• Title/Summary/Keyword: Procurement

Search Result 891, Processing Time 0.021 seconds

Implementation of Customized EPM for Collaborative Resource Procurement in Small and Medium Size Plant Construction Enterprises (중소플랜트기업의 협업자원조달을 위한 Customized EPM구현)

  • Nam, Jung-Tai;Kim, Sung-Hun;Han, Young-Geun
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.2
    • /
    • pp.133-141
    • /
    • 2008
  • The need for total enterprise management that covers from accepting orders, design, cost, procurement, manufacture, and delivery has been recently raised in order for efficient project management of small and medium size plant construction enterprises. This trend is reflected in the introduction of EPM(Enterprise Project Management) solutions by some shipbuilding enterprises and large construction corporations. In step with the trend, small and medium size plant construction enterprises are enabled to provide knowledge base in terms of reducing cost and production period and managing portfolio for accepting orders and attaining contract by inducing customized EPM This study presents a design of customized EPM based on a case study of a company. It exhibits a collaborative/collaboration resource-supply model which can be universally applied to small and medium size job-order production enterprises. The research discusses that under the assumption that information is shared internally between departments on planning, supply, manufacture, and quality control in order to create collaborative environment and close participation is created externally between suppliers and orderers, productivity can be improved in cost reduction through planning efficient collaborative supply model.

Development of the Estimation Software for a Petrochemical Plant (화공플랜트 견적 소프트웨어 개발에 관한 연구)

  • Min, Bong-Ki;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.8 no.1
    • /
    • pp.50-59
    • /
    • 2012
  • The current dual-watchdog estimation system has individually calculated the construction, the engineering and the procurement cost. The dual-watchdog estimation system is inefficient and prolonged estimation period because of the lack of the interoperability and the difference of material unit cost and construction unit cost. In order to resolve this problem, new estimation software was developed. The estimation software is developed by making up for the weak points in existing estimation method. The cost data with the same standard is the key point. And this software enhanced accuracy and speed of the data search in stylized estimation standard. A summary of the construction, the engineering and the procurement cost was generated in this estimation software. The unit rate about the labor cost, equipment and expense through a sheet was handled. The developed estimation software has five categories on engineering cost, procurement cost, construction cost and subcontractor management sheet. In this study, the estimation software to supplement the faults of the existing estimation method was developed. And estimation software on petrochemical projects increases an efficiency of the estimation work.

  • PDF

A Study on the Procurement of Iron Materials and the Production of Ironwork in Constructions of Royal Tombs in the Later Joseon Period -Focused on Sanneung-uigwes- (조선후기 산릉공역의 철물 조달과 철제품 제작 -산릉의궤를 중심으로-)

  • Lee, Sang-Myeong
    • Journal of architectural history
    • /
    • v.25 no.5
    • /
    • pp.27-40
    • /
    • 2016
  • The purpose of this study was to comprehend the procurement system of iron materials and the production process of ironwork in royal tombs constructions in the later Joseon period. For this purpose, sixteen Sanneung-uigwes were analyzed. The following conclusions have been reached through the study. First, it was procuring five types of iron materials in constructions of royal tombs. Sincheol had been supplied up to the mid-18th century. On the other hand, the amount of jeongcheol was increased rapidly. Because of the procurement system of initial tools was changed from bokjeong(a kind of tribute) to self-production in the Noyaso. Second, the government stockpiles were utilized as much as possible than bokjeong to manage the limited construction period and sudden construction start. Third, before moving the site of tombs, the melting furnace was installed in the Gungisi(armament factory). The amount of the melting furnace was increased from 5 to 8 since producing the initial tools in the Noyaso. Fourth, six kinds of master artisans were worked in the field of producing ironwork. Metal worker was assigned to one person per melting furnace. Fifth, the quality of final iron materials was controlled by use. Since the 19th century, it had been produced enhanced ironwork.

Study on Impacts of Using Characteristics of Public Systems on Customer Satisfaction and Loyalty of the Systems : Korean E-Procurement System (공공시스템사용특성이 고객만족과 충성도에 미치는 영향에 관한 연구 : 국가종합전자조달시스템)

  • Lim, Kyung-Won;Kim, Yon-Tae;Kim, Chul Soo
    • Journal of Information Technology Services
    • /
    • v.12 no.1
    • /
    • pp.83-98
    • /
    • 2013
  • Advanced IT of Korea is the important factor that has improved the performance of business to business e-business systems, especially On-Line E-procurement System (KONEPS). Obviously KONEPS is well positioned in businesses of Korea. In order to be higher performance in KONEPS, it needed to be analysed important characteristics composed of KONEPS. Even though KONEPS has been operating well, user's satisfaction and customer loyalty for KONEPS was not high in real businesses. In this research, we tried to find the factors affecting user satisfaction and customer loyalty for KONEPS and figure out the mechanism among the factors. We surveyed using characteristics, which are information diversity, usability, system reliability and stability, on suppliers, main users of KONEPS. We consider the using characteristics as independent factors of the research model. Meanwhile, we model user's satisfaction and customer loyalty as the dependent factors. The results from the study are helpful in providing policies and strategies to promote the use of KONEPS.

Supply Chain Modelling for JIT of the Costruction (건설공사의 적시생산을 위한 자재공급 모델링 -전기설비 케이블덕트관 사례-)

  • Kim Bo-Hyun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.490-493
    • /
    • 2002
  • There have to be a pooled procurement in order to control construction in every stage. And we need also efficient supply chains to utilize the process. Researching and developing the method, which make it possible the supply chain management by modeling for Internet-enabled pooled procurement in construction, through breakdown in materials is currently in-progress the inside and out side of country. The objective of this paper is to find a reform while modeling the production process of cable duct moreover understanding the wasting factors in each step.

  • PDF

Optimal LNG Procurement Policy in a Spot Market Using Dynamic Programming (동적 계획법을 이용한 LNG 현물시장에서의 포트폴리오 구성방법)

  • Ryu, Jong-Hyun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.3
    • /
    • pp.259-266
    • /
    • 2015
  • Among many energy resources, natural gas has recently received a remarkable amount of attention, particularly from the electrical generation industry. This is in part due to increasing shale gas production, providing an environment-friendly fossil fuel, and high risk of nuclear power. Because South Korea, the world's second largest LNG importing nation after Japan, has no international natural gas pipelines and relies on imports in the form of LNG, the natural gas has been traditionally procured by long term LNG contracts at relatively high price. Thus, there is a need of developing an Asian LNG trading hub, where LNG can be traded at more competitive spot prices. In a natural gas spot market, the amount of natural gas to be bought should be carefully determined considering a limited storage capacity and future pricing dynamics. In this work, the problem to find the optimal amount of natural gas in a spot market is formulated as a Markov decision process (MDP) in risk neutral environment and the optimal base stock policy which depends on a stage and price is established. Taking into account price and demand uncertainties, the basestock target levels are simply approximated from dynamic programming. The simulation results show that the basestock policy can be one of effective ways for procurement of LNG in a spot market.

A Study on the Measurement of the Efficiency of Auto Parts Firms Using DEA Cross Analysis Model (DEA 교차분석 모형을 이용한 자동차 부품기업의 효율성 측정에 관한 연구)

  • Sin, Jeong-Hun;Hwang, Seung-June
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.42 no.2
    • /
    • pp.49-61
    • /
    • 2017
  • The study on the efficiency analysis of Korean automobile parts companies is mostly based on the calculation of the size of output such as sales. However, the performance indicators such as sales, operating profit, and net profit are directly related to the cost structure, and this cost structure is affected by changes in the company's asset structure and capital structure. As a result, it is necessary that efficient capital procurement should be done at the same time to create efficient management performance through proper investment. In this study, we aim to measure the efficiency of asset and capital procurement compared to the sales figures, such as sales, generated by 33 primary suppliers who supply parts to Hyundai Kia Motors. For this purpose, this study proposed a DEA cross analysis model that can simultaneously measure efficiency in terms of input assets and capital procurement based on the same management performance when analyzing the efficiency of domestic auto parts companies.

The Research on the Managing Method for Reasonable Amount of Inventory in Construction Site Using Inventory Model and BIM Data. (재고모형과 BIM 데이터를 활용한 건설현장의 적정 재고 관리방안에 대한 연구)

  • Kim, Ban-Seok;Park, Byung Joo;Park, Jung-Lo;Kim, Joo-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.119-120
    • /
    • 2012
  • The management for materials and inventory is one of the factors which are considered the most for profits of a business in almost all industrial fields. Resource procurement which occupies more than 40% of an overall construction cost has a strong relationship with profits of a business but it is regarded as a work for a manager rather than for a technician. It makes the importance of resource procurement relatively low and slows down the development of workings. As the construction project becomes more larger and complicated, effective management for materials are directly affecting the profits of a business. Therefore, this research works on finding an economical managing method for materials according to a characteristic of construction project based on accurately forecasted BIM data. Finding a reorder point by using BIM data which contains an accurate data for schedule and material enables a better management for materials and provides more accurate data on matters which were used to be determined by an intuition of a manager.

  • PDF

Implementation of Unique ID Considering the Evolutional BOMs in Ship Outfitting Design (선박 의장 BOM의 진화를 반영하기 위한 고유 식별자 구현)

  • Kim, Seung-Hyun;Lee, Jang-Hyun;Suh, Heung-Won;Jeon, Jung-Ik;Kim, Kwang-Sik
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.6
    • /
    • pp.449-459
    • /
    • 2010
  • Recently, not only marine PLM (Product Lifecycle Management) system but also an effective outfitting BOM (Bill of Material) management has been attracted by many shipyards. In particular, efficient outfitting design is being one of major issues in shipyards since most of currently designed marine vessels have more complex outfitting system than ever. Furthermore, each outfitting system has huge number of parts that should be arranged based upon the procurement and installation plan. Outfitting BOMs evolve into different forms according to the product development phases during basic design; detail design; and production design. Therefore, it is very difficult to maintain a consistent BOM data during the design phases. In order to express the evolution of product structures and the information of outfitting along the ship design, we suggested UID (Unique ID) code system. The UID (Unique ID) is used in order to create the relationship within evolutional BOMs of each design stage. It utilizes as the procedure of weight calculation for procurement BOM during each design stage. Thereafter, in order to demonstrate suggested outfitting BOM management technique, we suggested a prototype. In the prototype system, suggested features of outfitting BOM are implemented.

A Study on Material Requirement Planning by Integrating Schedule and Cost (비용$\cdot$일정 통합관리를 이용한 자원소요계획에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.106-113
    • /
    • 2003
  • In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.