R In today's competitive and global business management, Concern of an enterprise is to strengthen the core competency and improve it's internal business process. Therefore, Interest in BPM(Business Process Management) has grown rapidly. BPM is recognized as best solution to meet the needs of organizations that seek the cost down, integration of information, reducing of risk, improvement of productivity. In the past, the company have usually made huge investments in knowledge management systems which are based on repository keeping tacit knowledge. But this paper shows feasibility of implementation of business process-based knowledge management system that could link knowledge with business process. From an academic point of view, Although There could be several ways to build the business process-based KMS. In this paper, when BPM project and KMS project were started at the same time, the way of how to provide workers with task-related knowledge was discussed. As an case study, an estimate process of H company was analyzed and process modelling was carried out and conceptional architecture framework was depicted.
With the recent changes in the environment of weapon systems acquisition, the systems development is becoming more susceptible to a variety of risks. To cope with this situation, US DoD has been emphasizing the importance of constantly applying the test and evaluation (T&E) process throughout the whole life cycle of the weapon systems. In particular, the safety requirements are called for attention while dealing with system risks. To this end, the present paper is aimed at studying the T&E process which incorporates the systems safety in weapon systems development. Analyzing and modeling the relevant processes has made it possible to achieve the objective. As a case study, the model results were applied to the development of unmanned aerial vehicles.
Recently, we have witnessed the definitely negative impacts of large-scale accidents happened in such areas as atomic power plants and high-speed train systems, which result in increased fear for the potential danger. The problems appear to arise due to the deficiency in the design of large-scale complex systems. One of the causes can be attributed to the design process that does not fully reflect the safety requirements in the early stage of the system development because of the substantially increased complexity. In this paper, to enhance the systems safety an integrated process is studied, which considers simultaneously both the system design process and system safety process from the beginning of the system development. In the conceptual system design phase an integrated process model is constructed by analyzing the activities of both the system design and safety processes. As a case study example, an inner city train system is described with the application of the developed process. The computer simulation of the example case is followed by the result discussed. The results obtained in the paper are expected to be the basis for the future study where a detailed process and its associated activities can be developed.
Kim, Kyu-Ri;Kim, Ae-Kyung;Kim, Sang-Kuk;Jung, Jae-Yoon
IE interfaces
/
v.25
no.1
/
pp.71-78
/
2012
Most manufacturing companies participate in various types of active collaboration to enhance competitive advantages in their arenas. In this paper, we introduce a data warehouse system that is designed for manufacturing collaboration. Just as enterprise information systems, collaboration support systems also need functions of performance measurement and monitoring. For this reason, we devise a new approach to measuring and evaluating performance of manufacturing collaboration. Specifically, we first present a concept of process warehouses for manufacturing collaboration. Next, we design a data schema of collaborative process warehouses to store and monitor collaboration performances. Finally, we implement a prototype system to support performance management of manufacturing collaboration. The proposed system can be used to effectively maintain and continuously improve collaboration in manufacturing industry.
As the utilization of information technology and the turbulence of technological change increase in organizations, the adoption of IT outsourcing also grows to manage IT resource more effectively and efficiently. In this new way of IT management technique, service level management(SLM) process becomes critical to derive success from the outsourcing in the view of end users in organization. Even though much of the research on service level management or agreement have been done during last decades, the performance of the service level management process have not been evaluated in terms of final objectives of the management efforts or success from the view of end-users. This study explores the relationship between SLM maturity and IT outsourcing success from the users' point of view by a analytical case study in four client organizations under an IT outsourcing vendor, which is a member company of a major Korean conglomerate. For setting up a model for the analysis, previous researches on service level management process maturity and information systems success are reviewed. In particular, information systems success from users' point of view are reviewed based the DeLone and McLean's study, which is argued and accepted as a comprehensively tested model of information systems success currently. The model proposed in this study argues that SLM process maturity influences information systems success, which is evaluated in terms of information quality, systems quality, service quality, and net effect proposed by DeLone and McLean. SLM process maturity can be measured in planning process, implementation process and operation and evaluation process. Instruments for measuring the factors in the proposed constructs of information systems success and SL management process maturity were collected from previous researches and evaluated for securing reliability and validity, utilizing appropriate statistical methods and pilot tests before exploring the case study. Four cases from four different companies under one vendor company were utilized for the analysis. All of the cases had been contracted in SLA(Service Level Agreement) and had implemented ITIL(IT Infrastructure Library), Six Sigma and BSC(Balanced Scored Card) methods since last several years, which means that all the client organizations pursued concerted efforts to acquire quality services from IT outsourcing from the organization and users' point of view. For comparing the differences among the four organizations in IT out-sourcing sucess, T-test and non-parametric analysis have been applied on the data set collected from the organization using survey instruments. The process maturities of planning and implementation phases of SLM are found not to influence on any dimensions of information systems success from users' point of view. It was found that the SLM maturity in the phase of operations and evaluation could influence systems quality only from users' view. This result seems to be quite against the arguments in IT outsourcing practices in the fields, which emphasize usually the importance of planning and implementation processes upfront in IT outsourcing projects. According to after-the-fact observation by an expert in an organization participating in the study, their needs and motivations for outsourcing contracts had been quite familiar already to the vendors as long-term partners under a same conglomerate, so that the maturity in the phases of planning and implementation seems not to be differentiating factors for the success of IT outsourcing. This study will be the foundation for the future research in the area of IT outsourcing management and success, in particular in the service level management. And also, it could guide managers in practice in IT outsourcing management to focus on service level management process in operation and evaluation stage especially for long-term outsourcing contracts under very unique context like Korean IT outsourcing projects. This study has some limitations in generalization because the sample size is small and the context itself is confined in an unique environment. For future exploration, survey based research could be designed and implemented.
Journal of the Korean Society of Systems Engineering
/
v.8
no.1
/
pp.9-19
/
2012
The Light Rail Transit Project is a large scaled project which takes several years in building a system. After construction, LRT system is operating for several tens of years. For these characteristics, the right application of systems engineering to LRT project greatly effects the project success. In this paper, we present systems engineering application model to LRT project i.e. SELRT which include systems engineering technical process, core technology management process, project support process. SELRT also has a module for the exchange of outputs in SE tool and PM tool. Systems engineering processes in SELRT mainly base on ISO/IEC 15288. In future, we expand the range of SE processes and improve the usability in SELRT. We expect that this model will contribute to improve the efficiency in LRT project and to success the LRT project.
Journal of Korean Society of Industrial and Systems Engineering
/
v.33
no.3
/
pp.93-101
/
2010
Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to product development projects and introduces the application cases. This product development project management process model is composed of five top processes of initiation and preparation, planning, implementation management, control, and termination and transfer. The five processes are re-divided into 18 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. This model is applied to the new car development project of a Korean automobile company and introduces the cases, which shows a project charter, a work breakdown structure, a project schedule, a progress s-curve, a risk register, and a performance report.
Recently, knowledge management becomes a core management tool for efficient and effective organizations. However, there are little known researches on measuring knowledge management level. The objective of this paper is to develop a process capability model for knowledge management of an organization. We developed 5 stage process capability model for knowledge management. The 1st stage is the initial stage where no significant knowledge management activity is performed. The 2nd stage is the performed stage where planning and tracking activities are performed on organization level. The 3rd stage is the established, and the 4th stage is the predictable stage where processes and results of knowledge management can be predictable. Final stage is the optimizing stage where knowledge management process is continuously improved at an organizational level. We surveyed 37 korean companies to test the validity of the proposed stage model. Statistical tests show that the developed stage model of knowledge management is valid and sound in general conditions. The result of this study on process capability model can be a solid stepping stone for future works in this area.
Recently, ERP system is used as a important tool of management innovation for enterprise's survival and development. It is very important to recognize how much influence to organizational performance through ERP system implementation. The purpose of this study is to find out the impact of environmental, organizational, information systems characteristics on successful implementation of ERP systems in Korean SMEs(Small and Medium Enterprises). From previous researches on ERP adoption and implementation, 7 independent variables (competitiveness, government support, top management support, process innovation, project management, IS maturity, and ERP customizing), and 1 dependent variables (successful implementation of ERP systems) are identified. 3 questionnaires were removed from the study because of missing or inappropriate responses, and final samples are 91 SMEs. The results of hypothesis testing show that determinants of successful implementation of ERP systems are top management support and IS maturity. Five variables such as competitiveness, government support, process innovation, project management, and ERP customizing do not significantly influence to successful implementation of ERP systems. The contribution of this study is that it provides an empirical evidence of the causal relationship between ERP adoption factor and ERP success. This study showed that top management support and IS maturity are essential to accomplish successful ERP implementation for SMEs.
Recently, several attempts have been made to introduce the process concept to knowledge management (KM) or the knowledge concept to business process management (BPM) in order to combine the advantages of the two approaches. However, clear description about their interrelationship or a comprehensive framework to combine them has not been provided. This paper explores how KM and BPM can complement each other and proposes a framework to integrate the two paradigms. The concept of process knowledge proposed by this paper focuses on the importance of business processes as knowledge, which is overlooked by existing KM or BPM research efforts. The paper proposes a framework that combines and extends the functionalities of existing knowledge management systems (KMSs) and business process management systems (BPMSs) by identifying the functionalities required to manage process knowledge from the lifecycle perspective of both knowledge management and business process management. A prototype system is also presented to demonstrate the feasibility of the proposed framework.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.