• Title/Summary/Keyword: Procurement

Search Result 884, Processing Time 0.026 seconds

A Study on Development Direction of ROK Army Logistic System (군(軍) 물류체계(物流體系) 발전방향(發展方向) 제언(提言) - 육군(陸軍)을 중심(中心)으로 -)

  • Cho, Byung-Man
    • Journal of National Security and Military Science
    • /
    • s.13
    • /
    • pp.659-685
    • /
    • 2016
  • At this research, author discusses about ROK Army military supplies distribution system and suggests a direction of development as follows in order to achieve maximum efficiency. First, Develope a scientific technique to estimate quantity of repair part for futher demanding at the budgetting and procurement planning stage. Second, Introduce an Logistic Revolving Fund in other to reduce the procurement lead time & assure flexible procurement all year round. Third, Reestabilish supply step stages and reduce stock level which is authorized stock amount in logistic support unit. Fourth, Estabilish civilian - military integrated military supplies distribution system to improve the efficiency of logistics.

  • PDF

기술혁신 지향적 정부구매제도의 정책방향

  • 김태황;송종국
    • Proceedings of the Technology Innovation Conference
    • /
    • 2000.06a
    • /
    • pp.123-151
    • /
    • 2000
  • The aim of this paper is to investigate how the public procurement policy exerts an effect upon the technology innovation of the firm and to make alternative proposals how to reinforce the effect. Although the pubic procurement process based on its monopsonic idiosyncrasy implies the means to lead the firms' supply function, the present system has contributed a little to accelerate the technology innovation. In fact, the system is lacking of the evaluation capability referring to the technological computer among the bidding films. So as to reinforce the function of technology innovation of the public procurement policy, it is necessary to improve the procurement institutions, in particular bidding and contract system. Finally, the paper propose, on the on hand, to enlarge the application range of the total bidding system in order to apply more strictly the technology evaluation standards on bidding, and on the other hand, to multiply the competitive proposal and the incentive contract type.

  • PDF

Developing of XML Messaging System for efficiently e-Procurement (효율적인 e-Procurement를 위한 XML 메시징 시스템 개발)

  • 임종선;주경수
    • The Journal of Society for e-Business Studies
    • /
    • v.7 no.2
    • /
    • pp.83-95
    • /
    • 2002
  • Because XML is a W3C standard and has characteristics like platform-independent, it has a critical role in e-commerce. Business rules and procedures should be standardized for efficient B2B integration. But a lot of companies has its own XML documents instead of standard documents. Therefore many organizations try to make standards for e-commerce based on framework. In this paper, n messaging system is designed and implemented. Client request service in a XML and server return response in XML in this system. So we can more easily and efficiently build e-Procurement system based on this XML messaging system.

  • PDF

The Assessment of Food Procurement Practices in Elementary School Foodservices Located in Kyungkido (초등학교 급식소의 식품구매 실태조사 -경기도 지역을 중심으로-)

  • 유양자;윤선주
    • Korean journal of food and cookery science
    • /
    • v.13 no.3
    • /
    • pp.319-329
    • /
    • 1997
  • Food procurement practices in elementary schools were evaluated to provide basic information for the efficient foodservice management. Total 85 self-completed questionnaires were collected out of 134 dieticians working for elementary schools in Kyungkido, and analyzed for demographic background, purchasing activities and processing-food utilization status. The results were as follows: 1. The elementary schools were located in urban (22.0%), provincial (58.5%), and isolated areas (19.5%). 2. 62.4% of them were conventional schools and rest of them were commissary schools (37.6%). 3. As the total meals produced in schools increased, the number of meals served per foodservice staff and the workload increased, and more foods were purchased through wholesalers and competitive bids. 4. There were no significant differences (p > 0.05) in food procurement practices by the location, type of foodservice systems and the size of schools. 5. As the number of total meals in schools increased, the level of FPI (Food Processing Index) points for meat products, fish products, kimchi and sauce decreased.

  • PDF

MODEL FOR GOVERNMENT RESCUE POLICIES IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS

  • S. Ping Ho
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.996-1001
    • /
    • 2005
  • Today, government is no longer considered the sole provider of public works or services. Public-Private Partnership (PPP) has been recognized as an important approach to solving problems for governments in providing public works and services. However, the joint ownership of public works/services complicates the administration of PPP projects. Particularly, the fact that government may rescue a distressed project and renegotiate with the developer causes serious problems in project procurement and management. This paper aims to study when and how government will rescue a distressed project and what impacts government's rescue behavior has on project procurement and contract management. A game-theory based model for government rescue will be developed. This pilot study, the author hopes, may provide theoretic foundations to practitioners/policy makers for prescribing creative PPP procurement and management policies and for examining the effectiveness of PPP policies.

  • PDF

Analysis of the Importance of Evaluation Factors for Automotive Procurement Logistics using AHP (AHP를 활용한 자동차 조달 물류 평가요인 중요도 분석)

  • Young-Kyou HA
    • Korea Trade Review
    • /
    • v.47 no.2
    • /
    • pp.19-29
    • /
    • 2022
  • This study evaluated the importance of automobile procurement logistics using AHP. Although automobile procurement and logistics is represented by JIT, internal and external risk factors for the automobile and logistics industries are increasing, so it is necessary to re-evaluate them and establish countermeasures. Therefore, this study conducted AHP analysis targeting 30 automobile procurement and logistics experts. Through previous studies and interviews, 4 factors for Tier 1 and 12 factors for Tier 2 were derived. As a result of AHP, the logistics factor was analyzed as the most important and the cost factor was less important than the other factors. This means that supply chain operation is more important than cost, and it is analyzed that stopping all supply chain participants is more damaging than logistics or inventory costs. Such research can provide implications not only for the automotive supply chain but also other industries with similar characteristics, and it is considered to be a meaningful study at the present time when the global supply chain is being reorganized.

eProcurement System Implementation Cases & G2B Innovation Scheme

  • Choe, Yeong-In
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.25-33
    • /
    • 2001
  • eProcurement System io for the improvement of costs and productivity, and consists of eCatalog, eSourcing supporting the supplier selection, and ePurchase system supporting purchase request, approval, and PO.(omitted)

  • PDF

Factors Affecting Nurse Clinicians' Knowledge and Attitude of Organs Procurement from Brain Dead Patients (임상간호사의 뇌사자 장기기증에 대한 지식과 태도에 영향을 미치는 요인)

  • Lee, Hyun Ah;Hur, Yujin;Lee, Young Gew;Song, Garam;Lee, Eunji;Shin, Sujin
    • Journal of Korean Critical Care Nursing
    • /
    • v.10 no.3
    • /
    • pp.19-30
    • /
    • 2017
  • Purpose : This study investigated factors affecting the knowledge and attitude of organ procurement from brain dead patients in nurse clinicians. Methods : A survey was conducted with 160 clinical nurses from a university hospital in Seoul. Descriptive statistics, t-tests, an ANOVA, $Scheff{\acute{e}}^{\prime}s$ test, Pearson's correlation coefficient, and a multiple regression analysis were used. Results : The mean score for knowledge of organ procurement from brain dead patients was $12.41{\pm}2.16$ (mean correct answers = 62.1). Factors influencing the knowledge of organ procurement among nurse clinicians were working department (${\beta}=.454$, p < .001), a recent family death (${\beta}=.187$, p = .014), experience recognizing potential brain dead patients (${\beta}=.182$, p = .033), and experience referring to potential brain dead patients (${\beta}=-.192$, p = .048). Conclusion : To ensure effective organ procurement from brain dead patients, it is necessary to continually educate nurse clinicians to improve their attitude and knowledge concerning organ donation.

  • PDF

A Case of Evaluation of the G2B System by Analysing Operational DB Data (DB운영 데이터 분석을 통한 G2B 시스템 평가 사례)

  • Lim, Gyoo-Gun;Lee, Dae-Chul
    • Journal of Information Technology Services
    • /
    • v.11 no.2
    • /
    • pp.243-258
    • /
    • 2012
  • The G2B system is one of the important information systems in the e-government implementation. It is difficult to measure the cost reduction effect of the system introduction because there are many participants in the complex procurement processes. Previous approaches of the performance evaluation of such processes have been based on conducting some surveys and interviews with statistical methods. Therefore there have been some limitations in the verification of feasibility. Therefore this study tries to suggest a case of performance evaluation about the cost reduction in using of the G2B system by analyzing operational DB data from the G2B system. This study analyzed the procurement processes of G2B system according to 'goods' and 'facilities/services' and classified the procurement processes into 12 sub-processes. By developing an evaluation model for the cost reduction of e-procurement, we derived the whole cost reduction effect was 8,000 billon Won for the use of Korea KONEPS G2B system in 2008. Specially the cost reduction in the private sector was 6,600 billion Won. It was mainly due to the decrease of the offline visits to the related organizations to participate a bidding process. Moreover, the cost reduction of using shopping mall was 1,000 billion Won among the total 1,400 billion Won in the whole public sector. The main contribution of this paper is to show the more objective evaluation result of the use of e-procurement, which verifies the necessity of G2B system.

A Study on the Improving Life-up and Procurement Work Flow for Effectiveness of Resources increase in the Building Construction (건설공사의 자원 효용성 증대를 위한 조달 및 양중 작업흐름 개선에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2003
  • The purpose of this study is to present an improved lift-up & procurement work flow for effectiveness of resources increase in building construction. The current lift-up & procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up & procurement work flow. The main contents of the study are as follows; 1) A problem of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning The study recommends that continuous improvement of lift-up & procurement work flow and efficient management of information in building construction.

  • PDF