• Title/Summary/Keyword: Procurement management

Search Result 485, Processing Time 0.023 seconds

A Study on the Improvement Direction through the Analysis of the Legal System and Current Process of KONEPS (국가종합전자조달시스템의 제도 및 프로세스 고찰을 통한 개선 방향 연구)

  • Kim, Sang-Min;Lee, Hyun-Soo
    • Journal of Digital Convergence
    • /
    • v.15 no.11
    • /
    • pp.23-35
    • /
    • 2017
  • Since the beginning of 2002, KONEPS(Korea ON-line E-Procurement System) which is known with GePS(Government e-Procurement Service), has become a significant role in Korea public procurement service. This paper focuses on the amendments of the related laws and the practical improvement of inconveniences and inefficiencies in user's' position during the use of KONEPS. We analyzed the case of government procurement by major countries, the detailed process and function of KONEPS, and confirmed the revised procurement laws since the commencement of KONEPS. When a user of KONEPS makes an online purchase at the g2b shopping mall to purchase procurement goods, we analyzed focused on the inconvenience of option selection, user feedback after purchasing, unification of the purchase procedure, compared with general online shopping purchase. This paper suggests practical ways to improve the inconveniences and inefficiencies that arise in the process of procurement and use from KONEPS. It is necessary to study on the construction contracts and the empirical studies based on the questionnaire on the functions of procurement law and research model for the cases used in this study in the future.

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.

  • PDF

Improvement of Architecture-Engineering Service Procurement System for Public Construction Project (건설기술용역 발주 및 입·낙찰 방식의 문제점 및 개선방안)

  • Kim, Sung-Il;Chang, Chul-Ki;Park, Dae-Keun;Bae, Yu-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.61-70
    • /
    • 2014
  • Various procurement systems for Architecture-Engineering service for public construction project are currently established by construction-related law. However, comprehensive framework and criteria for the selection of Architecture-Engineering firm are in absence. Even though various selection methods for Architecture-Engineering service are currently established by law, cost-based selection method is mainly used in selecting Architecture-Engineering firm for the service. This paper examined current use of procurement system for Architecture-Engineering service and drew problems in practice. Through analysis of problems and bench-marking of those systems in advanced countries and international organizations, several strategies to improve performance of Architecture-Engineering service and to maximize the efficiency were suggested. The suggestions include framework and guideline to select a procurement method for the service which is being considered for the project and way of improving current procurement system. These suggestions will be a foundation for utilizing appropriate procurement system for the specific project and can make domestic Architecture-Engineering firm more competitive in the global market by breaking form the cost-based selection method in the selection of Architecture-Engineering firms.

A Fuzzy Multi-Objective Linear Programming Model: A Case Study of an LPG Distribution Network

  • Ozyoruk, Bahar;Donmez, Nilay
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.3
    • /
    • pp.319-329
    • /
    • 2014
  • Supply chain management is a subject that has an increasing importance due to the developments in the global markets and technology. In this paper, a fuzzy multi-objective linear programming model is developed for the supply chain of a company dealing with procurement, storage, filling, and distribution of liquefied petroleum gas (LPG) in Turkey. The model intends to determine the quantities of LPG to be procured, stored, filled to cylinders, and transported between the plants and demand centers for six planning periods. In this model, which aims to minimize both total costs (sum of procurement, storage, filling, and transportation costs) and total transportation distances, demand quantities of the main demand centers and decision maker's aspiration levels about objective functions are fuzzy. After comparing the results obtained from the model with those obtained by using different methods, it is concluded that the proposed method can be applied to real world problems practically and it may be used in this type of problems in order to generate an efficient solution.

A Study on Mega-Y Project Innovation Activities (대형 혁신과제 추진방법에 대한 연구)

  • Sung, Su-Gyeong;Kim, Joon-Seok;Byun, Jai-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.38 no.4
    • /
    • pp.531-539
    • /
    • 2010
  • Mega-Y project is very important for a company to gain a competitive advantage in markets or to achieve drastic change in the internal processes. It stems from the company strategy and annual management goals or key performance measures, and is proceeded by the cross-functional team. This paper presents the success factors and implementation process of the Mega-Y projects. The implementation process is presented in 5 steps, including project selection, cross-functional team building, establishment of the master plan, development and execution of sub-projects, and project completion. A case study on the cost reduction project of aircraft development is presented to help for the practitioners to deploy the implementation process introduced in this paper.

A Study on the Determination of Delivery Cycle for Procurement of H Automobile in China (중국 H자동차의 조달물류에서 시뮬레이션 방법을 활용한 최적 배송주기 결정에 관한 연구)

  • Zhang, Jing-Lun;Jang, Jung-Hwan;Lee, Doo-Yong;Yoo, Sung-Hee;Lee, Chang-Ho
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.173-177
    • /
    • 2013
  • 공급사슬관리(Supply Chain Management)의 목적은 공급사슬에서 발생하는 재고 및 운송에 관련한 비용을 최소화하는 것이다. 여기서 발생하는 비용은 여러 변수에 의해 결정되기 때문에 공급망 전체를 하나의 시스템으로 보고 모델링하여 분석할 필요성이 있다. 여러 구성요소들을 시간의 흐름에 따라 변화하는 모습을 분석하기 위해 수학적 접근방법을 사용하는 것 보다 시뮬레이션 방법을 사용해 모델링하는 것이 더 효과적이다. 따라서 본 연구에서는 중국의 H자동차의 조달물류의 문제점을 파악하고 이를 개선하기 위한 방안을 마련하기 위해 시뮬레이션 방법을 활용하여 조달물류의 최적 배송주기를 도출하고, 재고관리의 문제점을 개선 하고자 한다.

  • PDF

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

Migration of Workers' Knowledge into Information Systems : Managerial Issues from the Case of e-Procurement Service Company (조직원 지식의 정보 시스템 이전 : 전자 구매 서비스 기업 사례를 통한 관리적 함의)

  • Jung, Gwangjae;Shim, Seonyoung
    • The Journal of Society for e-Business Studies
    • /
    • v.18 no.2
    • /
    • pp.47-67
    • /
    • 2013
  • With the emergence of indirect procurement, it has become a global trend for companies to outsource their maintenance, repair, and operating (MRO) supplies to procurement service providers (PSPs). Due to the variety of MRO items, evaluation of numerous suppliers in various industries is a particularly complex task for PSPs. Due to this complexity, many PSPs still evaluate and select suppliers based on the sourcing managers' subjective knowledge. Through the case of adopting a supplier evaluation system, this research is to find the managerial issues organizations should consider when they transform sourcing managers' knowledge into the system. We interpret the issues based on the Technology-Organization-Environment (TOE) framework. This case conclusively shows the importance of positive feedback loop between the users and the information system for the performance improvement of the system.