• Title/Summary/Keyword: Project Activity

Search Result 852, Processing Time 0.03 seconds

A Design and Effect of Design Thinking-Based Team Project Learning in Nursing Clinical Practice (간호학 임상실습에서 디자인씽킹 기반 팀 프로젝트 학습 설계 및 적용효과)

  • Kang, Myung-Ju;Chung, Kyung-Hee;Cho, Jeong-Ah
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.3
    • /
    • pp.336-348
    • /
    • 2019
  • This study aimed to verify the effects of design thinking-based team project learning on nursing college students' empathy and proactivity of problem solving. This study also examined the subjects' experiences obtained from participating in team project activity through reflective analysis. The research was a one-group, pre-and-posttest design. The subjects were 64 seniors majoring in nursing studies in N university who had attended the course of nursing management practice. During the course, they participated in a design thinking team project for a total of 10 sessions for two weeks, five times per week, and one and a half hour per day. Data was analyzed using SPSS Win 22.0, a paired t-test was conducted and Pearson's correlation coefficients were calculated. Content analysis was carried out on their experiences obtained from participation in team project activity. The subjects' empathy(t=-2.94, p=.005) and proactivity of problem solving(t=-6.23, p<.001) showed statistically significant difference between before and after the design thinking-based team project learning and had significant positive correlation(r=.634, p<.001). Analysis of team reflection revealed four themes: design thinking, empathy, problem solving ability, and critical thinking. This study verified that design thinking-based team project learning was very effective in developing nursing college students' empathy and proactivity of problem solving. Research Results Design Thinking Based on team learning, project learning is an effective teaching learning method for finding and defining customer needs, creating a solution to problems, and enhancing engagement and empathy through various stakeholder collaborations I could.

Advanced Alignment-Based Scheduling with Varying Production Rates for Horizontal Construction Projects

  • Greg Duffy;Asregedew Woldesenbet;David Hyung Seok Jeong;Garold D. Oberlender
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.403-411
    • /
    • 2013
  • Horizontal construction projects such as oil and gas pipeline projects typically involve repetitive-work activities with the same crew and equipment from one end of the project to the other. Repetitive scheduling also known as linear scheduling is known to have superior schedule management capabilities specifically for such horizontal construction projects. This study discusses on expanding the capabilities of repetitive scheduling to account for the variance in production rates and visual representation by developing an automated alignment based linear scheduling program for applying temporal and spatial changes in production rates. The study outlines a framework to apply changes in productions rates when and where they will occur along the horizontal alignment of the project and illustrates the complexity of construction through the time-location chart through a new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR). The program uses empirically derived production rate equations with appropriate variables as an input at the appropriate time and location based on actual 750 mile natural gas liquids pipeline project starting in Wyoming and terminating in the center of Kansas. The study showed that the changes in production rates due to time and location resulted in a close approximation of the actual progress of work as compared to the planned progress and can be modeled for use in predicting future linear construction projects. LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. In addition, the graphical format lets the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.

  • PDF

A Heuristic Approach Solving for the Complex Design with Precedence Constraints in Concurrent Engineering (복합설계를 위한 동시공학적 접근방법)

  • Cho, Moon-Soo;Kim, Chang-Yeong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.2
    • /
    • pp.185-197
    • /
    • 1998
  • Engineering design involves the specification of many variables that define a product, how it is made, and how it behaves. Before some variables can be determined, other variables must first be known or assumed. This fact implies a precedence order of the variables, and of the tasks of determining these variable consequently. Moreover, design of complex systems may involve a large number of design activities. In this paper, the activity-activity incidence matrix is considered as a representation of design activity analysis which mainly focuses on the precedence constraint. In order to analyze the activity-activity incidence matrix, a heuristic algorithm is proposed, which transforms an activity-activity, parameter-formula, and parameter-parameter incidence matrix into a lower triangular form. The analysis of the structured matrices can not only significantly reduce the overall project complexity by reorganizing few critical tasks in practice, but also aims at obtaining shorter times considering the solution structure by exploring concurrency.

  • PDF

Participation Intention of Activity-oriented Program of Local Residents of Rural and Mountain Villages - Policy Implication for the Eco-Mountain Village Project - (농산촌체험마을 지역주민의 체험프로그램 참여의향 - 산촌생태마을사업을 위한 정책적 제언 -)

  • Lee, Duk-Jae;Kim, Jong-Ho;Jeon, Jun-Heon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.1
    • /
    • pp.1-11
    • /
    • 2008
  • Factors for promoting the resident participation in mountain villages are suggested to introduce the activity-oriented program of green tourism using a multinomial logit model(MNLM). Direct surveying, using a structured questionnaire was performed on local residents in the different types of rural tourism villages such as mountain villages, agricultural themed villages, and the mixed types of villages. The MNLM revealed that participation intention in the program was significantly higher for males, those with lower education, and residents in mountain villages. The participation intention of the program had a negative relationship with the increase of expected problems not from the program itself, but from the results of the program such as income distribution and nature destruction. Participation intention also increased with the indirect effects of an investment by the Village Development Project, such as local cooperativeness, public mind, etc. It was suggested that to introduce the activity-oriented program in mountain villages, negative effects from the results had to be minimized, and positive effects from the indirect changes between local residents had to be maximized through better communication and policy endeavors.

Synthesis and Antibacterial Activity of Novel 2-Oxo-pyrrolidinyl Oxazolidinones

  • Bhattarai, Deepak;Lee, Sun-Hee;Kim, Hyeong-Kyu;Kang, Soon-Bang;Pae, Ae-Nim;Kim, Eunice Eun-Kyeong;Oh, Taeg-Won;Cho, Sang-Nae;Keum, Gyo-Chang
    • Bulletin of the Korean Chemical Society
    • /
    • v.33 no.4
    • /
    • pp.1310-1316
    • /
    • 2012
  • Novel antibacterial oxazolidinones bearing pyrrolidinone ring system at the C-5 side chain were synthesized and their in vitro antibacterial activities were evaluated. Most of the synthesized oxazolidinones showed good antibacterial activity against the Gram-positive and Gram-negative bacteria tested.

A Case Study on the ODA for Creating Shared Value (CSV) in Agricultural Sector Based on the Value Chain Analysis - Project for Establishment of Seed-Potato Production System in Vietnam - (가치사슬분석법에 기초한 농업분야 공유가치창출(CSV) ODA 사례분석 - 베트남 씨감자 생산체계 구축사업 -)

  • Ji, Seong-Tae
    • Journal of Agricultural Extension & Community Development
    • /
    • v.25 no.1
    • /
    • pp.31-44
    • /
    • 2018
  • This is a case study on "the Project for Production Facility and Technical Support of Processed Seed-Potato (2008-2010)" based on the Value Chain Analysis (VCA) used to create and plan International development cooperation projects. The project is the earliest model of Creating Shared Value (CSV) in the agricultural sector. For the case analysis, a framework was established to assess the effectiveness and impact of the CSV project based on the main factors of the VCA. As a result of the assessment, project participation by OSI was able to increase the overall utility by developing the Vietnamese potato processing industry and meeting consumer demand. Furthermore, it formed a business model to promote win-win cooperation and upgraded the value chain of the potato industry. In addition, it contributed to the improvement of incomes and the quality of life of farmers and communities by providing technical guidance and purchase of contracts, as well as labor division and cooperation with other activity supporters.

On the Development of Reference Guidelines for Self-evaluation of Organization's Systems Engineering and Project Management Capability (조직의 SEPMC 자체 평가에 유용한 참조기준 개발)

  • Choi, Young Gil;Lee, Jae Chon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.2
    • /
    • pp.27-36
    • /
    • 2012
  • In modern systems, the operational capability of the system to the user needs is expanding rapidly to accommodate the size of the system, functionality, and interfaces are becoming increasingly complex. Accordingly, the systematic practice of project management and systems engineering in the system development process, as an important element in successful systems development is recognized. EIA/ANSI 632, ISO/IEC15288, the leading international standard for systems engineering and is the leading international standard on project management PMBOK. CMMI is also contains information about the activities of project management and systems engineering and worldwide basis to assess the maturity of an organization's ability to develop system being used. But CMMI model is too complex of structure and there are many overlap parts of contents. So there are many problems for members of organization understanding all of CMMI model, applying organization and, achieving improvement activity. In this study, through the analysis and integration between the model and the related standard coverage activities essential for successful systems development in organizations that require systems engineering and project management capabilities(SEPMC) for self-assessment and continuous improvement activities to provide useful reference guideline.

Exploring the effective management of the school complexes -Based on the cases of the elementary schools in Seoul Metropolitan- (학교 복합시설의 운영에 관한 연구 -서울특별시 초등학교 시설을 중심으로-)

  • Oh, Hai Jin;Lee, Jae Rim
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.8 no.2
    • /
    • pp.1-11
    • /
    • 2009
  • The school complex project is driven by public calling for school facilities change due to the social change followed by the aging society and increasing interest in the lifelong education. The school complex project is defined as an activity in which the school facilities and space are not only used for students, but also for the local residents. Since the project was promoted in a link with reform of the education system in 2001, the demand in the expectation effect has been sharply increasing. Despite of the high expectation and attention, the school complex project, however, has been performed in a limit of efficiency. Consequently, public opinion calling for more structured and effective way on construction and administration has been certainly increasing. According to the strong demand, this study was carried out to provide basic data for, and suggest an approach to, more structured and effective way of establishment and administration of the school complex project by comparing the success cases in Seoul metropolitan city.

  • PDF

Analysis of the Work and Cost of Supervisor in the Public Construction Corporation (공공발주처의 공사감독 업무영역과 비용 분석)

  • Cho Seong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.146-152
    • /
    • 2003
  • In the construction project, construction supervisor influences greatly the construction managements such as process management, quality management, safety management, and cost management. Therefore, from the first stage of the project, the managing activities of the supervisor are consistently needed. But the assesment of supervisor's work and cost has not been made enough in the public construction project. And there have been doubts as to whether a supervisor can take a consistent managing activity from the early stage of the project. Accordingly, the works between Korean supervisor and foreign supervisor in their public corporations are analyzed and compared in this paper. And the evaluation is made each of the cost for supervisor and the cost for engineer as a substitute of supervisor in construction project. This study is believed to contribute to improving the supervisor's work and reducing the personnel expenses and construction indirect cost.

A Dual-Population Memetic Algorithm for Minimizing Total Cost of Multi-Mode Resource-Constrained Project Scheduling

  • Chen, Zhi-Jie;Chyu, Chiuh-Cheng
    • Industrial Engineering and Management Systems
    • /
    • v.9 no.2
    • /
    • pp.70-79
    • /
    • 2010
  • Makespan and cost minimization are two important factors in project investment. This paper considers a multi-mode resource-constrained project scheduling problem with the objective of minimizing costs, subject to a deadline constraint. A number of studies have focused on minimizing makespan or resource availability cost with a specified deadline. This problem assumes a fixed cost for the availability of each renewable resource per period, and the project cost to be minimized is the sum of the variable cost associated with the execution mode of each activity. The presented memetic algorithm (MA) consists of three features: (1) a truncated branch and bound heuristic that serves as effective preprocessing in forming the initial population; (2) a strategy that maintains two populations, which respectively store deadline-feasible and infeasible solutions, enabling the MA to explore quality solutions in a broader resource-feasible space; (3) a repair-and-improvement local search scheme that refines each offspring and updates the two populations. The MA is tested via ProGen generated instances with problem sizes of 18, 20, and 30. The experimental results indicate that the MA performs exceptionally well in both effectiveness and efficiency using the optimal solutions or the current best solutions for the comparison standard.