Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam

  • VU, Thong Quoc;PHAM, Cuong Phu;NGUYEN, Thu Anh;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권9호
    • /
    • pp.389-400
    • /
    • 2020
  • A construction project is a designed product made up of labors, materials, and installations in the project positioned on the ground and may include the underground and ground section, and the section in water or on the water surface. It is a civil, industrial, transport, agricultural and rural development, infrastructure, or some other. A key phase in the life cycle of these construction projects is the implementation when building products are made directly with workers, equipment, materials, and managers. If there is a lack of management experience, information, and problem-solving solutions to tackle the risks faced by contractors, especially foreign ones, will fail in controlling the project's cost. This study was conducted with investigations, discussions, and evaluation of the factors that lead to cost overruns in the construction projects of international contractors in Vietnam. The principal component analysis (PCA) showed that those factors that influence cost overruns these construction projects fall into five general groups, including factors related to (i) the owners, (ii) the foreign contractors, (iii) the subcontractors and suppliers, (iv) state management, and (v) the project itself. Besides, the study proposes solutions to limit cost overruns in construction projects and improve the profitability of international contractors in Vietnam.

산림탄소흡수량 정부구매를 위한 산림탄소상쇄 사업의 평균저감비용 분석 (Analysis of the Average Abatement Cost of Forest Carbon Offset Projects for the Government Purchase of Forest Carbon Credits)

  • 김영환
    • 한국기후변화학회지
    • /
    • 제7권4호
    • /
    • pp.391-396
    • /
    • 2016
  • This study was intended to analyze the average abatement cost (AAC) of forest carbon offset projects to suggest a basic credit price for government purchase of forest carbon credits. For this purpose, an a/reforestation project and a forest management project were designed with 30 years of project period. It is assumed to plant pine trees (Pinus densiflora) for the a/reforestation project, while it is assumed to replace rigida pine trees(Pinus rigida) with oak trees (Quercus acutissima) for the forest management project. For each project, the forest carbon stock was calculated and the revenue and the cost were analyzed with standardized management activities. Korea Forest Service has supported private forest owners the cost of management activities and the consulting fee for designing carbon offset project. Therefore, the AAC were analyzed for two cases : the one with subsidy for consulting fee (case 1) and the other with subsidy for both consulting fee and management costs (case 2). In addition, the sensitiveness of AAC was analyzed according to the 4 credit prices : ₩5,000, ₩10,000, ₩15,000 and ₩20,000. The result showed that the AAC analyzed for the case 1 was so high that net revenue would not be expected from all project types with any credit price. However the AAC analyzed for the case 2 was relatively lower than the AAC of case 1. Net revenue was expected from a/reforestation project with credit price over ₩10,000, while from forest management project with credit price over ₩15,000. Based on the AAC analyzed in this study, ₩15,000 was suggested as the basic price for government purchase of forest carbon credit.

Identification of Factors Affecting Time and Cost Performance in Vietnam Construction Projects

  • Long, Le-Hoai;Lee, Young-Dai;Lee, Jun-Yong
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.728-731
    • /
    • 2007
  • In-planned duration and cost at project closing are the two of criteria of successful project and successful project management. In Vietnam, regularly, construction projects are delayed and their costs are overrun. This research employed a questionnaire survey to elicit the causes of this situation by interviewing 87 Vietnamese construction experts. After processing data, 21 causes of delay and cost overruns appropriate with building and industrial project in construction stage were inferred and ranked. Spearman's rank correlation tests showed that there're no differences in the viewpoints between parties in project.

  • PDF

DERIVING ACCURATE COST CONTINGENCY ESTIMATE FOR MULTIPLE PROJECT MANAGEMENT

  • Jin-Lee Kim ;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.935-940
    • /
    • 2005
  • This paper presents the results of a statistical analysis using historical data of cost contingency. As a result, a model that predicts and estimates an accurate cost contingency value using the least squares estimation method was developed. Data such as original contract amounts, estimated contingency amounts set by maximum funding limits, and actual contingency amounts, were collected and used for model development. The more effective prediction model was selected from the two developed models based on its prediction capability. The model would help guide project managers making financial decisions when the determination of the cost contingency amounts for multiple projects is necessary.

  • PDF

연구개발 프로젝트관리를 위한 시각화모델 (Dongeui Visual-PERT/CPM for R&D Project Management)

  • 황흥석
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2000년도 추계학술대회 및 정기총회
    • /
    • pp.268-271
    • /
    • 2000
  • In these days, the technical advances and complexities have generated much of the difficulties in managing the project resources, both time and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgements concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a two-step approaches :in the step 1, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning, In the second step, we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. Computer implementation of this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of visual graphical. Also developed GUI-type program, Dongeui Visual-PERT/CPM. The results of this research will provide the project managers with an efficient management tool.

  • PDF

Prioritization of Price Volatility Management Strategies in Construction Projects

  • Joukar, Alireza;Nahmens, Isabelina;Harvey, Craig
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.15-25
    • /
    • 2017
  • The existence of material price volatility in construction projects puts forward substantial risks for all parties involved. Depending on the parties involved in the project, type of contracts, and state of the market various risk management strategies are practiced by contracting parties to manage project risks related to price volatility. Unfortunately, in many cases companies fail to select an adequate approach to better manage volatilities of material prices due to the lack of a decision support system to aid in the selection of an appropriate strategy based on the project characteristics. The aim of this study is to identify critical project factors and align them to documented strategies to manage price volatility based on an extensive literature review and industry interviews. This study found Integrated Project Delivery (IPD) as the ideal strategy with respect to project duration; quantitative risk management methods with respect to the cost; and Price Adjustment Clauses (PAC) with respect to the risk allocation, as the top price volatility management strategies.

COVID-19's Effect on a Hotel Construction: A Case Study

  • Kayastha, Rujan;Kisi, Krishna P.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.649-657
    • /
    • 2022
  • The COVID-19 pandemic has unprecedented impacts on different sectors around the globe. The effects observed in developing countries are even more severe. Some projects stopped while many have cost and time overrun issues. This paper conducted a case study on the COVID-19's effects on a hotel construction project in Nepal. The study reviewed the literature on COVID-19 and its impact on construction sectors and conducted a semi-structured interview with the project's personnel. The interview response was analysed and the contributing factors that impacted the project and its performance were identified. The paper found financial, operational, contractual, safety, and risk management issues in the hotel project. Overall, the project cost increased by 32% where the material cost increased by 35% and labor cost increased by 28%. This research discusses causes, measures, and provides a broad perspective of the problems, significant challenges, and opportunities associated with the effects of COVID-19 on the construction industry. The Owner as well as the Contractors incurred added costs because of COVID-19. The paper identified contributing factors and presented the challenges which could be used as opportunities to minimize unforeseen impacts of the pandemics in near future. The lesson learned from this case study was that the labor cost and materials cost could have been minimized if the Owner and the Contractor had established alternative resources such as using locally available labor, materials, and alternative suppliers.

  • PDF

A STUDY ON THE DEVELOPMENT OF A COST MODEL BASED ON THE OWNER'S DECISION MAKING AT THE EARLY STAGES OF A CONSTRUCTION PROJECT

  • Choong-Wan Koo;Sang H. Park;Joon-oh Seo;TaeHoon Hong;ChangTaek Hyun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.676-684
    • /
    • 2009
  • Decision making at the early stages of a construction project has a significant impact on the project, and various scenarios created based on the owner's requirements should be considered for the decision making. At the early stages of a construction project, the information regarding the project is usually limited and uncertain. As such, it is difficult to plan and manage the project (especially cost planning). Thus, in this study, a cost model that could be varied according to the owner's requirements was developed. The cost model that was developed in this study is based on the case-based reasoning (CBR) methodology. The model suggests cost estimation with the most similar historical case as a basis for the estimation. In this study, the optimization process was also conducted, using genetic algorithms that reflect the changes in the number of project characteristics and in the database in the model according to the owner's decision making. Two optimization parameters were established: (1) the minimum criteria for scoring attribute similarity (MCAS); and (2) the range of attribute weights (RAW). The cost model proposed in this study can help building owners and managers estimate the project budget at the business planning stage.

  • PDF

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

A METHOD OF REVISING RETRIEVED SIMILAR CASES IN GA-CBR COST MODELS

  • Sooyoung Kim;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Joseph Ahn
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.182-186
    • /
    • 2011
  • Early cost estimates are important to decision-making for a construction project. Moreover, the possibility of reducing the project cost is getting less as the project is progressed. Case-based reasoning (CBR), which can be viewed as an effective method for early cost estimating, is widely utilized recently. Early cost estimates using CBR have advantages over the traditional ones as they produce reasonable outputs and self-studying is possible by simply adding new cases. Case-based reasoning is composed of a cycle of retrieve, reuse, revise, and retain process. However, in the majority of research cases, they are focused on how to retrieve the similar cases, instead of revising the cases which is expected to increase accuracy results of cost estimation. This research suggests a method of revising retrieved similar cases in a GA-CBR cost model which is widely studied and utilized for early cost estimating recently. To validate the proposed method, case study is conducted based on Korean public apartment projects.

  • PDF