• Title/Summary/Keyword: Project Activity

Search Result 852, Processing Time 0.025 seconds

Enhanced Calreticulin Expression Promotes Calcium-dependent Apoptosis in Postnatal Cardiomyocytes

  • Lim, Soyeon;Chang, Woochul;Lee, Byoung Kwon;Song, Heesang;Hong, Ja Hyun;Lee, Sunju;Song, Byeong-Wook;Kim, Hye-Jung;Cha, Min-Ji;Jang, Yangsoo;Chung, Namsik;Choi, Soon-Yong;Hwang, Ki-Chul
    • Molecules and Cells
    • /
    • v.25 no.3
    • /
    • pp.390-396
    • /
    • 2008
  • Calreticulin (CRT) is one of the major $Ca^{2+}$ binding chaperone proteins of the endoplasmic reticulum (ER) and an unusual luminal ER protein. Postnatally elevated expression of CRT leads to impaired development of the cardiac conductive system and may be responsible for the pathology of complete heart block. In this study, the molecular mechanisms that affect $Ca^{2+}$-dependent signal cascades were investigated using CRT-overexpressing cardiomyocytes. In particular, we asked whether calreticulin plays a critical role in the activation of $Ca^{2+}$-dependent apoptosis. In the cells overexpressing CRT, the intracellular calcium concentration was significantly increased and the activity of PKC and level of SECAR2a mRNA were reduced. Phosphorylation of Akt and ERKs decreased compared to control. In addition the activity of the anti-apoptotic factor, Bcl-2, was decreased and the activities of pro-apoptotic factor, Bax, p53 and caspase 8 were increased, leading to a dramatic augmentation of caspase 3 activity. Our results suggest that enhanced CRT expression in mature cardiomyocytes disrupts intracellular calcium regulation, leading to calcium-dependent apoptosis.

A New Approach for Resource Allocation in Project Scheduling with Variable-Duration Activities

  • Kim, Soo-Young;Leachman, Robert C.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.19 no.3
    • /
    • pp.139-149
    • /
    • 1994
  • In many project-oriented production systems, e. g., shipyards or large-scale steel products manufacturing, resource loading by an activity is flexible, and the activity duration is a function of resource allocation. For example, if one doubles the size of the crew assigned to perform an activity, it may be feasible to complete the activity in half the duration. Such flexibility has been modeled by Weglarz [13] and by Leachman, Dincerler, and Kim [7[ in extended formulations of the resource-constrained poject scheduling problem. This paper presents a new algorithmic approach to the problem that combines the ideas proposed by the aforementioned authors. The method we propose involves a two-step approach : (1) solve the resource-constrained scheduling problem using a heuristic, and (2) using this schedule as an initial feasible solution, find improved resource allocations by solving a linear programming model. We provide computational results indicating the superiority of this approach to previous methodology for the resource-constrained scheduling problem. Extensions to the model to admit overlap relationship of the activities also are presented.

  • PDF

ESTABLISHMENT OF DECISION MAKING FRAMEWORK FOR SUPPORTING COOPERATION AMONG STAKEHOLDERS IN MEGA PROJECT

  • Jee Hee Lee;June Seong Yi;Seung Woo Shin;Kyung Rog Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1288-1293
    • /
    • 2009
  • Performing 'Mega Project' in which various stakeholders are involved is difficult to control due to the respective conflicting objectives. Urban regeneration which is being challenged issue in various ways can be defined as the mega project. Since the mega project like urban regeneration a long-continued project and includes a lot of participants whose benefits conflict, cooperation among stakeholders is essential. Moreover, as the project goes, diverse decision making situations which require collaboration happen, and if proper decision making cannot be given at that time, the whole project would have critical effects. Also, since each activity concerns numerous stakeholders, prompt decision making is difficult in the mega project. Therefore, the objective of this study is to support stakeholder's cooperative decision making in order for conducting successful project. For the purpose of the paper, the concept of cooperation in mega project is redefined and a cooperative decision making framework is suggested. Also, the term of governance, which means cooperative mechanism based on the mutual trust, information sharing and partnership, is applied to the newly defined cooperation. The suggested cooperative decision making framework contains the structure of stakeholders in urban regeneration project which enables participants to understand the relationship among bodies and checklists for supporting decision making appropriately. The application of the framework proposed in this research is expected to contribute subjects' suitable decision making by providing proper information in a timely manner.

  • PDF

The Effects of a University Cooperation Project on Urban Regeneration for Recovery of Commercial Supremacy

  • Ryu, Tae-Chang;Sung, Chang-Soo
    • Journal of Distribution Science
    • /
    • v.14 no.10
    • /
    • pp.29-38
    • /
    • 2016
  • Purpose - This research examines the effects of local universities on urban regeneration to recover commercial supremacy in the original urban area and provides clear information on the "University Cooperation Project for Traditional Market." Research design, data, and methodology - The "University Cooperation Project for Traditional Market" started in 2015. This study was conducted focusing on 22 places selected in 2015 and the project content in those locations. Results - This study analyzes the link to urban regeneration and spreads the concept along with theoretical consideration of university cooperation for traditional markets. Additionally, it promotes policies to help propel the project based on characteristics of the region. Conclusions - A differentiated project should be created, with characteristics of the region reflected, and detailed programs developed and implemented resulting in meaningful achievement from the perspective of members of the local community, who may have deviated from existing perspectives. Additionally, opportunities should be established for the direct application of young consumer ideas through experimental business to regenerate the traditional market (commercial supremacy), the center of the local economic society.

Field Test of Automated Activity Classification Using Acceleration Signals from a Wristband

  • Gong, Yue;Seo, JoonOh
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.443-452
    • /
    • 2020
  • Worker's awkward postures and unreasonable physical load can be corrected by monitoring construction activities, thereby increasing the safety and productivity of construction workers and projects. However, manual identification is time-consuming and contains high human variance. In this regard, an automated activity recognition system based on inertial measurement unit can help in rapidly and precisely collecting motion data. With the acceleration data, the machine learning algorithm will be used to train classifiers for automatically categorizing activities. However, input acceleration data are extracted either from designed experiments or simple construction work in previous studies. Thus, collected data series are discontinuous and activity categories are insufficient for real construction circumstances. This study aims to collect acceleration data during long-term continuous work in a construction project and validate the feasibility of activity recognition algorithm with the continuous motion data. The data collection covers two different workers performing formwork at the same site. An accelerator, as well as portable camera, is attached to the worker during the entire working session for simultaneously recording motion data and working activity. The supervised machine learning-based models are trained to classify activity in hierarchical levels, which reaches a 96.9% testing accuracy of recognizing rest and work and 85.6% testing accuracy of identifying stationary, traveling, and rebar installation actions.

  • PDF

A Study on the Participation's Status and Promotion Plan of Senior Social Activity Support Project (노인 사회활동 지원사업의 참여 실태 및 활성화 방안 연구)

  • Hyun, Ta-kyung;Kim, Hyung-mo
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.7
    • /
    • pp.264-278
    • /
    • 2016
  • This study aims to examine the participation status and working conditions of seniors that participate in senior social activity support project, and analyze the influential relationship with subjective participation satisfaction based on participant attributes. In terms of the participation status, participating seniors became aware of the project through facilities and about 70% participated in the public interest type; the primary goal was for a short-term financial preservation. As an analysis result on participation effectiveness, longer participation period and time affected the participation seniors' working conditions and self-esteem negatively, implying that a flexible and effective operation of participation period is necessary. Also, while seniors with financial stability were more positively affected on their subjective satisfaction, other significant variables had negative effects. This study holds a significance in providing political implications as the basic data to improve and vitalize future senior social activity support project through the analysis of effectiveness, such as working conditions, self-esteem and subjective satisfaction based on participant attributes, including participant characteristics, participation status and participation degree.

A Stochastic Simulation Model for Estimating Activity Duration of Super-tall Building Project

  • Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.397-402
    • /
    • 2013
  • In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.

  • PDF

Protective effect of Korean Red Ginseng extract against Helicobacter pylori-induced gastric inflammation in Mongolian gerbils

  • Bae, Minkyung;Jang, Sungil;Lim, Joo Weon;Kang, Jieun;Bak, Eun Jung;Cha, Jeong-Heon;Kim, Hyeyoung
    • Journal of Ginseng Research
    • /
    • v.38 no.1
    • /
    • pp.8-15
    • /
    • 2014
  • Helicobacter pylori-induced gastric inflammation includes induction of inflammatory mediators interleukin (IL)-8 and inducible nitric oxide synthase (iNOS), which are mediated by oxidant-sensitive transcription factor NF-${\kappa}B$. High levels of lipid peroxide (LPO) and increased activity of myeloperoxidase (MPO), a biomarker of neutrophil infiltration, are observed in H. pylori-infected gastric mucosa. Panax ginseng Meyer, a Korean herb medicine, is widely used in Asian countries for its biological activities including anti-inflammatory efficacy. The present study aims to investigate whether Korean Red Ginseng extract (RGE) inhibits H. pylori-induced gastric inflammation in Mongolian gerbils. One wk after intragastric inoculation with H. pylori, Mongolian gerbils were fed with either the control diet or the diet containing RGE (200 mg RGE/gerbil) for 6 wk. The following were determined in gastric mucosa: the number of viable H. pylori in stomach; MPO activity; LPO level; mRNA and protein levels of keratinocyte chemoattractant factor (KC, a rodent IL-8 homolog), IL-$1{\beta}$, and iNOS; protein level of phospho-$I{\kappa}B{\alpha}$(which reflects the activation of NF-${\kappa}B$); and histology. As a result, RGE suppressed H. pylori-induced mRNA and protein levels of KC, IL-$1{\beta}$, and iNOS in gastric mucosa. RGE also inhibited H. pylori-induced phosphorylation of $I{\kappa}B{\alpha}$ and increases in LPO level and MPO activity of gastric mucosa. RGE did not affect viable H. pylori colonization in the stomach, but improved the histological grade of infiltration of poly-morphonuclear neutrophils, intestinal metaplasia, and hyperplasia. In conclusion, RGE inhibits H. pyloriinduced gastric inflammation by suppressing induction of inflammatory mediators (KC, IL-$1{\beta}$, iNOS), MPO activity, and LPO level in H. pylori-infected gastric mucosa.

A SIMULATION MODEL FOR DECIDING AN OPTIMIZED 3D SHAPE OF CONSTRUCTION WORKSPACE CONSIDERING RESOURCES IN BIM ENVIRONMENT

  • Hyoun Seok Moon;Hyeon Seung Kim;Leen Seok Kang;Byung Soo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.163-168
    • /
    • 2013
  • A construction workspace is considered as a critical factor to secure constructability and safety of a project. Specially, optimized size of each workspace helps to minimize any conflicts between workspaces, works and resources within a workspace in the construction site. However, since an existing method for making a decision workspace's size depends on generally experiences of managers and work conditions of activity, it is difficult to perform safe works considering feasible workspace size. The workspace size is changed according to the quantity of resources allocated into each activity as time progresses. Accordingly, it is desirable that optimized workspace size considering input size of resources is determined. To solve these issues, this study configures an optimized model for deciding standard size of workspaces by simple regression analysis and develops a visualized scenario model for simulating the optimized workspace shape in order to support BIM (Building Information Modeling) environment. For this, this study determines an optimized resource shape size considering maximum working radius of each resource and constructs its visual model. Subsequently, input size of resources for each activity is estimated considering safety execution area of resources and workspaces. Based on this, an optimized 3D workspace shape is generated as a VR simulation model of a BIM system based on the suggested methodologies. Moreover, operational feasibility of the developed system is evaluated through a case study for a bride project. Therefore, this study provides a visualized framework so that project managers can establish an efficient workspace planning in BIM environment. Besides, it is expected that constructability, productivity and safety of the project will be improved by minimizing conflicts between workspace and congestions between resources within a workspace in the construction phase.

  • PDF

A Modular Decomposition Model for Software Project Scheduling

  • Kim, Kiseog;Nag, Barin N.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.18 no.3
    • /
    • pp.129-149
    • /
    • 1993
  • The high level of activity in the development and maintenance of computer software makes the scheduling of software projects an importnat factor in reducing operating costs and increasing competitiveness. Software activity is labor intensive. Scheduling management of hours of software work is complicated by ther interdependencies between the segments of work, and the uncertainties of the work itself. This paper discusses issues of scheduling in software engineering management, and presents a modular decomposition model for software project scheduling, taking advantage of the facility for decomposition of a software project into relatively independent work segment modules. Modular decomposition makes it possible to treat scheduling as clustering and sequencing in the context of integer programming. A heuristic algorithm for the model is presented with some computational experiments.

  • PDF