• Title/Summary/Keyword: Process management

Search Result 16,440, Processing Time 0.052 seconds

Technical Management Planning Process of Engineering Project (개발 프로젝트의 기술관리 계획 프로세스)

  • Yoo, Il Sang;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF

A Idea Development Method for Process Innovation (경영혁신을 위한 과제 도출 방안)

  • Kim, Seong-Su
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.289-297
    • /
    • 2006
  • Business operates under the fast pace of large-scale changes. These changes occur in environments including competitors, markets and consumers. To survive under these changes, process innovation is becoming the eminent issue faced by executives. Process innovation is to generate, select, and implement new ideas adopting changes in organizational structure, management pattern, human resource management systems and so on. Examples include restructuring, outsourcing, benchmarking, total quality management, and business process reengineering. This study suggests how to develop process innovation ideas. Related screening and implementation techniques are also presented.

  • PDF

An Example of ISO 9001 Quality Management System based on BPM (BPM을 기반으로 한 ISO 9001 품질경영시스템 구축)

  • Kim Sang-Kuk;Shin Sung-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.4
    • /
    • pp.38-45
    • /
    • 2006
  • Most organizations adopt a process-based approach to manage their operations and now business process management(BPM) is a well-established concept. Because ISO 9001:2000 has been influenced by BPR and it also emphasizes process based, BPM can get together with ISO 9001:2000. Korea Institute of Science and Technology Information has taken ISO 9001:2000 certificate in November 11, 2003 and has implemented quality management systems based on BPM. We call it KQMS(KISTI Quality Management System). KQMS based on BPMS is a new example in field of ISO quality management and is expected to support process management well.

  • PDF

Version Management of Business Processes Managed by BPM (BPM에서 관리되는 업무 프로세스의 버전관리)

  • Cho, Eunmi;Bae, Hyerim
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.2
    • /
    • pp.126-132
    • /
    • 2006
  • Recently, business environments have been changing quickly. To establish competitive advantage, most enterprises have been using information systems such as Enterprise Resource Planning (ERP), Supply Chain Management (SCM) and Customer Relationship Management (CRM). Many consider Business Process Management (BPM) a new innovative solution for enterprise-wide processes. As the BPM system is used more widely and matures, new techniques and functions will be developed by commercial vendors. However, they mainly focus on correctly executing process models, and user convenience has not been considered. In this paper, we have developed a new method of designing business processes, which provides users with an easy modeling interface. The method is based on version management. Version management of a process enables a history of the process model to be recorded. In order to prevent wasted storage, not all of the process versions are stored. An initial version and changes to each process are stored by automatically detecting changes. Our method enhances the convenience of the modeling business processes and thus helps the process designer. A prototype system is presented to verify the effectiveness of our method.

Fraud Risk Management Model: A Content Analysis Approach

  • MADAH MARZUKI, Marziana;NIK ABDUL MAJID, Wan Zurina;AZIS, Nur Kamaliah;ROSMAN, Romzie;HAJI ABDULATIFF, Nik Kamaruzaman
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.10
    • /
    • pp.717-728
    • /
    • 2020
  • The objective of this study is to explore the whole process of fraud risk management strategies that should be implemented by the organizations. Secondly, this study discusses the governance issues that arise at each stage of the process. For the purpose of this study, a content analysis of previous literatures is used as a technique for gathering data. This process usually involves codifying qualitative and quantitative information into pre-defined categories in order to derive patterns in the presentation and reporting of information. Based on our content analysis, we found that the fraud risk management process should be made of at least five stages which are inculcating the culture of managing risks in an organization, identifying the risks, evaluating the risks, determining preventive actions and implementing and reviewing stages. Our extended analysis of the fraud risk management process finds that a lot of governance issues arise in the fraud risk management process that should be solved by regulators and companies in order to ensure that fraud risk management process is embedded as corporate culture, not merely as a process. Among them are how to create the risk culture in an organization and whether auditors and risk management committees identify risks from each available source.

Development of Web-based Process Management System for Spatial Data Construction (웹기반의 공간데이터 구축공정 관리시스템 개발)

  • Choi, Byoung-Gil;Kim, Sung-Soo;Cho, Kwang-Hee
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.3 s.37
    • /
    • pp.63-70
    • /
    • 2006
  • This study aims to development of web-based process management system for spatial data construction. For developing this system work classification of basic surveying was standardized and quality management method for spatial data was established. Production process and work classification system for basic surveying such as control point surveying using GPS, leveling, aerial photographing, digital mapping, topographic mapping, digital elevation modeling, aerial photographic DB construction and digital orthophotomap was standardized. The status of the output and quality inspection for basic surveying project were analyzed, and the elements of quality inspection and data format for the type of outputs were analyzed. Based on standardized and analyzed contents, web-based process management system was developed after database and process was designed. The process management system consisted of process management, quality control, metadata management, and system management.

  • PDF

An Exploratory Study on the Organizational Knowledge Discovery Process (조직지식 창출프로세스에 관한 탐색적 연구)

  • Kim, Sun-A;Kim, Young-Gul
    • Knowledge Management Research
    • /
    • v.1 no.1
    • /
    • pp.91-107
    • /
    • 2000
  • This paper proposes the Organizational Knowledge Discovery Process Model (OK-DPM) as an initiative for developing a knowledge management methodology. OK-DPM is a model designed to effectively discover knowledge useful to the organization. It explains the knowledge discovery process from the conceptual level to the application level. It decomposes the organizational knowledge discovery process into 3 sub-processes; Creation, Suggestion and Validation. For each sub-process, design components are identified and possible methods for supporting each one are suggested. Also, the relationship patterns between the knowledge discovery process and knowledge type are explored. By applying OK-DPM to two real cases where the knowledge management projects are ongoing, the model was validated and revised. Even though we need to investigate with more cases to refine the OK-DPM, we found that it could provide some insights in developing the effective knowledge discovery process.

  • PDF

A Study on Prototype of Just In Time Production Management System (적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 -)

  • Lee, Kyoo-Hyun;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

A Study on the Impact of IT and SCM Process Management Capability on e-SCM Performance (IT와 SCM 프로세스 관리역량이 e-SCM 성과에 미치는 영향에 관한 연구)

  • Lee, Sun-Ro;Kim, Ki-Young
    • Asia pacific journal of information systems
    • /
    • v.17 no.3
    • /
    • pp.79-103
    • /
    • 2007
  • The main purpose of this study is to define antecedents that influence e-SCM synchronization and to investigate how it affects e-SCM performance. We, therefore, investigate (1) the impact of firms' internal IT planning capabilities on e-SCM synchronization and on SCM process management capability, (2) the impact of firms' internal IT infrastructure on e-SCM synchronization and on SCM process management capability, (3) the impact of firms' internal SCM process management capabilities on e-SCM synchronization, and finally (4) the impact of e-SCM synchronization on SCM performance. A survey has been administrated to the firms' SCM and marketing staffs and 171 returns analyzed. The results show that (1) IT plan has not direct impacts on e-SCM synchronization, but has direct impacts on organizational support, purchasing, and operations processes except logistics process. IT plan, however, has indirect impacts on e-SCM synchronization through purchasing and operations of SCM process management capability. (2) IT infrastructure has both direct and indirect effects on e-SCM synchronization, and also has direct impacts on organizational support, purchasing, and operations processes except logistics process. (3) SCM process management capabilities have direct impacts on e-SCM synchronization. Among these SCM core processes purchasing positively influences operations, which in turn positively influences logistics process management capability. (4) e-SCM synchronization has positive impacts on SCM performance indicator (SCOR), such as delivery reliability, responsiveness & flexibility, and cost. These results indicate that e-SCM synchronization can be critical to achieve better internal performance like cost and external performance like delivery reliability, responsiveness & flexibility of firms' SCM. In sum, this study demonstrates that the intervening role of e-SCM synchronization between e-SCM performance and IT management capability and between e-SCM performance and SCM core process management capability has been significant in achieving better e-SCM performance. Therefore, it can be suggested that e-SCM performance should be accomplished in consequence of the acceleration of e-SCM synchronization through the enhancement of preceding factors for the e-SCM synchronization.