Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.612-613
/
2015
As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.
In this paper, we present the model-based autonomic computing framework for a cyber-physical system which provides a self-management and a self-adaptation characteristics. A development process using this framework consists of two phases: a design phase in which a developer models faults, normal status constrains, and goals of the CPS, and an operational phase in which an autonomic computing engine operates monitor-analysis-plan-execute(MAPE) cycle for managed resources of the CPS. We design a hierachical architecture for autonomic computing engines and adopt the Model Reference Adaptive Control(MRAC) as a basic feedback loop model to separate goals and resource management. According to the GroundVehicle example, we demonstrate the effectiveness of the framework.
The 5th International Conference on Construction Engineering and Project Management
/
pp.634-639
/
2013
The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.
Sedimentation is a natural process that occurs in all reservoirs. Sedimentation problem reduces the storage capacity of the reservoir and limits its ability to provide water for various uses, such as irrigation, hydropower generation, and flood control. Therefore, predicting reservoir sedimentation is important for ensuring the efficient operation and sedimentation management of a reservoir and . In this study, the HECRAS model was applied to predict longitudinal distribution of deposited sediment in the Pleikrong reservoir to 2050. Different scenarios was considered: (i) no climate change, (ii) climate change (under two emissions scenarios, RCP4.5 and RCP8.5), and (iii) climate change and land use change (followed land use planning of the watershed). The computation results with different scenarios were analyses and compared. The results show that the reservoir reduced storage volume's rate and sedimentation proceed toward to the dam in the case of climate change is faster than in the case of no climate change. Analyses also indicates that following the land used planning could also improve the long-term problem of the reservoir sedimentation. The outcomes of this study will be helpful for a sustainable plan of sediment management for the Pleikrong reservoir.
오늘날과 같이 급변하는 환경 하에서 대학도서관이 유기적 조직으로써 다양한 변화에 신축적으로 적응하면서 조직의 총체적인 성과를 측정하기 위해서는 자원을 중심으로 한 양적평가와 서비스를 중심으로 한 질적평가 이외에도 자원 활용의 효율성이나 효과성, 서비스의 제공 능력이나 조직구성원의 잠재능력 등 경영전반에 걸친 균형적인 성과측정표의 개발이 필요하다. 본 연구는 Kaplan과 Norton이 개발한 BSC 모형을 비영리조직인 대학도서관에 적합하게 수정하여 고객, 자원, 내부 프로세스, 학습 성장의 네 관점으로 그 모형을 개발하고, 각 관점별 전략에 대한 전략지도와 측정지표를 개발하였다. 궁극적으로 본 연구는 대학도서관에 전략적 계획과 균형성과표를 연계하여 적용함으로써 대학도서관 조직의 전략적 계획에서 성과까지의 전체적이고 포괄적인 그림을 제시하는 전략적 통합 경영지표를 제시하고자 하였다.
This paper focuses on method of setting priorities for telecommunications Standardization in which usually includes prioritization, resource allocation, standardization schedule for each SWA is based on prioritization of SWAs. We mainly used the Analytic Hierarchy Process(AHP) and a modified Delphi technique as a method for planning process. Recently, rapid technology evolution in telecommunications fields increases the necessity of developing more and more new standards. Also increased complexity of technologies makes standards more complicated, more specified and more thick than the past ones. As a result, the number of SWAa(Standardization Work Areas) and SWIs(Standardization Work Iterms) is being increased continuously. Furthermore, rapid telecommunication environment changes such as deregulation, liberalization, privatization, regionalization, and globalization surrounding telecommunications standardization grows increasingly important. To cope with these challenges and to make the more efficient use of the limited standardization resources, i.e., time, financial, personal resources, we will suggest logical and rational approach that is a backbone of strategic plan for telecommunication standardization. The telecommunication standardization planning process involves a MCDM(Multi-Criteria Decision Making) process. The Analytic Hierarchy Process(AHP) is a kind of MCDM approach. Our method is based on a combination of a modified Delphi technique and an application of AHP(spreadsheet model). Analyzed data from Delphi technique is used as inputs to AHP. In addition we also focus on the technique how to combine group judgments and to handle a large number of comparisons.
In this paper we present an integrated methodology for strategic planning in telecommunications standardization. Especially this paper focuses on the method of setting priorities for telecommunications SWAs(Standardization Work Areas) and related SWls(Standardization Work Items). To make a strategic plan for telecommunications standardization in which usually includes prioritization, resource allocation, standardization schedule for each SWA is based on prioritization of SWAs. Our methodology integrated various existing methods including the Analytic Hierarchy Process(AHP) and a modified Delphi technique. Recently, rapid technology evolution in telecommunications fields increases the necessity of developing more and more new standards. Also increased complexity of those technologies makes standards more complicated, more specified and more thick than the past ones. As a result, the number of SWAs and SWIs are being increased constantly. Furthermore, rapid telecommunication environment changes such as deregulation, liberalization, privatization, regionalization, and globalization surrounding standardization bring about new challenges and opportunities. Due to all these trends, strategic planning for telecommunications standardization grows more and more important. To cope with these challenges and also to make the more efficient use of the limited standardization resources including time, financial, human resources, we suggest more logical and rational approach that will be a backbone of strategic plan for telecommunications standardization. The telecommunications standardization planning process involves a MCDM(Multi-Criteria Decision Making) process. The Analytic Hierarchy Process(AHP) is a kind of MCDM approaches. Our method is based on a combination of a modified Delphi technique and an application of AHP(Liberator's spreadsheet model). Analyzed data from Delphi technique is used as inputs to ABP. In addition, we also focus on the technique how to combine group judgments and to handle a large number of comparisons. We present analyzed results including Pilot and Full Scale Survey according to the proposed process. The result of this study will be useful input for telecommunications standardization policy making and practical implementation.
Population growth and increasing consumption of resources in the process of the industrial development has caused environmental pollution, climate change, and resource exhaustion. Therefore 'sustainable development' has become the important issue for the future. The sustainable development aims at effective resource use, less environmental impacts, and higher social security. Generally the rural area including agricultural fields and forest has various and plentiful natural resources which could make future development sustainable. To develop potential rural resources, the values for energy, environment and economy should be assessed considering the life-cycle of resources. The purposes of this study are to suggest the E3 (Energy, Environment, and Economy) assessment model for rural biomass considering life-cycle of resource and to apply the model to rice, the major agricultural product. As the results of this study, it turned out through E3 assessment that economic gain of rice cultivation is 578,374 won/10a, carbon absorption is $1,530kgCO_2/10a$, carbon emission is $926.65kgCO_2/10a$, and bio-energy potential of by-product is 394,028 kcal/10a. When E3 assessment was applied to by province, the results varied by regions because of the amount of input during cultivation. These results would be useful to realize the rural biomass and design regional resources plan in integrated E3 perspective.
In recent years, business environment is faced with multi uncertainty that have not been suffered in the past. As supply chain is getting expanded and longer, the flow of information, material and production is also being complicated. It is well known that development service industry using application software has various uncertainty in random events such as supply and demand fluctuation of developer's capcity, project effective date after winning a contract, manpower cost (or revenue), subcontract cost (or purchase), and overrun due to developer's skill-level. This study intends to social contribution through attempts to optimize enterprise's goal by supply chain management platform to balance demand and supply and stochastic programming which is basically applied in order to solve uncertainty considering economical and operational risk at solution supplier. In Particular, this study emphasizes to determine allocation of internal and external manpower of developers using S&OP (Sales & Operations Planning) as monthly resource input has constraint on resource's capability that shared in industry or task. This study is to verify how Stochastic Programming such as Markowitz's MV (Mean Variance) model or 2-Stage Recourse Model is flexible and efficient than Deterministic Programming in software enterprise field by experiment with process and data from service industry which is manufacturing software and performing projects. In addition, this study is also to analysis how profit and labor input plan according to scope of uncertainty is changed based on Pareto Optimal, then lastly it is to enumerate limitation of the study extracted drawback which can be happened in real business environment and to contribute direction in future research considering another applicable methodology.
우리 군은 미래 전장개념인 네트워크 중심전(NCW) 환경 구축을 위해 장기적으로는 국방개혁 기본계획의 완성시점을 축으로 삼아 많은 노력과 투자를 기울이고 있다. 군 조직차원에서는 선진 프로세스를 도입하여 군의 지휘통제 시간을 단축시키고 이와 더불어 업무 프로세스를 향상시켜 의사결정 시간을 단축시키고자 한다. 또한, 정보체계 차원에서는 전장관리정보체계를 이용한 자동화된 지휘통제 체계 구축 및 자원관리정보체계를 통해 효율적인 자원관리를 하려고 노력하고 있다. 디지털기술의 발전과 혁신적인 IT환경에 맞추어 군에서도 객관적인 정보화 수준에 대한 지표를 통해 군이 지향하는 미래 목표대비 현재 어느 수준에 도달해 있는지에 대한 수준평가가 이루어져야 한다. 정보화를 추진함에 있어 정확한 개선 분야의 식별이 가능하고, 환류를 통해 보완될 사항들이 점검되며 향후 정책방향 도출이 체계적으로 이루어져야 한다. 이에 본 연구는 국내외 주요 수준평가 모델 분석과 정보화 수준평가 이론에 대한 선행연구를 통해 워크숍 및 전문가 토의를 거쳐 군 조직의 특성을 체계적으로 반영하는 수준평가 프레임워크 및 지표 개발 사례를 소개한다. 본 연구를 통해 개발된 정보화 수준평가 프레임 워크는 작전사급 이상의 부대를 대상으로 한 파일럿 테스트로 측정 가능성 및 실효성을 검증하였다. 본 연구의 수준평가 프레임워크를 통해 우리 군의 정보화 수준을 객관적으로 진단함으로써 한정된 예산과 자원을 적시 적소에 투입하고 정보화 분야별 취약점을 보다 신속하게 개선할 수 있을 것으로 기대된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.