• 제목/요약/키워드: Process-based evaluation

검색결과 3,757건 처리시간 0.03초

주거용부문의 DSM 절전잠재량 추정 (Estimating DSM Potentials in Residential Sector)

  • 이창호;조인승
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 D
    • /
    • pp.982-984
    • /
    • 1997
  • DSM activities have grown and matured over several years in Korea. KEPCO is currently offering some DSM programs in industrial, commercial, and residential customers such as rebate program in purchasing efficient measures. The systematic evaluation process of energy savings and peak reduction will be very important for deciding on the optimal investment of DSM activities in utilities in the future. In general, the estimation process of the potential savings of DSM activities include the determination of baseline electricity consumption, the instantaneous technical potential (ITP), the phased technical potential (PTP), the economic potential (EP), and the achievable potential (AP). The purpose of this article is to provide evaluation process of those DSM potential savings based on bottom-up approach and applicate to residential sector in Korea. In case study, ITP, EP are estimated to be respectively 21.5%, 5.7% of total energy consumption, and 4.1%, 2.5% of peak load in 2010.

  • PDF

무기체계 개발에서 시험평가 프로세스를 통한 프로젝트 위험관리 (On the Project Risk Management based on the Test and Evaluation Process in the Weapon Systems Development)

  • 심상현;이재천
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2013년 추계학술대회
    • /
    • pp.603-613
    • /
    • 2013
  • 최근 현대 무기체계는 최첨단 기술로 인한 무기체계 개발 속도 증가와 획득환경의 다변화와 더불어 이에 대한 위험도 동시에 증가하고 있다. 이에 따라 미국방부는 무기체계의 수명주기를 고려하여 시험평가를 지속 적용토록 강조하고 있다. 따라서 기존의 무기체계 시험평가 프로세스에서 다루는 시스템 설계에 대한 위험 관리 활동의 강화의 필요성 역시 강조되고 있다. 그 중에서도 무기체계 개발의 탐색개발 및 체계개발단계는 양산에 들어가기 전의 최종 활동으로서 제대로 수행되어야만 초기에 의도한 무기체계 개발의 목적을 달성할 수 있을 것이다. 본 논문에서는 위험 관리 활동을 고려한 시험평가 프로세스의 개선사항 도출과 모델링을 통해 무기체계 시스템인 무기체계를 대상으로 적용 및 조정 구축에 대한 내용을 기술하고 있다. 본 연구의 결과를 토대로 향후 시험평가 시 위험관리에 대한 투자를 통해 전체 프로젝트의 기간 단축 및 비용 절감과 안전성 확보를 개선시킬 수 있을 것으로 기대된다.

  • PDF

계층과정 분석을 통한 기업 안전 실태 평가 기법 설계에 관한 연구 -최근 3년간 산업재해 통계 자료를 중심으로- (A Study on Design of Safety Condition Evaluation Methods Using Analytic Hierarchy Process)

  • 양광모
    • 대한안전경영과학회지
    • /
    • 제12권2호
    • /
    • pp.1-7
    • /
    • 2010
  • The efficient safety estimation for a business should analyze an accident data by considering every possible and potential factor. Thus, we consider several factors to build the safety estimation model to meet fairness and rationality. This paper present the yearly statistic data of accident from KOSHA analyze the data by industry, scale, year of service of a employee, age and other factors; build the safety estimation model for the business based on the accident report derived the analysis. The estimation model is established by the weights for accident type, degree, scale, industry, year of service, and age of the employee derived from AHP(Analytic Hierarchy Process).

체계신뢰성에 기초한 교량의 시스템여용성 및 저항강도 평가 (SYSTEM RELIABILITY-BASED EVALUATION OF BRIDGE SYSTEM REDUNDANCY AND STRENGTH)

  • 조효남;이승재;임종권
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1993년도 가을 학술발표회논문집
    • /
    • pp.240-247
    • /
    • 1993
  • The precise prediction of reserved carrying capacity of bridge as a system is extremely difficult especially when the bridges are highly redundant and significantly deteriorated or damaged. This paper is intended to propose a new approach for the evaluation of reserved system carrying capacity of bridges in terms of equivalent system-strength, which may be defined as a bridge system-strength corresponding to the system reliability of the bridge. This can be derived from an inverse process based on the concept of FOSM form of system reliability index. It may be emphasized that this approach is very useful for the evaluation of the deterministic system redundancy and reserve strength which are measured in terms of either probabilistic system redundancy factor and reserve factor or deterministic system redundancy factor and reserve factor. The system reliability of bridges is formulated as a parallel-series model obtained from the FAM(Failure Mode Approach) based on the major failure mechanisms. AFOSM and IST methods are used for the reliability analysis of the proposed models. The proposed approach and method for the system redundancy and reserve safety/strength are applied to the safety assessment of actual RC and steel box-girder bridges. The results of the evaluation of reserved system safety or bridge system-strength in terms of the system redundancy and the system safety/strength are significantly different from those of element reliability-based or conventional methods.

  • PDF

Development of advanced rigorous two-step code system for evaluation of radioactive waste with high-resolution activation calculation

  • Kim, Do Hyun;Kim, Jiseok;Lee, Han Rim;Sun, Gwang Min;Shin, Chang Ho;Kim, Jong Kyung
    • Nuclear Engineering and Technology
    • /
    • 제53권6호
    • /
    • pp.2011-2018
    • /
    • 2021
  • Nowadays, evaluation of amounts and distributions of radioactive waste is an important preparatory step in the process of nuclear reactor decommissioning. For tentative estimation of radioactive waste, a cell-based rigorous 2 step (R2S) method usually is used; however, a poor resolution caused by the averaged flux and spectrum in a cell is still a great challenge because of leading to underestimated or overestimated results. To overcome the poor resolution, several systems were introduced. Neither system, however, provides any function for evaluation of radioactive waste amount and distribution. Thus, it is additionally required to classify radioactive waste based on the results of activation calculation. In this study, the advanced R2S (AR2S) system was developed. To verify the performance of the system, its results for a verification problem were compared with those of the cell-based R2S method. The results showed good agreement, which is to say, within 2.0% relative error. Also, several characteristics of fine/coarse mesh were analyzed. To demonstrate the performance of the AR2S system, the radioactive waste from the Japan Power Demonstration Reactor (JPDR) was estimated, and the result indicated a high-resolution distribution. Therefore, it is expected that the AR2S system will prove useful for precise evaluation of radioactive waste.

패스트 패션의 상품 공급 프로세스 설계에 관한 연구 (The Product Supply Process Design for Fast Fashion Industry with BPMN)

  • 박현성;박광호
    • 산업경영시스템학회지
    • /
    • 제34권3호
    • /
    • pp.134-146
    • /
    • 2011
  • This paper suggests the product supply process model based on the store and production capacity, assortment planning and quick response for fast fashion retailers with BPMN. In the fast fashion industry, the standardized business process model is required to respond quickly market trends and customer requirements based on the quantitative and qualitative criteria. Thus we define the product supply processes which incorporate forecasting and assortment plan, cost and profitability of the production, store capacity based on the visual merchandising, and production capacity of the fast fashion retailers. Also we design the key performance indicators to evaluate the effectiveness of these product supply processes. The product supply process model for the fast fashion has great significance in embracing the fast fashion product development process because it presents the holistic view of the product supply process of the fast fashion and provides a performance evaluation mechanism. A case study shows that adopting the processes, a Korean fast fashion company achieves improvement in various performance indicators.

스웨징 작업에서의 국소진동 노출평가 (Evaluation of Hand-Arm Vibration in Swaging Process)

  • 박인선;박원형;박상규;김규상
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2001년도 추계학술대회논문집 I
    • /
    • pp.433-438
    • /
    • 2001
  • This study is performed to evaluate hand-arm vibration syndrome(HA VS) of the workers in swaging process. Vibration measurement and assessment of human exposure are based on the international standard(ISO 5349). Triaxial acceleration of each operation and exposure time are measured to predict the periods before finger blanching, As results, it is found that acceleration is concerned with the diameter of pipes in swaging process, and also found that combined work is more harmful than a single operation.

  • PDF

AHP를 활용한 SWG 조합기술 평가기준에 관한 연구 (A Study on the AHP based Evaluation Criteria for the Combinatorial Technology of Smart Water Grid)

  • 김윤중;곽동근;김원태;김정주;신흥섭;김용성;김상선;김채수
    • 상하수도학회지
    • /
    • 제28권1호
    • /
    • pp.103-110
    • /
    • 2014
  • In this study, the evaluation criteria of performance and applicability is developed to rank the combinatorial technologies for SWG (Smart Water Grid) system using AHP (Analytic Hierarchy Process) method. Security, safety, solution, suitability and sustainability which are goals of SWG technology, are used as upper level hierarchy elements. And three detailed elements for each upper level hierarchy are adopted as the lower level hierarchy. The weighted value which represents the importance of each element, could be determined through questionnaires accomplished by groups of specialists who are engaged in relevant waster industry and research area. To assess the accuracy of the evaluation criteria developed in this study, a simulation on four decision alternatives for smart water grid was carried out as an evaluation. Consequently which showed 90 % of accuracy.

Fuzzy AHP를 이용한 유비쿼터스 서비스 평가 프레임워크 (A Framework for Evaluating Ubiquitous Services using Fuzzy AHP)

  • 김수연;황현석
    • 한국산업정보학회논문지
    • /
    • 제13권5호
    • /
    • pp.158-167
    • /
    • 2008
  • 최근 정보기술의 발달로 유비쿼터스 컴퓨팅과 이를 이용한 유비쿼터스 서비스가 개발 중이거나 서비스 중이다. 향후 많은 산업에서 유비쿼터스 서비스 활용이 증가할수록 서비스에 대한 평가가 필수적이라 하겠다. 본 연구에서는 유비쿼터스 서비스의 평가를 위한 구체적인 평가항목을 도출하고 이들 간의 중요도를 산출하는 프레임워크를 제시하고자 한다. 이를 위하여 유비쿼터스 서비스의 평가와 관련된 문헌을 고찰하고 전문가의 의견을 수합하여 주요 평가항목의 결정과 계층적 분석과정 기법을 이용하여 항목간의 중요도를 산출하고자 하였다. 평가자 평가결과의 정확성을 보정하기 위해 퍼지(fuzzy) 개념을 활용하여 중요도를 계산하였으며 설문을 통하여 실제 특정 분야에서 유비쿼터스 서비스를 평가하기 위한 항목의 중요도를 도출하였다.

  • PDF

프로젝트경영 관련 연구 논문 평가 - K.M.A.S-S. Al-Harbi의 'Application of AHP in Project Management' 논문을 대상으로 - (Paper Evaluation of 'Application of AHP in Project Management' by K.M.A.S-S. Al-Harbi)

  • 김민철;하태현
    • 디지털융복합연구
    • /
    • 제8권1호
    • /
    • pp.81-92
    • /
    • 2010
  • 본 연구는 프로젝트 경영 분야 중 Al-Harbi (2001)의 논문을 Pyrczak (2008)이 제시한 평가절차에 의하여 분석하였다. 분석 대상으로 선정된 Al-Harbi (2001)의 논문은 프로젝트 경영에서 의사결정방법론으로서의 AHP (Analytical Hierarchy Process) 적용 가능성을 제시하였다. 이러한 논문의 평가를 위해서 여러 절로 구분하여 Pyrczak (2008)에서 제시하는 분석표에 의해 논문을 세부적으로 평가하였다. 본 연구는 연구 논문의 평가 방법을 정량화된 수치에 의해 보여줄 수 있음을 제안했다는 점에의 의미를 갖고 있다.

  • PDF