• Title/Summary/Keyword: Productivity management

Search Result 2,540, Processing Time 0.038 seconds

A Structural Analysis of the Factors Affecting Productivity Performance: Based on SME of Manufacturing Certified the PMS (중소기업의 생산성 성과 요인에 관한 구조적 분석: 생산성경영시스템(PMS) 인증 제조업을 중심으로)

  • Seo, Chang Soo;An, Oak Hyeon
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.2
    • /
    • pp.295-314
    • /
    • 2019
  • Purpose: This study aims to investigate the factors affecting productivity performance for Korean SMEs of manufacturing which had obtained the certification of Productivity Management System(PMS) that is a Korean assessment program for enhancing maturity of company's management systems. Methods: The proposed model is based on the PMS model. The valid 759 data registered from 2010 to 2018 year was analyzed using SEM analysis for testing hypotheses. Results: The results are as follows. First, Leadership affects the five core sub-system processes positively, but doesn't a significant Business Performance directly. Secondly, HRM, Customer & Market Analysis, and Process Management excluding Productivity Development and Measurement Analysis and Knowledge Management have a significant effect on Business Performance. Lastly, when examining the mediation effect, Process Development, Customer & Market Analysis, and HRM have indirectly effect between Leadership and Business Performance. Conclusion: This study results suggest not only the role of leadership to improve productivity performance of SME, but also which core processes are focused and differentiated.

Relationship between DEA Efficiency of Costs-Patient Revenues, Productivity per Value Added, and Management Performance in Mental Hospitals (정신병원의 비용투입 대비 의료수익산출 DEA 효율성, 부가가치생산성, 경영성과 간의 관계)

  • Jung, Yong-Mo;Ha, Au-Hyun
    • The Korean Journal of Health Service Management
    • /
    • v.9 no.3
    • /
    • pp.57-67
    • /
    • 2015
  • Objectives : This study has analyzed the relationship between DEA efficiency of costs-patient revenues, productivity per value added and management performance in mental hospitals. Methods : The relationship between DEA efficiency of costs-patient revenues, the productivity per value added and management performance were conducted with correlation analysis and logistic regression. Results : The DEA efficiency of costs-patient revenues had a significant causal relationship with the value added ratio to gross revenue indexing productivity per value added. On the other hand, it was revealed that the operating margin indexing management performance had a slightly significant causal relation with DEA efficiency of costs-patient revenues. Conclusions : The material costs should be focused on the management stability of mental hospitals, and known to the desirable management orientation for the higher efficiency of costs-patient revenues.

A Study on the Productivity Measurement and Effect Factors of Management Evaluation in Public Firms with a Focus on the Port Authorities

  • Eom, Ki-Yong;Ahn, Ki-Myung
    • Journal of Navigation and Port Research
    • /
    • v.44 no.5
    • /
    • pp.400-406
    • /
    • 2020
  • In this study, we first measured the malmquist productivity index by DEA among the Korean public firms. Second, there are 12 public corporations whose productivity (MPI) has decreased compared to 2014. This is mainly because of a decrease in productivity, as well as a decrease in the technical efficiency change index (TECI), impacted by the internal environment, and the increase in productivity because of an increase in the technology change index (TCI) impacted by the external environment. Finally, the analysis of the impact on the management assessment scores showed that the productivity (MPI), scale efficiency (CRS), size of sales, operating profitability, and total capital investment efficiency are significantly related (+), except for the asset turnover, which is a static financial ratio. Meanwhile, the management evaluation scores between the high-productivity public corporations and low-performing public corporations were significantly discriminating. Thus, it is confirmed that the nation's state-run companies must manage their MPIs in a time series to score high in management evaluation.

Construction Projects Productivity in West African country of Benin: Case of Ground Earthworks

  • Akogbe, Romuald Kokou;Feng, Xin;Zhou, Jing
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.16-23
    • /
    • 2015
  • In this paper, a survey related to excavation construction activities among national and international construction companies was conducted to evaluate site productivity in construction industry. To analyze the respective productivity levels of each construction company, a benchmarking measures analysis that featured calculations of the performance ratio (PR) and performance management index (PMI) was performed. As a result of these analyses, it has been found that the work performed by local companies was marked by lower productivity and that of international companies was characterized by good productivity. Further analysis of construction workforce resources P% revealed that a construction company's productivity is largely dependent on production capacity and consumption resources, which means that the retention of skilled workers and utilization of high-quality resources yields the highest level of productivity. These results suggest that for a local construction company to be competitive in the construction work market, it must retrain skilled craftspeople, foremen, engineers, and project managers, and strengthen its building capability by leveraging new equipment and technologies.

종합생산성모델(TPM)을 사용한 생산성 측정

  • 박광태;김민철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1997.10a
    • /
    • pp.197-200
    • /
    • 1997
  • Each company is more interested in the productivity to achieve cost reduction and profit maximization through productivity improvement. With this trend, we show the method to measure productivity using TPM(Total Productivity Model) which considers all the input factors of the company instead of using partial productivity such as labor and/or capital productivity We also examine the relation of productivity versus output, profit versus output and profit versus productivity of the case company by actually applying the TPM and suggest the optimal level of profit and output for this company.

  • PDF

Effects of Technology and Innovation Management and Total Factor Productivity on the Economic Growth of China

  • LEE, Jung Wan;XUAN, Ye
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.6 no.2
    • /
    • pp.63-73
    • /
    • 2019
  • The paper aims to investigate relationships between technology and innovation management, total factor productivity and economic growth in China. By comparing the trends in total factor productivity growth of industrialized economies (i.e. OECD), this study intends to showcase the importance of total factor productivity progress in the Chinese economy. The study employs time series data of an annual basis for the period from 1977 to 2016 retrieved from the World Development Indicator. The study employs unit root test, cointegration test, fully modified least squares estimation method, canonical cointegrating regression and dynamic least squares estimation method to test the hypotheses. The results of the cointegrating regression analysis show that manufacturing growth leads to an increase of total factor productivity in the short-run in China. The findings of the study suggest that manufacturing (i.e. technology and product innovation) is positively related to the increase of total factor productivity in the short-run and total output growth in the long-run. The findings suggest that promoting technology and innovation management and supporting R&D subsidies may reduce the marginal cost of conducting R&D and increase the rate of technology and innovation management and R&D activity and therefore, the total factor productivity growth rate.

EVALUATING PRODUCTIVITY-AFFECTING FACTORS ON FINISHING WORKS IN HIGH-RISE HOUSING CONSTRUCTION

  • Chi-Joo Lee;Jae-Jun Kim;In-Suk Park;Sang-Hyo Lee;Yoon-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.398-406
    • /
    • 2007
  • Constructing high buildings is a global trend, and skyscrapers for residing are also increasing. But a period of works for finish construction is different depending on a company while a period of works for frame construction of skyscrapers for residing in the country is regular when considering a difference of a method of construction, and the increase of repeated construction for high buildings and number of related process for finish construction are stressing the importance of improving productivity through construction management and plan for works. Because there are many compositive factors affecting productivity other than technical factors, we should intensively study the way of improvement and prevention preferentially through analyzing factors affecting productivity. So in this study, we present important management factors for making systematic strategy and plan for improvement of productivity by finding factors affecting productivity depending on the degree of importance unifying factors affecting productivity of plan factor(internal factor of construction process) and management factor(outer factor of construction process).

  • PDF

A Case Study on Assessing the Productivity of a BIM team in a Construction Company

  • Huang, Chien-Hsun;Hsieh, Shang-Hsien
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.259-262
    • /
    • 2015
  • Due to the labor-intensiveness, high investment cost, long execution time, frequent change orders, and many stakeholders in a BIM project, a BIM manager is bound to face a lot of risks to make decisions in cost managing process. Since the productivity of a BIM team will affect the execution cost, this study investigates a simple method of assessing the productivity of a BIM team using the working timesheet records of the team. In this research, the productivity of a BIM team is defined as the effective working floor area (in square meters) of BIM uses per labor-time (in man-months) spent by the team. After the applicability of this method is tested by regression analysis using data from 5 real BIM projects in the construction phase, it is found that the simple productivity definition adopted in the method, although easy-to-implement, does not produce a statistically constant productivity value. More research is therefore needed in the future to devise better indicator(s) for assessing the productivity of a BIM team.

  • PDF

The Development of Probabilistic Time and Cost Data: Focus on field conditions and labor productivity

  • Hyun, Chang-Taek;Hong, Tae-Hoon;Ji, Soung-Min;Yu, Jun-Hyeok;An, Soo-Bae
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.1
    • /
    • pp.37-43
    • /
    • 2011
  • Labor productivity is a significant factor associated with controlling time, cost, and quality. Many researchers have developed models to define methods of measuring the relationship between productivity and various parameters such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only entails the average productivity data of the construction industry, and it is difficult to predict the time and cost spent on any particular project. As a result, errors occur in estimating duration and cost for individual activities or projects. To address these issues, this research sought to collect data, measure productivity, and develop time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites. It is possible that the result will be used as the EVMS baseline of cost management and schedule management.

PROBABILISTIC MODEL-BASED APPROACH FOR TIME AND COST DATA : REGARDING FIELD CONDITIONS AND LABOR PRODUCTIVITY

  • ChangTaek Hyun;TaeHoon Hong;SoungMin Ji;JunHyeok Yu;SooBae An
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.256-261
    • /
    • 2011
  • Labor productivity is a significant factor related to control time, cost, and quality. Many researchers have developed models to define method of measuring the relationship between productivity and various constraints such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only contains the average productivity data of the construction industry, and it is difficult to predict the time and cost of any particular project; hence, there are some errors in estimating duration and cost for individual activity and project. To address these issues, this research collects data, measures productivity, and develops time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites and it is possible that the result will be used as the EVMS baseline of cost management and schedule management.

  • PDF