse gas emissions from buildings by 2020 and established the Green Standard for Energy and Environmental Design (G-SEED) to help improve the environmental performance of buildings. Construction companies often work with consulting firms to prepare for G-SEED certification. In the process, owing to inefficient data sharing and work connections, it is difficult to achieve economic efficiency and obtain certification. The objective of this study was to develop an economic model to assist contractors in achieving the required G-SEED scores for materials and resources. To do this, we automated the process for material comparison and selection on the basis of an analysis of actual consulting data, and developed a model that selects material alternatives that can meet the required scores at a minimum cost. Information on materials is input by applying a genetic algorithm to the optimization of alternatives. When the model was applied to actual data, the construction cost could be lowered by 79.3 % compared with existing methods. The economical material selection model is expected to not only reduce construction costs for owners desiring G-SEED certification but also shorten the project design time.
Park, Jae Hong;Ryu, Jichul;Shin, Dong Seok;Lee, Jae Kwan
Journal of Wetlands Research
/
v.21
no.2
/
pp.140-146
/
2019
In order to manage non-point sources, the paradigm of the system should be changed so that the management of non-point sources will be systematized from the beginning of the use and development of the land. It is necessary to change the method of national subsidy support and poeration plan for the non-point source management area. In order to increase the effectiveness of the non-point source reduction project, it is necessary to provide a minimum support ratio and to provide additional support according to the performance of the local government. A new system should be established to evaluate the performance of non-point source reduction projects and to monitor the operational effectiveness. It is necessary to establish the related rules that can lead the local government to take responsible administration so that the local governments faithfully carry out the non-point source reduction project and achieve the planned achievement and become the sustainable maintenance. Alternative solutions are needed, such as problems with the use of $100{\mu}m$ filter in automatic sampling and analysis, timely acquisition of water sampling and analysis during rainfall, and effective management of non-point sources network operation management. As an alternative, it is necessary to consider improving the performance of sampling and analysis equipment, and operate the base station. In addition, countermeasures are needed if the amount of pollutant reduction according to the non-point source reduction facility promoted by the national subsidy is required to be used as the development load of the TMDLs. As an alternative, it is possible to consider supporting incentive type of part of the maintenance cost of the non-point source reduction facility depending on the amount of pollutants reduction.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.