• 제목/요약/키워드: Product Availability

검색결과 254건 처리시간 0.026초

LTV(Lifetime Value)를 적용한 일정계획의 시뮬레이션 분석에 관한 연구 (A Study on Simulation Analyze on Scheduling Application to Lifetime Value(LTV))

  • 양광모;박재현;강경식
    • 대한안전경영과학회지
    • /
    • 제6권1호
    • /
    • pp.219-228
    • /
    • 2004
  • We can be acquire the conformation about on the due date of supplier by using the A TP(A vail able to Promise) function of management about real and concurrent access on the supply chain, also decide the affect about product availability due to forecasting or customer's orders through the A TP. Under the these environments, defines the A TP rule that can improve the customer value and data flow related the LTV(Life Time Value) and builds on a algorithm. In this paper, It consolidates the necessity on a LTV (Life Time Value) and analyzes data which is concerned of Customer Value. Under the these environments, defines the LTV rule that can improve the customer value. And then, Scheduling plays an important role in shop floor planning. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem.

Rapid One-pot, Four Component Synthesis of Pyranopyrazoles Using Heteropolyacid Under Solvent-free Condition

  • Chavan, Hemant V.;Babar, Santosh B.;Hoval, Rahul U.;Bandgar, Babasaheb P.
    • Bulletin of the Korean Chemical Society
    • /
    • 제32권11호
    • /
    • pp.3963-3966
    • /
    • 2011
  • A series of pyranopyrazoles, was efficiently synthesized via one-pot, four component reaction of ethyl acetoacetate, hydrazine hydrate, aldehydes and malononitrile in the presence of catalytic amount silicotungstic acid under solvent free condition. NOE experiments confirmed that the product exist exclusively in the 2H form. The present protocol offers the advantages of clean reaction, short reaction time, high yield, easy purification and economic availability of the catalyst.

Porcine Liver Esterase를 이용한 광학선택적인 레보플록사신의 생산 (Enantioselective Production of Levofloxacin from Ofloxacin Butyl Ester by Porcine Liver Esterase)

  • 이상윤;민병혁;황성호;구윤모;이철균;송성원;오선영;임상민;김상린
    • KSBB Journal
    • /
    • 제15권3호
    • /
    • pp.313-317
    • /
    • 2000
  • In this paper enantioselective production of levofloxacin by porcine liver esterase was investigated, To enhance the produc0-tivity various factors which affect the enzyme activity and the enantioselectivity were optimized, In terms of temperature and pH 45$^{\circ}C$ and 4.8 were found to be the best conditions for enzyme reaction. Addition of ofloxacin butyl ester the substrate at the concentration of 5 g/L was desirable to avoid the product inhibition and the activity of porcine liver esterase was maintained up to 72 hours.In addition to enhance the availability of substrate effect of solvent was also examined. It was found that the application of 5% (v/v) of acetone acetonitrile and dimethylsulfoxide did not increase the conversion of substrate and the presence of 5%(v/v) butanol inhibited the enzyme activity significantly.

  • PDF

What Ecosystem Factors Impact the Growth of High-Tech Start-ups in India?

  • Joshi, Kshitija;Satyanarayana, Krishna
    • Asian Journal of Innovation and Policy
    • /
    • 제3권2호
    • /
    • pp.216-244
    • /
    • 2014
  • This paper empirically establishes the role played by the ecosystem related parameters in the emergence and growth of high technology start-up clusters in India. It is mainly based on secondary data from six major start-up hubs in India during the period 2005-2013. Our results throw up several interesting findings. First of all, we find that traditional infrastructure related factors or robust macroeconomic situation in general are not the most important drivers. What really seem to matter are the specific start-up ecosystem related factors - such as the Internet penetration, volume of deal flow, availability of VC funding and a pre-existing critical mass of relevant high technology businesses and skill-sets. Above all, our study points out that high economic growth alone will not automatically lead to spillovers in the form of a vibrant start-up ecosystem. Rather it has to be a product of conscious and concerted policy efforts at all levels that directly address the main challenges faced by the early-stage start-ups.

Critical Success Factors for Malaysian SMEs and Large Companies in Commercializing Universities' R&D Outputs

  • Tam, Kok Chian;Chong, Aik Lee;Yee, Angelina Seow Voon;Tham, Joel Kah Marn
    • Asian Journal of Innovation and Policy
    • /
    • 제8권3호
    • /
    • pp.362-377
    • /
    • 2019
  • Commercializing universities' R&D outputs is a major management challenge and there are limited studies to describe this phenomenon from the perspective of companies' management. Experiences of six small and medium size and four large companies' management's respondents are gathered through semi-structured face-toface interviews. Twelve critical success factors revealed by the respondents, namely R&D product and market readiness, good partnership with university, researcher's motivationand commitment, availability of resources, government support and motivation, control and ownership of intellectual property rights, university's management support, entrepreneurial culture in the university, an open communication and trusting relationship, researchers' skills, a risk taking attitude, and existence of performance measures as important to commercialize the universities' R&D outputs in Malaysia. The different views from the management of small and medium size, and large companies are also discussed in this study.

장비가용능력에 의존적인 공정시간을 가지는 조립주문생산에서의 우선순위 규칙 (Dispatching rules for assembly job shops with process times relying on machine capacity)

  • 김봉혁;나동길;길국호;김동원
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회/대한산업공학회 2005년도 춘계공동학술대회 발표논문
    • /
    • pp.517-522
    • /
    • 2005
  • This paper addresses scheduling heuristics for an assembly job-shop that includes at least an assembly process throughout its processes. The assembly job shop has certain characteristics not only considering the precedence relationship between the processes but also considering the processing progress between the parts. In addition, it probably presents a different processing time for the same product according to the order of processes and the point of workable time, due to the difference in the availability of equipments. The paper proposes several priority-based dispatching rules that consider these characteristics of the assembly job-shop, aiming to minimize the total tardiness of products in the shop floor. Computational tests showed that job due date based priority rules significantly outperform existing priority rules in terms of total tardiness.

  • PDF

실리카 흄을 혼입한 고강도 콘크리트의 시공성 및 공학적 특성에 관한 기초적 연구 (A Fundamental Study on the Workability and Engineering Properties of Silica-Fume High Strength Concrete)

  • 권영진;김무한
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1990년도 봄 학술발표회 논문집
    • /
    • pp.29-34
    • /
    • 1990
  • Energy cries and availability have funded extensive research and numerous conferences. So, the idea of adding slags and pozzolans such as flyash to portland cement or portland cement concrete is widely practiced because it helps to reduce cost and conserve energy, resources and the environment. Recently, Silicafume which is the industrial by-product of electric arc furnaces is also widely studied for achieving high strength concrete. It is the aim of this study to provide the fundamental data on the workability and engineering proper of high strength concrete containing flyash and silica fume comparing with plain concrete for the practical use and research data accumulation of a new technique for achieving high strength concrete.

  • PDF

단일설비 생산체제에서 부품의 일정계획에 관한 발견적 기법 (A Heuristic for Scheduling Production of Components at a Single Facility)

  • 김봉진
    • 대한산업공학회지
    • /
    • 제20권2호
    • /
    • pp.31-38
    • /
    • 1994
  • We consider a single-machine scheduling problem dealing with the manufacture of components for subsequent assembly into end products. Each product requires both unique components and common components, and each production requires a setup. By making some assumptions on the data and the availability of the components for assembly, Baker provides on efficient dynamic programming algorithm for obtaining the optimal schedule. In this paper we do not impose any requirement on the data, and we solve the more complicated batching and sequencing problem. We suggest a simple heuristic method that is efficient and finds solutions that are optimal or close to the optimal solution.

  • PDF

신뢰성경영시스템(IEC 60300)의 효과적 도입 방안에 관한 연구 (A Study on the Effective Adoption of IEC 60300)

  • 김종걸;고재규;김창수
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2009년도 춘계학술대회
    • /
    • pp.153-165
    • /
    • 2009
  • It is hot issue to get the competitiveness of product through reliability-growth as well as availability and safety in almost high-technology industry including military, chemistry, nuclear, telecommunication, transportation service and so on. In advanced countries, they experienced remarkable growth based on reliability technology in materials&parts industry as well as high-tech industry. It has become a symbol of national competitiveness and created a higher value added. This paper is taking on effectively developing ways to deploy IEC 60300 dependability management system and the base technology that are needed to improve competitiveness of industries in Korea.

  • PDF

열가소성 재활용수지를 건축용 단층방수시스템에 활용하기 위한 인장 및 신장 특성 분석 연구 (Tension Strength and Expansion Property Analysis Research to Utillize Thermoplasticity Recycling Plastic to Single Play Waterproof System for Construction)

  • 박성우;고진수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.89-94
    • /
    • 2011
  • In this research, among thermoplasticity plastic raw material that recycling is possible polyolefine(TPO) and polyvinyl chloride(PVC) as target recycling plan examine wish to. It is polyolefine(TPO) and polyvinyl chloride(PVC)) is mediocrity material that there are a lot of amount useds among plastic material and it is material that recycling is also activated most. Long term made first new regulation raw material, by-product raw material happened at process of production at second factory and third time to examine recycling plan of this material divides this as raw material that pass through process separation and pelet Tuesday and analyzed each special quality removing each removed waste after is used. Measure tension strength and ext. heightening gradually mixing proportion of refreshing resources on standard Sample manufactured as new raw material and application examined possibility availability to single fly system.

  • PDF