• Title/Summary/Keyword: Project Assessment

Search Result 1,271, Processing Time 0.026 seconds

Improvement for Technology Readiness Assessment with Weighting Method for Defense Acquisition Project (가중치 산출방법을 활용한 획득방안 분석단계의 기술성숙도평가 개선방안)

  • Kim, Mi-Seon;Noh, Eun-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.538-544
    • /
    • 2021
  • Technology readiness assessment is a procedure for managing defense project risk factors based on the preemptive identification of technical risks. Under current regulations, technology readiness is determined based on considerations of the ratings of factors itemized on a checklist, whether unsatisfied factors have a fatal impact on the project, and whether countermeasures for unsatisfied factors have been established. However, objective criteria for assessing the impact of unsatisfied factors have not been presented, and thus, at present, the results of technology readiness level determinations are largely subjective. In addition, the importance of questions on the checklist is dependent on individual project characteristics and this is not considered during the assessment process. In this paper, we propose an improved technology readiness assessment procedure that considers the characteristics of each project. Using the proposed procedure, we quantitatively determined the importance of each checklist item using a weighting method. We found the devised procedure improved the reliability and objectivity of technology readiness assessment results. A case analysis of a complex weapons system is presented to demonstrate these improvements.

The Study on the Cause and the Impact of the Development of a Decision Making Systems Like EIA in Cheju Island (제주도 지역의 각종 영향평가제도들의 출현 원인과 영향에 대한 연구)

  • Chung, Yong;Yang, Man-Sik;Kim, Yong-Bum
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.1
    • /
    • pp.121-133
    • /
    • 1997
  • EIA should be regarded as an aid to improve the decision making processes because it seeks public opinion and external knowledge in order to ensure the maximum degree of fairness and balance in the final decision as much as possible. According to the above benefits, various decision making systems containing EIA concepts were developed in the area of ground water, traffic, disaster or accident and environment in Cheju Island. But because the development of various decision making systems can be the cause of new impact, it was studied the cause and impact of their development. The major reasons for developing the various decision making system like EIA are the lack of the consideration for the impact of project when it is selected project fulfilling EIA and the increase of the effort for the improvement in the professional quality for one subject without the comprehensive assessment among the subject related to environmental impacts. And the development of the various decision making systems like EIA has caused the several impacts like cost elavoration, the relay of project period, etc. Therefore, after it is improved the problems of present EIA on the comprehensive assessment, the various decision making systems like EIA should be integrated in EIA decision making system.

  • PDF

Algorithm selecting Software development route suitable for Project environment and characteristics (프로젝트 환경과 특성에 따른 소프트웨어 개발 경로 선정 알고리즘)

  • Jung Byung-Kwon;Yoon Seok-Min
    • The KIPS Transactions:PartD
    • /
    • v.13D no.1 s.104
    • /
    • pp.87-96
    • /
    • 2006
  • This paper focused on the method for customizing software development path, considering the project environments and characteristics. he selection standard of development path is composed of ten items, based on the process of ISO/IEC TR 15721 Information Technology Guide for ISO/IEC 12207 (Software Life Cycle Process) and ISO/IEC 15504 Information technology - Process assessment. The ten items were reflected the project environments and characteristics, at the same time the items conduct the adjustment item of selecting project development path. An algorithm for selecting software development path through items of the project environments and characteristics is presented. To test the algerian in this paper, a system for selecting development path, which reflected algorithm was developed. The development project for web-based system were also adopted to the system for selecting development path. In addition, provened hand-worked project path process differed from machine-worked project path process. The reason why it differs is that outputs were mixed or their names were changed. The effect is to select easily software development route suitable for project environment and characteristics.

Assessment of the Impacts of "pre-Compensation and Post-Construction Policy" on Public Construction Projects (선보상-후시공 제도의 공공건설사업 파급효과 분석)

  • Kim Sang-Bum;Choi Jeong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.245-254
    • /
    • 2004
  • Pre-compensation and post-construction policy'(PCPC) is a part of $\ulcorner$public project performance improvement policies (PPPIP)$\lrcorner$ whose purpose is to reduce the construction project cost by $20\%$. This research focuses on measuring the quantitative and qualitative impacts of PCPC public construction project. The evaluation of PCPC was conducted using five performance indices which are measuring performance improvement in terms of project cost and schedule. The analysis results show that implementation of this policy reduced $4.8\%$ of public construction project budget while playing a positive role in shortening the project schedule.

An Empirical Investigation of Vendor Readiness to Assess Offshore Software Maintenance Outsourcing Project

  • Ikram, Atif;Jalil, Masita Abdul;Ngah, Amir Bin;Khan, Ahmad Salman;Mahmood, Yasir
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.3
    • /
    • pp.229-235
    • /
    • 2022
  • The process of correcting, upgrading, and improving software products after they have been handed over to the consumer is known as software maintenance. Offshore software maintenance outsourcing (OSMO) clients benefit from cost savings, time savings, and improved quality software through OSMO. In most circumstances, the OSMO vendor makes a lot of money but not in all the cases. Especially, when the OSMO project offer is not properly assessed. An efficient outsourcing contract might yield successful outcomes for outsourced projects. But before sending a detailed proposal to bid on the OSMO project the vendor must have to assess the client's project (business offer) requirements. The purpose of this study is to find out common trends within the assessment of a OSMO project. A case study approach along with semi-structured interviews from eight companies concluded ten common practices and several roles. Among these practices, four (code structure, requirements, communication barriers and required infrastructure) were consistent amongst the responses .The findings, limitations and future work are discussed.

New Environmental Impact Assessment Technology (신환경영향평가기술(新環境影響評價技術)의 개발방향(開發方向))

  • Han, Sang-Wook;Lee, Jong-Ho;Nam, Young-Sook
    • Journal of Environmental Impact Assessment
    • /
    • v.9 no.4
    • /
    • pp.277-290
    • /
    • 2000
  • The purpose of this study is to identify the problems of environmental impact assessment(EIA) and to suggest new EIA technology. The problems of EIA in Korea can be summarized as follows. First, the EIA does not reflect the impact of policy, plan and program on environment. Second, the project EIA does not consider the cumulative impacts such as additive impacts, synergistic impacts, threshold/saturation impacts, induced and indirect impacts, time-crowded impacts, and space-crowded impacts. Third, the EIA techniques in Korea are not standardized. Finally, the present EIA suggests only alternatives to reduce adverse impacts. To solve above-mentioned problems, the development of new EIA technology is essential. First, the new EIA technology should be developed toward pollution prevention technology and comprehensive and integrated environmental management technology. Second, new fields of EIA for pollution prevention contain strategic environmental assessment, cumulative impacts assessment, socio-economic impact assessment, cyber EIA and EIA technology necessary after the reunification of Korean Peninsula. Third, EIA technology for integrated environmental management contains the development of integated environment assessment system and the development of packaged EIA technology. The EIA technology for integrated environmental assessment system contains (1) development of integrated impact assessment technology combining air/water quality model, GIS and remote sensing, (2) integrated impact assessment of EIA, traffic impact assessment, population impact assessment and disaster impact assessment. (3) development of integrated technology combining risk assessment and EIA (4) development of integrated technology of life cycle assessment and EIA, (5) development of integrated technology of spatial planning and EIA, (6) EIA technology for biodiversity towards sustainable development, (7) mathematical model and GIS based location decision techniques, and (8) environmental monitoring and audit. Furthermore, there are some fields which need packaged EIA technology. In case of dam development, urban or industrial complex development, tourist development, landfill or combustion facilities construction, electric power plant development, development of port, road/rail/air port, is necessary the standardized and packaged EIA technology which considers the common characteristics of the same kind of development project.

  • PDF

A Study on Assessment Standard for Environmental Impact Assessment (한국에서의 환경영향평가 평가기준에 대한 연구)

  • Lee, Mu-Choon
    • Journal of Environmental Impact Assessment
    • /
    • v.2 no.2
    • /
    • pp.111-116
    • /
    • 1993
  • The EIA system was developed during ten odd years of introduction. On the other hand, the contentional development representing systematical fidelity does not match to it. I surveyed the problems of EIA on the point of environmental items with no legal standards. EIA is being executed only once on the planning stage. If the present EIA system has two times of execution, the quality of EIA will be much better. First, on the stage of deciding location of the project, EIA should be done. And next, detailed EIA should be done on the stage of executing the project. To describe the problems of EIA, I surveyed the legislations on the point of the former stages, investigation of present status and anticipation. And I tried a theoretical approach to EIA. The knowledge of things, the subject's standpoint and his valuation are all put together in the EIA. The knowledge of relationship between air and water pollutants and their impact on human is accumulated much. On the other hand, the knowledge of the compounded item, fauna-flora(natural ecology) is partial and causes many difficulties. I pointed out the absurdities of assessment technique dealing the standards and introduced assessment technique being applied to items with no physico-chemical standards such as wild lives.

  • PDF

A Study on the Development and Application of Rubrics for Performance Assessment in Terms of Promoting Program Learning Outcomes (학습성과 수행평가를 위한 루브릭 개발과 적용에 관한 연구)

  • Shin, Minhee
    • Journal of Engineering Education Research
    • /
    • v.15 no.5
    • /
    • pp.108-118
    • /
    • 2012
  • The purpose of this study was to provide analytic rubrics for measuring teamwork(PO6), communication and presentation skills(PO7), and life-long learning(PO8) based on theoretical concepts of performance assessment and rubrics. Also, this study analyzed data about performance assessment and rubics from courses offered through college of engineering. Participants were 34 senior engineering students who took the course 'Technical writing and presentation'. In the second week of the course, students were given the pre-test instrument which was developed for measuring students' understanding of program outcomes for this study. After performing project activities using rubrics, students were encouraged to complete the post-test instrument and the reaction questionnaire during the ninth week. The data were analyzed by using SPSS 14.0 and Microsoft Excel. The research findings are as follows. First, to promote and evaluate program learning outcomes appropriately, performance assessment-based on rubircs should be implemented. Second, in the reaction questionnaire about the rubircs, students answered that using rubircs for performing the project was very useful for understanding the performance procedures and assessment criteria. Third, the mean of understanding of program outcomes of students in post-test was significantly increased than in the pre-test(p<.0001). From the findings, performance assessment and rubrics should be used as evaluation tools at course levels in terms of promoting program learning outcomes for engineering education.

Allocation of Design Assurance Level for KASS Based on International Standards (국제표준에 기반한 KASS 개발보증레벨 할당)

  • Bae, Dong-hwan
    • Journal of Advanced Navigation Technology
    • /
    • v.20 no.1
    • /
    • pp.1-7
    • /
    • 2016
  • Since 2014, MOLIT (Ministry of Land, Infrastructure, and Transport) is carrying out a KASS project to develop and construct Korean SBAS. KASS can cause damage of human & properties if it has some problem during operation. Therefore, system safety assessment for KASS development is very important. Principal point of system safety assessment is the allocation of DAL(design assurance level) based on the hazard identification and classification. In this parer, the author conducts the allocation of DAL for KASS & its sub-systems based on the international standard(SAE ARP4761), which suggests a best practice of aviation system safety assessment. The result of this paper are the first step of system safety assessment, and can be used for further system safety assessment of KASS project.

Development of a Collaborative e-Learning Evaluation Model (이러닝 협동학습 평가 모델 개발)

  • Uyanga, Tserengombo;Lee, Kilhung
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.11 no.1
    • /
    • pp.135-144
    • /
    • 2015
  • This study aims to propose an evaluation model that enables cooperative learning using e-Learning system. Even if the teacher and the student are not in the same place at the same time, the team project deliverable submitted by the student to the online system can be viewed by the teacher, enabling the teacher to assess the student not only based on the project but also in many other aspects. The proposed e-learning cooperative learning model allows the development of assessment factors, using such factors in assessment of the student's activities which are performed through the e-learning system, and the feedback of the results to the student so that the student is further motivated for learning. The teacher performs a comprehensive assessment of such factors, which is considered in conjunction with the student's assessment. Implementing the cooperative learning model proposed in this study in various e-learning systems such as Moodle is expected to motivate the student for learning, produces better cooperative learning results, provides greater convenience of assessment to the teacher, and improves fairness of assessment by showing the student's activities in real time.