• Title/Summary/Keyword: Process safety management

Search Result 2,039, Processing Time 0.027 seconds

A Study on the Improvement of Safety Management in the Workplaces Subject to Process Safety Management (PSM) (공정안전관리(PSM) 대상 사업장의 안전관리 개선 연구)

  • Jong-hun Park
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.490-497
    • /
    • 2023
  • Purpose: Since the 1990s, Korea has been making various efforts to prevent serious industrial accidents, such as implementing a hazardous risk prevention plan and implementing a process safety management system, but a series of recent major industrial accidents have shown its limitations. Therefore, this study aims to present measures to improve safety management of PSM target workplaces. Method: Investigate previous studies and cases on improving safety management at workplaces subject to PSM, seek ways to improve safety management at workplaces subject to PSM based on existing safety management, and evaluate safety management system one of the causes of accidents. Therefore, a safety education program is established to increase employees' safety awareness and understanding, and to improve the safety level. Result: Measures such as establishing an organizational culture to improve safety management of PSM target workplaces, responding to disasters, systematic safety management, replacing and strengthening old facilities, and strengthening management's firm commitment to safety were presented. Conclusion: Through this study, it is meaningful to present a systematic plan to secure safety to reduce precious lives and damage, and it is expected to be useful in considering the direction of PSM improvement for each workplace.

Cost-Benefit Analysis for Safety Management Cost using Quantitative Risk Analysis (정량적 위험성 평가에 의한 안전관리 투자의 비용-편익분석)

  • 장서일;조지훈;김태옥
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.4
    • /
    • pp.15-26
    • /
    • 2002
  • The quantitative evaluation method of the safety management cost was suggested to prevent a gas accident as a major industrial accident. In a gas governor station, process risk assessments such as the fault tree analysis(FTA) and the consequence analysis were performed. Based on process risk assessments, potential accident costs were estimated and the cost-benefit analysis(CBA) was performed. From the cost-benefit analysis for five classification items of safety management cost, the order of the cost/benefit ratio was estimated.

Development of Real-time Process Management System for improving safety of Shop Floor (생산현장의 안전성 향상을 위한 실시간 공정관리 시스템 개발)

  • Lee, Seung Woo;Nam, So Jeong;Lee, Jai Kyung;Lee, Hwa Ki
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.4
    • /
    • pp.171-178
    • /
    • 2013
  • Workers are avoiding production/manufacturing sites due to the poor working environment and concern over safety. Small and medium-sized businesses introduce new equipment to secure safety in the production site or ensure effective process management by introducing the real-time monitoring technique for existing equipment. The importance of real-time monitoring of equipment and process in the production site can also be found in the ANSI/ISA-195 model. Note, however, that most production sites still use paper-based work slip as a process management technique. Data reliability may deteriorate because information on the present condition of the production site cannot be collected/analyzed properly due to manual data writing by the worker. This paper introduces the monitoring and process management technique based on a direct facility interface to secure safety in the field by improving the poor working environment and enhance there liability and real-time characteristics of the production data. Since the data is collected from equipment in real-time directly through the SIB-based interface and PLC-based interface, problems associated with workers' manual data input are expected to be solved; safety can also be improved by enhancing workers' attention to work by minimizing workers' injuries and disruption.

A Study on Process Innovation through Quality Management Diagnosis Model (품질경영진단모델을 통한 프로세스 혁신에 관한 연구)

  • Kim, Jong-Guk;Yu, Jin-Sam;Kim, Chang-Eun
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.547-559
    • /
    • 2012
  • This thesis introduced a model of diagnosing a company's quality management, and a process of achieving quality innovation based on the model. As for study methods, books and theses related to quality and process innovation were collected for investigation, a survey on internal employees to investigate major issues of quality and standard consciousness was conducted, and 5DP was discussed for balanced process analysis.

  • PDF

A Development on the Safety Management Information System in Building Work (빌딩공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

On Enhancing Test and Evaluation Process of Weapon Systems Development using DSM-Based Risk and Safety Management (DSM기법에 의한 위험 및 안전 관리를 통해 무기체계 시험평가 프로세스의 개선에 관한 연구)

  • Sim, Sang Hyun;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.89-96
    • /
    • 2015
  • The weapon systems development has some distinct characteristics in that a big size of government budget (derived from national tax) has been expended frequently and the completion of the development projects seems to take long. Thus, the impact of the potential changes in the required operational capability on the development activities can induce some type of project risks. As such, proper management of project risk has been one of crucial subjects in the weapon systems development. Although a variety of methods can be considered, an approach based on the test and evaluation (T&E) process has been selected in this paper in order to appropriately handle those potential risks. In the study of the underlying T&E process, the safety consideration (for instance, explosiveness) of weapon systems is also included. To achieve the objective of the paper, a step-by-step procedure is first presented in the analysis of the T&E process. Then, to pursue some enhancement on the process, a set of necessary and useful activities are added in terms of risk and safety management. The resultant process is further analyzed and tailored based on a design structure matrix method. The case study of a tank development is also discussed.

The Development of Quantitative Audit System for Safety Management Systems based on Accident Database (사고 데이터베이스를 활용한 안전 관리 시스템의 정량적 Audit 시스템 개발)

  • Ahn, Sung Joon;Lee, Chang Jun
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.1
    • /
    • pp.40-46
    • /
    • 2013
  • In the chemical process industries, accidents have a high potential and large effects on catastrophic results. Therefore the safety management for accident prevention plays a crucial role to guarantee the process safety. For these reasons, many systematic methods for safety management system have been widely employed in the fields of chemical processes. PSM (Process safety management) is one of most representative methods. The audit system, which is one of PSM system components, evaluates the performance of PMS system. However, most existing safety audit systems are not systematic and these are performed based on knowledges and experiences of various specialist. Moreover, the safety audit is only performed based on each independent technical component. So, the results of safety audit are not a quantitative index but only a series of commentaries. Finally, it is very difficult to obtain the comparison with other plants or industries. In this study, the novel systematic method and index-based accident database of auditing safety management systems for quantitative assessment are proposed. First, the elements of safety audit replace technical methods to categories of accident database. The F-N curve of each category for accident database is employed to derive the index for quantitative assessment. The Accidental Factor Risk Index (AFRI) is suggested for evaluating the effect of each element in accident database and safety audit system. The safety audit can be modified according to the proposed index.

Improvement Plan of Implementing Condition Assessment in Process Safety Management (PSM) System (공정안전관리(PSM)제도의 이행상태평가 개선방안)

  • Lee, Joo Yeob;Lee, Keun Won;Ahn, Byung Joon;Kim, Tae-Ok
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.4
    • /
    • pp.27-34
    • /
    • 2016
  • Process Safety Management (PSM) system was introduced since 1996 and it makes voluntarily organizing and managing chemical accident prevention system by company itself that contributes to reduce the chemical accidents. However, large or small scaled chemical accidents had occurred frequently in these days. This trend is brought up the necessity to analyze and improve PSM system. In this study, it was conducted by the questionnaire survey and workshop for prevention of major industrial accidents in PSM sites in order to collect extensive opinions from all walks of life and identify overall operation condition. It was proposed to establish improvement plan of implementing condition assessment in PSM system. By results of the study, company's voluntary safety management will be induced by improved PSM system and management plan and it expects to prevent the major industrial accidents.

A Case Study on the Application of Configuration Management Process for the Development of High-Safety Railway Signaling System Based on International Standards (국제표준기반의 고안전성 철도신호시스템 개발을 위한 형상관리프로세스 적용사례 연구)

  • Choi, Yo Chul
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.2
    • /
    • pp.108-115
    • /
    • 2019
  • The activities of managing and controlling the configuration of a system component over its life cycle are critical tasks in developing a high safety system as well as general system development. These configuration management activities should be defined through the management plan at the beginning of the life cycle, and should be performed continuously and systematically until the end of the project after the system or product development is completed. In this study, the configuration management process applied in the development of high safety railway signaling system was introduced and an efficient application proposals of it was proposed. In particular, configuration management through the establishment of a configuration management system based on computer tools is one of the important activities of maintaining the configuration integrity of the system or product.

A Study on the Development Direction of the Effective Disaster Management Process Applying the Military Operation Process: Focusing on the Process of Establishing a Basic Safety Management Plan (군(軍)의 '작전수행과정'을 적용한 효과적인 '재난관리 수행과정' 발전 방향에 관한 연구: '안전관리기본계획' 수립 과정을 중심으로)

  • WooSup Yoon;YoungSeok Kwon
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.2
    • /
    • pp.398-410
    • /
    • 2024
  • Purpose: It is to present the development direction of the overall 'disaster management implementation process' (tentative name) for the establishment of an effective 'safety management plan' by the government and local governments. Method: To this end, prior research on the 'safety management plan' was reviewed to derive common problems, and the direction of development was suggested by incorporating the 'disaster management execution process' (tentative name) that can solve these problems with the military's 'operational execution process'. Result: Common problems of previous studies can be supplemented through the 'disaster management performance process' (tentative name) presented by this researcher. Conclusion: Through the "disaster management implementation process" (tentative name), the government's basic ideology of disaster management can be finally achieved, "confirming that it is a basic mission of the state and local governments and allowing the people to live in a society that is safe from disasters."