• Title/Summary/Keyword: Production material information

Search Result 383, Processing Time 0.027 seconds

A Study on the Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection (선체 블록의 물량 정보 생성 및 블록 탑재 시뮬레이션에 관한 연구)

  • Lee K.Y.;Roh M.I.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.11 no.2
    • /
    • pp.115-127
    • /
    • 2006
  • At the initial design stage, the generation process of the production material information of a building block and the simulation process of the block erection, which are required to perform the production planning and scheduling, have been manually performed by using 2D drawings, data of parent ships, and design experiences. To make these processes automatic, the accurate generation method of the production material information and the convenient simulation method of the block erection using the 3D CAD model, which was generated from the initial hull structural design system early developed by us, were proposed in this study. For this, a 3D CAD model for a whole hull structure was generated first, and the block division method for dividing the 3D CAD model into several building blocks was proposed. The generation method of the production material information for calculating the weight, center of gravity, painting area, joint length, etc. of a building block was proposed as well. Moreover, the simulation method of the block erection was proposed. Finally, to evaluate the efficiency of the proposed methods for the generation of the production material information and the simulation of the block erection, these methods were applied to corresponding processes of a deadweight 300,000 ton VLCC (Very Large Crude oil Carrier). As a result, it was shown that the production material information of a building block can be accurately generated and the block erection can be conveniently simulated in the initial design stage.

Estimation of Welding Material Quantity for Shipbuilding at Early Design Stage based on Three-dimensional Geometric Information (3차원 선박형상정보를 활용한 설계초기단계 용접물량 산출)

  • Lee, Jeong-Hoon;Byun, Seok-Ho;Nam, Jong-Ho;Kang, Tae-Won
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.54 no.1
    • /
    • pp.57-62
    • /
    • 2017
  • These days, shipbuilding companies are making an effort to adopt the IT technology in order to improve the production efficiency. One such effort is to utilize a planning and scheduling system to predict the production cost in advance. In this system, assessing the welding material quantity is an important factor. Unfortunately, obtaining the welding material quantity in the early design stage is extremely difficult because the detailed production information, which is essential in deriving the cost associated with welding, is normally available at a later stage. This paper aims at developing a computerized program that produces an index to estimate the welding material quantity in the early design stage. By using only three-dimensional geometric information, the program analyzes the production process and estimates the welding material quantity at any design or production stage when no production information is available. The results can be used for the planning and scheduling system.

Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection Based on the Initial Hull Structural Model (초기 신체 구조 모델을 기반으로 한 신체 블록의 물량 정보 생성 및 블록 탑재 시물레이션)

  • Roh, Myung-Il;Lee, Kyu-Yeul
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.43 no.1 s.145
    • /
    • pp.103-118
    • /
    • 2006
  • At the initial design stage, the generation process of the production material information of a building block and the simulation process of the block erection, which are required to perform the production planning and scheduling, have been manually performed using 2D drawings, based on the data of parent ships, and subjective intuition from past experience. To make these processes automatic, the accurate generation method of the production material information and the convenient simulation method of the block erection based on the initial hull structural model(3D CAD model), were developed in this study. Here, the initial hull' structural model was generated from the initial hull structural CAD system early developed by us. To evaluate the developed methods. these methods were applied to corresponding processes of a deadweight 300,OOOton VLCC. As a result. it was shown that the production material information of a building block can be accurately generated and the block erection can be conveniently simulated in the initial design stage.

Cost Estimation System for Design Evalution (설계평가를 위한 제조비용산정 시스템)

  • 박홍석;이규봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.281-284
    • /
    • 2000
  • For estimation manufacturing cost during the early design stage, desingers have to know compositon of manufacturmg cost. Manufacturing cost is summalion of material cost and processmg cost. To be able to control the manufacturmg cost, it is necessary to estimate the costs adequately and to store the cost data in a generic way. a generic system, which is the basis for the control of the production costs, takes into account geometric information, material information, process information and production planning information Manufacturing cost is summation of material cost and processing cost.

  • PDF

Structuring of BOM and Routings for CIM System In Make to Order Environments -Application of CIM System for Ship Production- (수주생산 환경에서의 CIM 시스템을 위한 BOM과 라우팅의 구조화 -조선산업 사례 중심-)

  • Hwang, Sung-Ryong;Kim, Jae-Gyun
    • IE interfaces
    • /
    • v.15 no.1
    • /
    • pp.26-39
    • /
    • 2002
  • Two key data areas of the integrated production database in computer-integrated manufacturing (CIM) systems are the product structure in the forms of bills of material(BOM) and the process structure in the forms of routings. The great majority of existing information systems regard the BOM and routing as two separate data entities, possibly with some degree of cross-referencing. This paper proposes new information structure called the bills of material and routings(BMR) that logically integrates the BOM and routings for the CIM systems in ship production. The characteristics of ship production are described as: 1) make-to-order production type, 2) combined manufacturing principles (workshop production and construction site production), 3) significant overlapping of design, planning and manufacturing, 4) very long order throughput time, 5) complex product structure and production process. The proposed BMR systematically manages ail parts and operations data needed ship production considering characteristics of ship production. Also, the BMR situated on the integrated production database more efficiently supports interface between engineering and production functions, and integrates a wide variety of functions within production such as production planning, process planning, operation scheduling, material planning, costing etc., and simplifies information flow between sub-systems in CIM systems.

Development of production control information system for multi-product, small-lot-sized production (다품종소량 생산관리정보시스템의 개발사례)

  • 조규갑;김갑환;문일경;김기영
    • Korean Management Science Review
    • /
    • v.10 no.2
    • /
    • pp.43-59
    • /
    • 1993
  • A production control information system developed for multi-product, small-lot-sized production is presented. The system is composed of interrelated modules for production planning, shop floor control, and inventory/material management. The architecture of the system, functions of each module, and information processing procedures of each function are discussed.

  • PDF

Implementation of Real-time Integrated Platform for Producing Food Packaging Container

  • Kim, Chigon;Park, Jong-Youel;Park, Dea-Woo
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.1
    • /
    • pp.194-200
    • /
    • 2021
  • This study proposes a plan to construct an integrated platform that reduces manufacturing costs and efficiently produce by integrating the systems of main producers, production subcontractors, and raw material subcontractors for the production of food packaging containers. The production plan of food packaging containers and raw materials is established in real time between the main producers, production subcontractors, and raw material subcontractors in consideration of the demand characteristics of each product. It establishes basic information that all processes from the production planning stage to the forwarding stage of the product are linked to each other. The progress of each producer of interlinked processes is shared in real-time to improve productivity and quality of food packaging containers and raw materials and reduce manufacturing costs. By monitoring the system of the main producer and the production subcontractor in real time, the production of food packaging containers is performed in a timely manner, thereby improving productivity. The application of the plan-do-check-action (PDCA) process, which includes planning, execution, evaluation and improvement in the production operation processes of the main producer, production subcontractor and raw material subcontractor, enables improved production compliance rate. The contents of the main producers, production subcontractors, and raw material subcontractors are managed in real time, then a converged production management system is established through the platform proposed in this study to ensure timely supply and demand of raw materials without delay in ordering.

High performance MRP(Material Requirement Planning) system based on tree-structured BOM(Bill of Material) (트리 구조의 BOM(Bill of Material)에 기초한 고성능 MRP(Material Requirement Planning) 시스템)

  • Na Hong-Bum;Lee Hyung-Gon;Park Jin-Woo
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.601-602
    • /
    • 2006
  • The primary role of MRP(Material Requirement Planning) is to make a production plan so that we have an exact quantity of right materials on needed time at right place. But the ignorance on capacity constraints makes some problems whenever production schedule is established. To increase the performance of MRP system, a novel approach which is based on new input data structure is suggested. The new input data structure includes all the information about Material BOM, Routing and resource data so that we can easily examine the usage of resources and generate higher performance production plans.

  • PDF

ZERO-EMISSION MATERIALS CYCLE IN PRODUCTION PROCESS AND REGIONAL SCALE

  • FUJIE, Koichi
    • Clean Technology
    • /
    • v.3 no.2
    • /
    • pp.13-24
    • /
    • 1997
  • The present paper aims to give basic information to establish zero emission material cycle including the minimization of emissions from industrial production processes and the area in regional scale. Strategies and methodologies to analyze emissions from the production processes and our human activities and to reduce those emissions by refining and/or replacing the unit process with the alternatives are introduced as well. Quantitative evaluation and management systems of any raw materials and the production process are from vie points of treatment are essential. Estabiishment of a process networking for the recycle of discharged non-products materials by the intra-process, trans-process and the trans-industries are proposed. Procedures and priorities to formulate industrial and regional zero emission system are proposed as well.

  • PDF

A Study on the Change of Production Strategy and Environment for Alternative Material for Person with Special Needs (장애인용 대체자료 제작 전략 및 환경 변화에 관한 연구)

  • Kang, Seong-goo;Lim, Kyoung-won
    • Journal of Korean Library and Information Science Society
    • /
    • v.48 no.4
    • /
    • pp.283-301
    • /
    • 2017
  • Recently, an integrated electronic publishing format that can be used by disabled people and the general public is expected. If applied to national alternative material production strategy, it is expected that not only the problem of alternative material production strategy using existing DTD(Document Type Definition) but also various alternative material corresponding to the demand of consumer can be supplied. In order to cope with changes in the production and management strategy of the substitute materials for the rapidly changing persons with disabilities, it is necessary to develop the substitute materials related to the substitute materials, such as 'production of alternative materials', 'research and education of alternative material', and 'operation of alternative material network' The organization of the National Library for the Disabled should be expanded and reorganized so that a constructed center can be established and demonstrated its expertise.