• Title/Summary/Keyword: Productivity management

Search Result 2,530, Processing Time 0.033 seconds

A study on the trouble and the counter-measure of higher productivity enforcement (생산성향상(生産性向上) 실시상(実施上)의 장애(障碍)와 대책(對策)에 관(關)한 연구(硏究)(품질(品質), 원가(原?), 납기(納期)의 경제적(經濟的) 균형(均衡)을 전제(前題)로))

  • Sin, Yong-Baek
    • Journal of Korean Society for Quality Management
    • /
    • v.8 no.1
    • /
    • pp.16-24
    • /
    • 1980
  • A movement for higher productivity is very important of the basis for industry society prosperity. Contineous productivity improvement have a right understanding of a conception of productivity and its effect that are removed an act before the trouble of higher productivity enforcement. It is that the theoretical principle of productivity improvement are harmonized of the stage of application, actual problems and considered a special characteristic of the enterprise in industry for contineous productivity improvement. A movement for higher productivity is used by way of a welfare society.

  • PDF

Influence Factors Analysis on the Productivity of Management Manpower (건축현장 관리인력의 생산성 영향요인 조사 연구)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Sohn, Hyo-Won;Kim, Sun-Hyung;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.153-157
    • /
    • 2010
  • As the recent economic downturn continues to undermine the profits of construction industry in Korea, it has become ever more pressing to improve productivity of the industry. Since construction site management manpower staffing plan has close bearing on the productivity of construction projects, it is essential to estimate and mobilize adequate number of resources as per conditions and characteristics of each construction site. However, there are no reference approaches in practice to provide baseline for site management manpower staffing plan or estimation of manpower requirement. Therefore, this study aims to examine factors affecting productivity that warrants first and foremost consideration in development of site management manpower staffing plan during the initial phase of building construction project by conducting survey on industry stakehoders with hands-on responsibilities in construction sites and analyzing their responses. Conclusions herein will provide basic inputs for subsequent studies on development of site management manpower staffing plan as per project characteristics.

  • PDF

A Productivity Analysis for Management Manpower of Building Construction Projects (건축공사의 현장관리 인력에 대한 생산성 분석)

  • Lee, Hyun-Min;Lee, Dong-Hoon;ZHENG, QI;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.10 no.1
    • /
    • pp.45-55
    • /
    • 2010
  • While Korean construction companies are adapting themselves to rapidly changing business landscape at home and abroad, intensifying competition among competitors in local as well as global market deteriorates the profitability of construction industry, which leads to another problem. In response to such challenges, many construction companies continue to innovate their business portfolio and organization structure, with strong commitment to business process innovation. Furthermore, they need to analyze the productivity of project site management manpower overhauling business processes systematically and develop effective alternative strategies. This research aims to analyze the productivity of project site management manpower. Current operational practices of construction site organizations have been analyzed with focus on large construction companies in Korea and data gathered from project sites have been analyzed from a wide range of perspectives, In so doing, this research is expected to provide basic inputs for any subsequent attempt to estimate proper resource requirement for site management tasks in construction projects and analyze the management productivity of such resources by enabling construction companies to better understand the current operational status of site organization.

The Quality Management Strategy Using Brain Science for Productivity Improvement (생산성 향상을 위한 두뇌과학적 품질경영 전략)

  • 윤상원
    • Journal of the Korean Professional Engineers Association
    • /
    • v.32 no.6
    • /
    • pp.44-47
    • /
    • 1999
  • This study deals with the quality strategy using brain science as the tool of productivity improvement. Especially, it is critically analyzed that the application of the brain theory to the new deployment methodology of quality management corresponds to the industrial improvement properly in points of performing quality and productivity, and contributing the growth of our society etc.

  • PDF

The Development of Productivity Prediction Model for Interior Finishes of Apartment using Deep Learning Techniques (Deep Learning 기반 공동주택 마감공사 단위작업별 생산성 예측모델 개발 - 내장공사를 중심으로 -)

  • Lee, Giryun;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.3-12
    • /
    • 2019
  • Despite the importance and function of productivity information, in the Korean construction industry, the method of collecting and analyzing productivity data has not been organized. Also, in most cases, productivity management is reliant on the experience and intuitions of field managers, and productivity data are rarely being utilized in planning and management. Accordingly, this study intends to develop a prediction model for interior finishes of apartment using deep learning techniques, so as to provide a foundation for analyzing the productivity impacting factors and predicting productivity. The result of the study, productivity prediction model for interior finishes of apartment using deep learning techniques, can be a basic module of apartment project management system by applying deep learning to reliable productivity data and developing as data is accumulated in the future. It can also be used in project engineering processes such as estimating work, calculating work days for process planning, and calculating input labor based on productivity data from similar projects in the past. Further, when productivity diverging from predicted productivity is discovered during construction, it is expected that it will be possible to analyze the cause(s) thereof and implement prompt response and preventive measures.

A Study of Performance Analysis for the Productivity Innovation Partnership Program (대·중소기업 생산성 혁신 파트너십 사업 성과분석 연구)

  • Kim, JaeGon;Kim, ByungSoo;Kim, ChongMan
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.3
    • /
    • pp.269-278
    • /
    • 2014
  • Purpose: The purpose of this study was to analyze the results of the productivity innovation partnership program and propose the method for improvement. We investigated 90 companies which are sub-contractors of Samsung Electronics, LG electronics, POSCO and so on. Methods: We developed and carried out a survey and analyzed the results of the program. The interviews are also performed. Results: This study shows that the partnership program is a effective method for improving quality and productivity of sub-contractors and it is necessary to extend coverage of this program. Conclusion: We suggested some improvement points of the partnership program and they are to be applied in the next year. The results show that the suggestion is helpful and valuable.

The Linkage Strategies Between Productivity Metrics and Financial Accounting Metrics in TPM and PAC Activities (TPM, PAC 활동에서 생산성지표와 재무회계 지표의 연계방안 전략)

  • Choi, Sungwoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.3
    • /
    • pp.151-161
    • /
    • 2013
  • This paper proposes a strategic model of linkage between productivity metrics and financial accounting metrics to properly evaluate the financial effect of TPM activities and the business performance. This linkage strategy provides a connection tool for clear communication between factory-level and headquarters that the metrics proposed by this paper ultimately improves a quality of support from the management by receiving the factors required for productivity activities in the practical field. This factor includes such as equipment, raw materials and labors. Here, we propose that chain reaction models using break down structure of productivity metrics and financial metrics enhance the knowledge sharing of KPI (Key Performance Indicator) which generally tend to create oversimplified communication between management in headquarters and employees in the practical fields. The productivity metrics include OEE(Overall Equipment Effectiveness) of TPM (Total Productive Maintenance), OLE (Overall Labor Effectiveness) of PAC(Performance and Analysis and Control) activities, and OYE (Overall Yield Effectiveness) of TMM(Total Material Management) activities. The financial accounting metrics include ROE(Return on Equity), ROA(Return on Asset), and AVR(Added-Value Rate). The suggested chain reaction model selects the financial metrics as initial stage and branch down until final stage of productivity metrics. When demand exceeds supply, an ideal speed rate, the lean OEE strategy can be initially applied to reduce the gap between the demand and supply, then apply variable costing to estimate correct amount of operating profit. In addition, the paper presents a new type of model for linkage between financial accounting metrics including CAPEX(Capital Expenditure), OPEX(Operating Expenditure), EVA(Economic Added Value), DCL(Degree of Combined Leverage), and TPM productivity activities including AM(Autonomous Maintenance), PM(Preventive Maintenance), MP(Maintenance Prevention) and QM(Quality Maintenance). In order to support the evidence of proposed linkage strategy, a case analysis on 52 projects from national TPM contest from 2011 to 2012 is analyzed. The case presents the classification of CAPEX and OPEX activities from TPM, and proposes the correct implementation of financial effect for TPM projects.

A Study on the Productivity Increment through Construction of HT8 Management System for Automobile Plant in China (중국 자동차 공장의 HT8 관리체계 구축을 통한 생산성 향상에 관한 연구)

  • Lee, Doo-Yong;Jang, Jung-Hwan;Yoo, Sung-Hee;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.1
    • /
    • pp.123-128
    • /
    • 2012
  • This paper deals with the productivity increment through construction of HT8 production system for automobile factory in China. HT8 production system start to build up several management indices. The important management indices consists of organization management, location management, management of order, management of defective item, management of delivery information, and warehouse management. This HT8 production system is expected to obtain the improvement for overall organization management and reduction by 50% in warehouse cost.

A Study on Management Responsibility about Factors that Influence the Productivity on Site - based on the Goneralcontractor's Questionnaire - (생산성을 저해하는 요소들에 대한 관리 책임에 관한 연구 - 원도급자 설문을 중심으로 -)

  • Chung Hee-Suk;Lee Tae-Sik;Park Jong-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.350-354
    • /
    • 2002
  • The industrial society today becomes competitive industry of high-development and advance. The notion of the productivity improvement in most of the industries becomes much more important in this situation. Furthermore, improvement in the productivity is the main pursuit of all industries, in order to overcome the recent economical crisis in korea and to strengthen our competitiveness in international industry. Therefore, the improvement of productivity becomes more crucial especially for the recent difficulties of domestic construction industry. From such a perspective, this study has three main objectives Identify positive and negative factors which affect construction productivity based on the analysis of questionnaires distributed to subcontractors.

  • PDF

Analysis on Efficiency and Productivity Changes of Regional Public Hospitals in Korea with Data Envelopment Analysis/Window and Global Malmquist Indices Models (Data Envelopment Analysis/Window 모형과 Global Malmquist 생산성지수 모형을 이용한 지방의료원의 효율성과 생산성 변화 분석)

  • Yang, Dong Hyun
    • Health Policy and Management
    • /
    • v.23 no.1
    • /
    • pp.78-89
    • /
    • 2013
  • This study empirically analyze efficiency and productivity changes of public hospitals of Korea using data envelopment analysis/Window model and global Malmquist indices model. We use the ten-year data from 2001 to 2010 of 30 regional public hospitals listed database from the Association of Korean Regional Public Hospitals. The main focuses are to reveal whether the technical inefficiency are improved as time goes by, and efficiency and productivity are affected by environmental factors. The results can be summarized as follows. First, the efficiencies of public hospitals rise in trend as time passes. Second, regional public hospitals show the different average efficiencies according to their regional type, hospital type, operational type, medicaid type, and demand and supply conditions by Mann-Whitney U-tests. Third, technical efficiency changes mainly contribute to 4.4% annual average growth rate of productivity of regional public hospitals during that period. Our findings have some policy implications. It is confirmed that there exist some environmental inefficiencies, and those inefficiencies can not be overcome through just improving the inner management system. Thus, policy and institutional changes are necessary for regional public hospitals to improve efficiency and productivity overall.