• 제목/요약/키워드: Profit cost

검색결과 771건 처리시간 0.03초

Cost and Profit Efficiency of Banks: Stochastic Frontier Analysis vs Data Envelopment Analysis

  • Baten, Md. Azizul;Kasim, Maznah Mat;Rahman, Md. Mafizur
    • 아태비즈니스연구
    • /
    • 제6권2호
    • /
    • pp.1-17
    • /
    • 2015
  • This study compares the most widely used parametric and non-parametric techniques to measure cost and profit efficiency of banks, namely the Stochastic Frontier Analysis (SFA) and Data Envelopment Analysis (DEA). We formulate the specification form of both stochastic cost and profit frontier models and constant return to scale Cost DEA and Profit DEA models and provide an empirical assessment of the cost and profit frontiers based on a panel dataset of National Commercial Banks (NCBs) and Private Banks (PBs) in Bangladesh over the 2001-2010 period. The cost inefficiency and profit efficiency are slightly higher for PBs than NCBs in case of both SFA and DEA. The coefficients of advance and off-balance sheet items are significant that positively influence the banks in stochastic cost frontier model while the advance, other earning assets, price of borrowed fund are significant and negative effects on the banks in stochastic profit frontier model. The average cost inefficiency and average profit efficiency are recorded with 16.3% and 91% respectively. The highest and lowest cost inefficiency are observed for Janata Bank and United Commercial Bank Limited whilst the highest and lowest profit efficiency are recorded for Eastern Bank Limited and Janata Bank respectively. The average technical and allocative efficiency are 68.8% and 35.9%, respectively in case of CRS cost-DEA model whereas they are 70.3% and 31.8% in case of CRS profit-DEA model. The average cost inefficiency is recorded 6.3% by SFA whereas it is 24.5% by DEA. The average profit efficiency is found 91% by SFA while it is 22.1% by DEA, and SFA method shows better bank efficiency than DEA.

  • PDF

Optional Tariffs for Channel Coordination

  • Song, Jae-Do
    • Asia Marketing Journal
    • /
    • 제14권3호
    • /
    • pp.49-68
    • /
    • 2012
  • When a channel is vertically separated, there can be inefficiencies, double marginalization. Channel coordination to amend this inefficiency has been an important issue in marketing and economics. Channel coordination deals with maximization of joint profit and achieving proper profit sharing among participants. In this paper, a manufacturer and heterogeneous multiple retailers with exclusive territory are assumed, and channel coordination with two-part tariff is considered. When multiple heterogeneous retailers are assumed, profit sharing can be an issue even though the tariffs based on marginal cost can maximize joint profit. In case of multiple heterogeneous retailers, the manufacturer earns the same profit (fixed fee) from each retailer. This means that a large retailer occupies all the gaps of channel profit between small and large markets. Then, the manufacturer, which generally plays the role of Stackelberg leader, will consider increasing fixed price or marginal price to earn more profit from large retailer. Those reactions can sacrifice maximization of joint profit by making small retailer withdraw or by changing the sales quantities. In this paper, to maximize joint profit and achieve proper profit sharing, two kinds of optional tariffs are considered. The first is an optional two-part tariff based on marginal cost and the second is an optional modified two-part tariff in which marginal prices are higher than the manufacturer's marginal cost. In both types of optional tariffs, maximization of joint profit in each market can be achieved. Moreover, optional tariffs alleviate the problem of profit sharing. Optional tariffs can provide a manufacturer more profit from a large retailer when profit from a small retailer is given. However, the analysis shows that the maximum share of manufacturer from a large retailer is restricted by the condition for self-selection. In case of optional two-part tariffs based on marginal cost, if the gap between demands is large, the maximum share of the manufacturer is sufficient to achieve proper profit sharing. If the gap between demands is not sufficiently large, the manufacturer cannot earn sufficient share from increased profit. An optional modified two-part tariff where marginal price is more than marginal cost of manufacturer is considered because of this scenario. The marginal price above the marginal cost may additionally control the distribution of the increased profit. However, the analysis shows that a manufacturer's maximum profit from a large retailer with given profit from a small retailer is the same as or lower than the maximum profit when optional two-part tariffs based on marginal cost are applied. Therefore, it can be concluded that the optional modified tariffs do not have additional contribution to profit sharing relative to the tariffs based on marginal cost. Although this paper does not cover all kinds of optional tariffs that are different from tariffs based on marginal cost, it shows the advantage of optional tariffs based on marginal cost and has important theoretical implications. The result of this paper also gives guide for channel coordination. Optional two-part tariff based on marginal cost can increase efficiency in channel coordination.

  • PDF

Evaluation of Information Technology Impact on State-owned Commercial Banks' Efficiency: The Case of Bangladesh

  • BEGUM, Shakera;BATEN, Md. Azizul;ALI, Rahmat
    • Asian Journal of Business Environment
    • /
    • 제12권1호
    • /
    • pp.1-9
    • /
    • 2022
  • Purpose: This study measures the effect of Information Technology (IT) on both cost and profit efficiency of State-owned Commercial Banks (SOCBs) in Bangladesh. Research design, data and methodology: Yearly Non-IT and IT data are collected from the annual report of SOCBs of Bangladesh from 2008 to 2017. Variable Return to Scale (VRS) cost Data Envelopment Analysis (DEA) and Profit DEA are employed to measure the efficiency of SOCBs and Ordinary Least Square (OLS) is used to investigate the impacts of ICT components on operating cost and profit efficiency for SOCBs. Results: The average cost efficiency (74.4%) was noticed higher than the average profit efficiency (20.6%) for SOCBs. SOCBs were more affordable and less profitable for both cost and profit efficiency. Rupali bank was the most cost efficient while Sonali bank was the most profit efficient. IT Investment and IT personnel expenses were positively significant for cost efficiency. IT income, IT personnel, IT personnel expenses, ATM expenses, and Credit card expenses were negatively significant for profit efficiency. Conclusion: The further studies can combine DEA with machine learning algorithms to study the impact of IT on banks' performances. The results could aid government to remove the hindrance of progress in Bangladesh.

Aumann-Sharpley 가격에 의한 공통 제조원가의 배분 - 상대적 이익 기여도를 중심으로- (An Application of the Aumann-Sharpley Prices for Joint Cost Allocation through Book Profit)

  • 이경근
    • 산업공학
    • /
    • 제2권2호
    • /
    • pp.25-32
    • /
    • 1989
  • We study the joint cost allocation based on the book profit producing power of the output through the A-S price mechanism. We show what part of the A-S book profit is allocated to the joint cost and what part is allocated to the variable total book profit of the short-run book profit function. Also we compare some other classical joint cost allocation methods with this A-S price method.

  • PDF

실적공사비에서 전기공사의 적정이윤율 분석에 관한 연구 (A Profit Calculating Analysis and a Proposal of Estimation System of Historical Cost Data in the Electrical Construction Works)

  • 서순석;장영길;김광곤;현소영;왕용필;안준호;박민영;손홍관
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.2129_2131
    • /
    • 2009
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. It is expected that the purpose of the introduction would be evaluated considering the long-term development of domestic construction industry. In article 3, paragraph 4 of the planning criteria of estimated cost of financial regulation related to government contract rule, the profit estimated by historical cost data indicates sales profit and it is calculated by multiplying the sum of direct cost, indirect cost and general overhead by rate of profit. Finally, it is said that rate of profit cannot exceeds 10%. However, there are a lot of constructions for electronic equipment in the electronic construction and the proportion of government furnished material is very high, not like engineering works or constructions. Therefore, as the proportion of material cost over direct cost is relatively lower, if current rate of profit (10%) is applied, there would be a wide difference of cost in the items of profit under the estimation system of historical cost data. This paper was conducted to examine estimation methods of the items of profit under the estimation system of historical cost data and suggest reasonable applications.

  • PDF

전기분야 실적공사비 적산제도에서 이윤산정 분석 및 제안 (A Profit Calculating Analysis and a Proposal of Estimation System of Historical Cost Data in the Electrical Construction Works)

  • 서순석;임승학;권용만;김광곤;김재현;손홍관;박인표
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.155-159
    • /
    • 2007
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. It is expected that the purpose of the introduction would be evaluated considering the long-term development of domestic construction industry. In article 3, paragraph 4 of the planning criteria of estimated cost of financial regulation related to government contract rule, the profit estimated by historical cost data indicates sales profit and it is calculated by multiplying the sum of direct cost, indirect cost and general overhead by rate of profit. Finally, it is said that rate of profit cannot exceeds 10%. However, there are a lot of constructions for electronic equipment in the electronic construction and the proportion of government furnished material is very high, not like engineering works or constructions. Therefore, as the proportion of material cost over direct cost is relatively lower if current rate of exceeds (10%) is applied, there would be a wide difference of cost in the items of profit under the estimation system of historical cost data. This paper was conducted to examine estimation methods of the items of profit under the estimation system of historical cost data and suggest reasonable applications.

  • PDF

3차 비용함수에 의한 이익곡선 도출과 산업 라이프사이클의 수리적 검증: 우리나라 전 산업을 중심으로 (Derivation of Profit Curve by Cubic Cost Function and Mathematical Verification of Industry Life Cycle: Focused on All Industries in Korea)

  • 배후석;임채관
    • 품질경영학회지
    • /
    • 제51권4호
    • /
    • pp.481-496
    • /
    • 2023
  • Purpose: The main theme of this study is to derive a profit curve by a cubic cost function for nonlinear CVP analysis. According to the analytical approach to derive a nonlinear profit function in this study, it is possible with only the existing cost structure to calculate the profit maximization and downtime point sales unlike the classical CVP analysis. Furthermore, the profit curve by the mathematical model of this study could serve as a tool to quantify the qualitative evaluation of each stage of the industry life cycle. Methods: This study followed the mathematical approach from the cubic cost function model of microeconomics, and using real data of the Bank of Korea Results: The nonlinear profit function suggested by this study is as follows; ${\pi}(x)=-a\left(x-\frac{f}{1-v}\right)^3+(1-v)x-k$ where $a=\frac{1}{3}v\left(\frac{(1-v)}{f}\right)^2,k=f-a\left(1-\frac{f}{1-v \right)^3$ Conclusion: The process and results of this study would be able to contribute not only in practice of nonlinear CVP analysis required in the management accounting or financial management, but also in cost theory of microeconomics. Also, since the life cycle of all industries in Korea was verified to the growth or mature stage, decision makers should pay careful attention to determining life cycle stages and consider the profit curve by the average variable cost ratio over multi periods.

열병합 발전기 수익 극대화를 위한 열전비 최적화 (Heat-Electric Power Ratio Optimization To Maximize Profit of a Cogeneration Power Plant)

  • 김군회;이재헌;문승재;장택순
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2008년도 춘계학술대회논문집
    • /
    • pp.381-384
    • /
    • 2008
  • This paper presents an operational technique to maximize profit of a cogeneration power plant. To minimize errors in a loss and gain analysis of a cogeneration power plant, the energy sale profit in the cost-based-pool electric power trade market, the heat sale profit, and the supplementary fund profit for electric power industry are taken into consideration. The objective is to optimize the heat-electric power ratio to maximize profit of a cogeneration power plant. Furthermore, the constrained bidding technique to optimize heat-electric power ratiocan be obtained. Profits from of a cogeneration power plant are composed of three categories, such as the energy sale profit in the cost-based-pool electric power trade market, the heat sale profit, and the supplementary fund profit for electric power industry. Profits of a cogeneration power plant are varied enormously by the operation modes. The profits are mainly determined by the amount of constrained heat generation in each trading time. And the three profit categories arecoupled tightly via the heat-electric power ratio. The result of this case study can be used as a reference to a cogeneration power plant under the power trading system considered in this case.

  • PDF

열병합 발전소의 운전경제성 분석에 관한 연구 (Analysis of Operational Economic Efficiency in a Cogeneration Power Plant)

  • 김군회;허진혁;문승재;이재헌
    • 플랜트 저널
    • /
    • 제5권1호
    • /
    • pp.40-44
    • /
    • 2009
  • This study presents an operational technique to maximize the profit of a cogeneration power plant under cost-based pool power market. In benefit side energy sale profit, heat sale profit, and supplementary fund profit for electric power industry are included and the changeable cost was considered in cost side. The profit of a cogeneration power plant is varied enormously by the operation conditions, and constraint conditions. The result of this case study can be used as a reference to a cogeneration power plant under the same power trading system.

  • PDF

일반건설업의 직접시공과 하도급시공의 공사원가 및 수익성 비교분석 (The Analysis about Construction Costs and Profitability of Direction between Subcontracting Construction in General Construction Industry)

  • 황욱선;이현숙
    • 산학경영연구
    • /
    • 제19권1호
    • /
    • pp.25-34
    • /
    • 2006
  • 직접시공이나 하도급시공은 건설산업기본법에 의해 정한 시행령에 따라 시공하는 것이 원칙이나 직접시공이나 하도급시공시 수익성을 비교하여 이익 창출을 극대화하는 방향으로 의사결정이 된다. 이 연구에서는 민간공사 사례를 바탕으로 직접시공과 하도급시공의 공사원가와 수익성을 비교분석하였다. 자료 수집은 S건설에서 2002년과 2003년에 공사한 근린생활 및 단독주택을 토대로 하였다. 공사건수의 사례는 직접시공과 하도급시공 각각 3건의 공사에 의한 평균비율 값에 의하여 비교분석하였다. 이 연구의 사례를 분석한 결과, 공급가액 대비 매출총이익에 대한 수익률은 하도급시공이 직접시공 보다 1.3% 높은 수익률을 올린 것으로 분석되었다. 영업이익에 대한 수익률은 하도급시공이 직접시공보다 2.3% 높은 수익률을 올린 것으로 분석되었다. 마지막으로 하도급시공(영업이익률 11.7%)이 직접시공 공사에 대해 4대 보험료 차감후의 최종 영업 이익률이 4.4% 더 많이 발생한 것으로 분석되었다. 그러므로 건설회사는 하도급을 주는 것이 수익률이 높다는 것을 알 수 있고, 노무자 관리 또한 용이한 것으로 나타났다.

  • PDF