• Title/Summary/Keyword: Process order

Search Result 19,987, Processing Time 0.051 seconds

Contact oxide etching using $CHF_3/CF_4$ ($CHF_3/CF_4$를 사용한 콘택 산화막 식각)

  • 김창일;김태형;장의구
    • Electrical & Electronic Materials
    • /
    • v.8 no.6
    • /
    • pp.774-779
    • /
    • 1995
  • Process optimization experiments based on the Taguchi method were performed in order to set up the optimal process conditions for the contact oxide etching process module which was built in order to be attached to the cluster system of multi-processing purpose. In order to compare with Taguchi method, the contact oxide etching process carried out with different process parameters(CHF$_{3}$/CF$_{4}$ gas flow rate, chamber pressure, RF power and magnetic field intensity). Optimal etching characteristics were evaluated in terms of etch rate, selectivity, uniformity and etched profile. In this paper, as a final analysis of experimental results the optimal etching characteristics were obtained at the process conditions of CHF3/CF4 gas flow rate = 72/8 sccm, chamber pressure = 50 mTorr, RF power = 500 watts, and magnetic field intensity = 90 gauss.

  • PDF

Unit Process Scheduling System Development and Calculation and Control Method of Planned Leadtime Using Multiple Linear Regression under Make to Order Manufacturing System in Transformer Winding Process (변압기 권선공정에서의 수주 제작품의 단위공정 일정관리 시스템 개발과 다중회귀분석을 이용한 계획 리드타임 산출 및 관리 방안)

  • Kang, Dae-Wan;Kang, Chang-Wook;Kang, Hae-Woon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.3
    • /
    • pp.117-124
    • /
    • 2008
  • Ultra-high voltage transformer industry has characteristic of small quantity batch production system by other order processing unlike general mass production systems. In this industry, observance of time deadline is very important in market competitive power security and company continued existence. The transformer winding is a process that rolls a coil is coated with an electric insulation material in order to generate the required voltage using the voltage fluctuation. The winding process is very important production process in the extra-high voltage transformer manufacturing industry because winding process is core process that occupy weight about half of whole process and is process that decide current ratio of transformer. This paper proposes a statistical calculation and control method of planned leadtime on the basis of real data and informations for the A company in transformer winding process. Moreover, we develop unit process scheduling system.

Development of An Optimal Layout Design System in Multihole Blanking Process

  • Lee, Sun-Bong;Kim, Dong-Hwan;Kim, Byung-Min
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.5 no.1
    • /
    • pp.36-41
    • /
    • 2004
  • The blanking of thin sheet metal using progressive dies is an important process on production of precision electronic machine parts such as IC leadframe. This paper summarizes the results of simulating the progressive blanking process by means of LS/DYNA. In order to verify the influence of blanking order on the final lead profile and deformed configuration, simulation technique has been proposed and analyzed using a commercial FEM code, LS/DYNA. The results of FE-simulations are in good agreement with the experimental result. After then, to construct rule base in progressive blanking process, FE-simulation has been performed using a simple model. Based on this result rule base is set up and then the blanking order of inner lead is rearranged. Consequently, from the results of FE-simulation using suggested method in this paper, it is possible to predict the shift of lead to manufacture high precision lead frame in progressive blanking process. The proposed method can give more systematic and economically feasible means for designing progressive blanking process.

Exploratory Analysis to Investigate the Process Effectiveness of IT Convergence based Service Industry Model (IT융합 서비스 산업 모델의 프로세스 효과성 탐색)

  • Han, Hyun-Soo;Moon, Tae-Eun
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.4
    • /
    • pp.227-242
    • /
    • 2012
  • It is a daunting task to theorize the process effectiveness of IT convergence based service model. Despite the criticalness of investigating process enhancement impact of IT-convergence based service model, the theoretical research in this field is relatively scarce, possibly due to the too wide and comprehensiveness of research scope. In this vein, we conducted exploratory study to understand the contributional impact of IT convergence based service model on resolving service process limitations. We first identified five IT convergence based service models in the area of typical service industry, which include entertainment, learning, location based services, tourism, and healthcare. Our research model classified value creation factors of the IT convergence model in twofold. The one is defined as basic value creation factor of the IT convergence, which is treated as the second-order factor that consists of two first-order factors of mobile functionality and Internet with digital contents merging functionality. The other is defined as service process limitations resolving factor which are comprised with the two first-order factors of simultaneousity and perishability. Both the second-order factors are modeled, each respectively, with the two first-order factors in formative manner. Using PLS, empirical validation is executed to analyze each value creating factor's contribution impact on the relative advantage, as well as the mediating effect of basic value creation factor on resolving service process limitations. On the basis of the insights revealed from this paper, further theory building research could be elaborated in the area of IT convergence applications for service industry.

Finite Element Analysis of the Unconstrained Cylindrical Bending Process Considering Continuous Contact Treatment (연속 접촉 처리를 고려한 실린더 벤딩 성형 공정의 유한요소해석)

  • Kim T. J.;Yang D. Y.
    • Transactions of Materials Processing
    • /
    • v.14 no.6 s.78
    • /
    • pp.547-552
    • /
    • 2005
  • In general, the sheet metal and die are described by finite elements for the simulation of the metal forming processes. Because the characteristics as continuum of the sheet metal are represented with triangles and rectangles, the errors occur inevitably in finite element analysis. Many contact schemes to describe the deformation modes exactly have been introduced in order to decrease these errors. In this study, a scheme for continuous contact treatment is proposed in order to consider the realistic behavior of contact phenomena during the forming process. The discrete mesh causes stepwise propagation of contact nodes of the sheet even though the contact region of the real forming process is altered very smoothly. It gives rise to convergence problem in case that the process, for example bending process, is sensitive to the contact between the sheet and the tools. The analysis of the unconstrained cylindrical bending process without blank holder is also presented in order to investigate the effect of the proposed algorithm.

Development of Optimal Layout Design System in Multihole Blanking Process (Multihole 블랭킹 가공시 최적 레이아웃 설계시스템의 개발)

  • 정성재;김동환;김병민;전영학
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.3
    • /
    • pp.35-41
    • /
    • 2003
  • The multihole blanking of thin sheet metal using progressive die set is an important process on production of precision electronic machine parts such as IC leadframe. In this paper, in order to investigate the influence of blanking order on the final lead profile and deformed configuration, simulation technique for progressive blanking process is proposed and analyzed by LS-DYNA. The results of FE-simulations are in good agreement with the experimental results. Consequently, from the results of FE-analysis based on the procedure proposed in this paper, it is possible to predict the deformation of lead and to manufacture high precision leadframes in progressive blanking process and these results might be used as a guideline to develop layout design system in multihole blanking process.

Analysis of Warehouse Logistics System for Maximizing the Amount of Order Process (주문 처리 최대화를 위한 창고 물류시스템 분석)

  • Lee, Do-Kyung;Chang, Sung-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.1
    • /
    • pp.86-95
    • /
    • 2013
  • The distribution cost increases constantly because of the growth of yield, globalization of accounts and the generalization of e-commerce. This paper is concerned with scheduling on the allocation of workers to maximize the amount of order process in warehouse logistics system. The problem is to determine the number of operators in each process by the sequential time zone. We considered that the number of operators is restricted to the current level and also the process time is changed by putting some resources into the process. In each stage, we suggest some considerations for the allocation of workers and estimate the maximum amount of order process of the alternatives. We analyzed the alternatives using simulation s/w Arena with real cases.

A Hierarchical Expert System for Process Planning and Material Selection (공정계획과 재료선정의 동시적 해결을 위한 계층구조 전문가시스템)

  • 권순범;이영봉;이재규
    • Journal of Intelligence and Information Systems
    • /
    • v.6 no.2
    • /
    • pp.29-40
    • /
    • 2000
  • Process planning (selection and ordering of processes) and material selection for product manufacturing are two key things determined before taking full-scale manufacturing. Knowledge on product design. material characteristics, processes, time and cost all-together are mutually related and should be considered concurrently. Due to the complexity of problem, human experts have got only one of the feasilbe solutions with their field knowledge and experiences. We propose a hierarchical expert system framework of knowledge representation and reasoning in order to overcome the complexity. Manufacturing processes have inherently hierarchical relationships, from top level processes to bottom level operation processes. Process plan of one level is posted in process blackboard and used for lower level process planning. Process information on blackboard is also used to adjust the process plan in order to resolve the dead-end or inconsistency situation during reasoning. Decision variables for process, material, tool, time and cost are represented as object frames, and their relationships are represented as constraints and rules. Constraints are for relationship among variables such as compatibility, numerical inequality etc. Rules are for causal relationships among variables to reflect human expert\`s knowledge such as process precedence. CRSP(Constraint and Rule Satisfaction Problem) approach is adopted in order to obtain solution to satisfy both constraints and rules. The trade-off procedure gives user chances to see the impact of change of important variables such as material, cost, time and helps to determine the preferred solution. We developed the prototype system using visual C++ MFC, UNIK, and UNlK-CRSP on PC.

  • PDF

Analysis of sewage treatment process for the improvement of T-N removal process (T-N 제거공정 개선을 위한 하수처리장 공정 분석)

  • Shin, Choon Hwan
    • Journal of Environmental Science International
    • /
    • v.27 no.2
    • /
    • pp.99-107
    • /
    • 2018
  • In order to design the improvement process for T-N removal, the treatment process of Suyoung, Gangbyeon, and Noxan sewage treatment plants (STP) in Busan was anlayzed. Suyoung STP shows a T-N removal efficiency of about 69.8% with MLE(Modified Ludzack ettinger) and A2O+MBR. However, it is necessary to improve the process to maintain over DO of 1 mg/L and is required to install a flow control tank to minimize the rainfall effect. Gangbyun STP shows a about 70.2% T-N removal efficiency with A2O+GFF(gravity fiber filtration). However, in order to improve T-N removal efficiency, it is needed to install MLE process to treat recycle water. Noksan STP shows a T-N removal efficiency of about 71.0% with MLE+Chemical treatment and shows stable T-N concentration in effluent. However, it is required a toxic chemical management process because bad wastewater flows into the STP, also is necessary a process improvement in order to increase internal recycling ratio. Especially, it is required a process improvement to increase HRT of nitrification tank because Suyoung and Gangbyeon STPs shows low nitrification efficiency during winter season.

Finite Element Analysis of the Extrusion Process for an Automobile Bumper (자동차용 범퍼 압출 공정의 유한요소해석)

  • Kim, Kwang-Heui;Yoon, Moon-Chul
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.4 no.1
    • /
    • pp.24-29
    • /
    • 2005
  • The development of an aluminum bumper is required in order to reduce the weight of the automobile. An porthole die extrusion process is simulated by the finite element method in order to develop the aluminum bumper which is manufactured by hollow section extrusion. The general-purpose finite element analysis software is used. The developed analysis method can be applied to the optimization of the porthole die extrusion process for the aluminum bumper.

  • PDF