• 제목/요약/키워드: Project Assessment

검색결과 1,257건 처리시간 0.035초

환경영향평가의 역할 및 범위 재정립 방안연구 (A Study on Reforming the Roles and Scope of Environmental Impact Assessment)

  • 김선희
    • 환경영향평가
    • /
    • 제9권4호
    • /
    • pp.315-322
    • /
    • 2000
  • Environmental Impact Assessment(EIA) was first formally established in the Korea in 1981. Subsequently there has been a rapid growth in EIA activity, and over one hundred fifty environmental impact statements are now published in Korea each year. Although EIA now has almost 20 years of history in the Korea, elsewhere the development of roles and practice is more recent. Development is moving apace in many countries, including the Japan and the EU Member States. Such progress has not been without its problems, and a number of the current issues in EIA-scope of the assessment, the relative roles, the quality of assessment and monitoring and auditing after decision, and so on- are highlighted. So the purpose of this article is to reform the EIA roles and process, in extending the scope of activity, and assessing effectiveness. This article suggested improving the effectiveness of project assessment, widening the scope: stretegic environmental assessment, and extending EIA to project design process, environmental monitoring and feedback system.

  • PDF

봉독약침이 류마티스 관절염 환자의 기능회복 및 삶의 질에 미치는 영향 (Effects of Bee Venom Acupuncture on the Rehabilitation and Quality of Life in Rheumatoid Arthritis Patients)

  • 이상훈;이현종;박상민;김수영;박재경;홍승재;양형인;최도영;김건식;이두익;이윤호;이재동
    • 대한약침학회지
    • /
    • 제5권2호
    • /
    • pp.63-70
    • /
    • 2002
  • Objective: To evaluate the effects of bee venom acupuncture(BVA) on the rehabilitation and quality of life in rheumatoid arthritis(RA) patients Methods: Patients with RA were treated with the BVA therapy twice a week for 3 months. Tender joint counts, swollen joint counts, morning stiffness, Erythrocyte Sedimentation Rate(ESR), C-reactive protein(CRP), patient global assessment, physician global assessment, Korean health assessment questionnaire(KHAQ) were estimated and analyzed before and after BVA therapy. Results: Tender joint counts, swollen joint counts, morning stiffness showed significant decrease after BVA therapy. But, as acute inflammatory reactants, ESR showed no significant difference and CRP showed significant increase after BVA therapy. Patient global assessment, physician global assessment, and KHAQ index showed significant improvement after BVA therapy. Conclusions: BVA therapy can improve rehabilitation and health-related quality of life in RA patients as well as clinical symptoms and signs. Further study is required in more population with large scale including acute inflammatory reaction of BVA therapy.

해양에너지개발사업 환경영향평가 검토유형 및 중점평가사항 진단 (Diagnosis of Scoping and Type of Review on the Marine Environmental Impact Assessment for Ocean Energy Development Project)

  • 이대인;김귀영;탁대호;이용민;최진휴;김혜진;이지혜;윤성순
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제18권3호
    • /
    • pp.179-188
    • /
    • 2015
  • 본 연구는 연안 육역 및 해역에서 일어나고 있는 해양 신재생에너지 개발계획 및 추진사업을 분석하고, 해양환경 및 생태계와 관련된 중점평가사항을 진단하여 효율적인 스코핑(Scoping) 방안과 정책제언을 제시하였다. 주요한 사업유형으로는 공유수면에는 조력, 해상풍력 및 파력발전이 많았으며, 연안 육역에는 태양광발전사업이 주로 계획되었다. 조력발전 등 대규모 개발사업 추진 시, 상위계획에 따른 전략환경영향평가(SEA)와 공유수면매립기본계획 등 사전평가단계에서는 입지의 타당성과 계획의 적정성 측면에서 연안관리지역계획에 따른 용도구역 등 다른 계획과의 조화, 실질적인 대안분석, 그리고 해양수산 규제지역 분포와 어장이용 등 기 해양공간계획과의 상호 연관성 진단 등이 중요하다. 또한, 해역이용협의나 환경영향평가 등 실시단계에서의 구체적인 평가에서는 사업유형별로 중점평가사항에 대한 철저한 진단, 실효적인 사후모니터링 및 저감방안의 제시가 핵심으로 고려되어야 할 것이다. 특히, 순수하게 해양공간에서 일어나는 에너지발전사업일 경우에는 해양공간계획 방향과 연계되는 사전평가방안 도입 및 통합 "해양환경영향평가" 체제로의 전환 등 해양수산부가 주도하는 평가제도의 개선방안이 필요할 것으로 판단된다.

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF

한국 환경 영향평가제도의 변천 (Regulatory Development of Environmental Impact Assessment in Korea)

  • 장준기;이재운;권명희;정동환
    • 환경영향평가
    • /
    • 제2권2호
    • /
    • pp.95-103
    • /
    • 1993
  • EIA has been introduced as a tool for environment protection into promulgation of the Environment Preservation Act in 1977, which replaced the Pollution Control Act in Korea. EIA system has been improved with the enlargement of project type, public participation, guideline improvement, and regulatory development. Recently, Environmental Impact Assessment(EIA) Act will have an important role for sustainable development. This article deals with regulatory development, implementation order, EIA project type, and EIS preparation guidelines by Act promulgated and amended, also it explains comparison analysis of Environmental Policy Act and Environment Impact Assessment Act Major results are summarized in the table.

  • PDF

환경영향평가서 분석 (Analysis of Environmental Impact Statement)

  • 이재운;장준기;권명희;방규철;정동환
    • 환경영향평가
    • /
    • 제3권2호
    • /
    • pp.77-84
    • /
    • 1994
  • The study is to analyze the contents of Environmental Impact Statement(EIS) and supplementary EIS prepared from 1981 to 1992. The contents are project area, project cost, EIS volume, project term, assessment term, EIS preparation cost, land use plan, and kinds of predictive model concerning air quality, water quality, noise and vibration etc. by project type. Data are collected with EIS analysis checklist and analyzed by $SPSS/PC^+$.

  • PDF

OECD 병원 성과 프로젝트의 동향과 국내 시사점 (Trend and Implication of OECD Hospital Performance Project)

  • 박춘선;최효정;황수희;임지혜;김경훈;김선민
    • 한국의료질향상학회지
    • /
    • 제22권1호
    • /
    • pp.11-26
    • /
    • 2016
  • The Organization for Economic Cooperation and Development, which has continuously evaluated the performance of healthcare systems, has recently invested much effort into hospital performance measurement. The purpose of this paper is to introduce the hospital performance measurement programs operated by international organizations or at the national level based on the OECD's hospital performance project. Health Insurance Review & Assessment service (HIRA)'s quality assessment was analyzed based on the analytical framework of the OECD's hospital performance project. The hospital performance measurement programs of WHO, Canada, Australia, United States and United Kingdom are briefly explored, in view of the conceptual framework, key performance dimensions and indicators that are currently in use. The OECD suggested seven key dimensions of hospital performance: timeliness, efficiency, continuity, effectiveness and appropriateness, staff orientation, patient orientation and safety. The analysis of the quality assessment program of HIRA, which operates 36 diseases and procedures and 347 indicators, shows that the numbers of indicators are relatively small in the areas of safety, patient centeredness and efficiency. Continuity of care and staff orientation are not fully developed also, but the situations are similar in other countries. In conclusion, hospital performance measurement using stable and comprehensive data should be developed to improve overall system performance, and discussions on a conceptual framework that can lay out directions and key performance domains need to take into place.

탄소흡수원을 고려한 개발사업 환경영향평가 방안(II) - 주택 재개발 사업을 중심으로 - (Environmental Impact Assessment for Development Projects Considering Carbon Sink and Sequestration(II) - Focused on a Housing Redevelopment Project -)

  • 황상일;박선환
    • 환경영향평가
    • /
    • 제20권1호
    • /
    • pp.79-87
    • /
    • 2011
  • In this study, we investigated the effect of carbon sequestration and sink on the environmental impact assessment of a housing redevelopment project. Through the case study, we found that the amount of carbon sequestration and sink increased with the increase of the area of park and green space and, furthermore, the amount of carbon emission decreased slightly with implementation of district heating and renewable energy. Therefore, it is necessary for its land use plan to be established to minimize the amount of net carbon emission, taking account of both the amount of present carbon emission and the amount of the future carbon sink, sequestration, and emission.

탄소흡수원을 고려한 개발사업 환경영향평가 방안(III) - 보금자리주택 사업을 중심으로 - (Environmental Impact Assessment for Development Projects Considering Carbon Sink and Sequestration(III) - Focused on a Bogeumjari Housing Project -)

  • 황상일;박선환
    • 환경영향평가
    • /
    • 제20권2호
    • /
    • pp.235-248
    • /
    • 2011
  • In this study, we investigated the effect of carbon sequestration and sink on the environmental impact assessment of a Bogeumjari Housing Project. Through the case study, we found that, if the project is implemented, the amount of carbon stock tends to decrease greatly while as the amount of the carbon emission tends to greatly increase. Furthermore, we found that the future land use should be planned in detail in order to maintain the soil carbon stock prior to development. Also, enlargement of undeveloped forest land area would be more efficient than that of newly planted area in terms of carbon sequestration.

ENVIRONMENTAL ECONOMICS FOR CONSTRUCTION

  • Suk hyun Kwon;Nam Ho Cho;Kyoung Hee Lee;Kyoung Ju Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.280-285
    • /
    • 2011
  • This study aims to propose an assessment model on environmental economics which will provide useful information in making a decision for the implementation of pro-environmental and economical construction projects. To meet the objective, this study suggests a procedure to estimate environmental cost of construction projects. The model combines environmental load assessment and environmental value assessment. The environmental cost of pollutant generated from the construction project was estimated utilizing the Contingent Valuation Method (CVM) which is a value assessment method borrowed from economic science. The devised model is expected to provide a useful methodology that will scientifically support the planning and management of sustainable construction not only in the environmental aspect but also in the economical aspect.

  • PDF