A Predictive Model for the Number of Potholes Using Basic Harmony Search Algorithm (하모니 검색 알고리즘을 이용한 포트홀 발생 개수 예측 모형)

  • Kim, Dowan;Lee, Sangyum;Kim, Dongho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.150-158
    • /
    • 2014
  • A bunch of asphalt roads have been damaged frequently in relation to the rapid climate change. To solve and prevent this type of problems, many nationalities in the world have performed various researches. In this regard, the objective of this study is to develop prediction model as to the number of potholes occurred in seoul. At the same time, we have utilized empirical and statistical approaches in order for us to identify factors which is affecting the actual occurrence. The predictive model was determinded by using BHS (Basic Harmony Search) algorithm. Prediction was based on the weather and traffic data as well as data occurrence data of porthole. To assess the influences which are PAR(Pitch Adjusting Rate) and HMCR(Harmony Memory Considering Rate), we determined suitability by changing the values. In the process of the determining a predictive model, the predictive model composed Training data (2011, 2012 and 2013yrs data). To determine the suitability of the model, we have utilized Testing Set (2009 and 2010 yrs data). The suitability of the basic prediction model has been from RMSE(Root Mean Squared Error), MAE(Mean Absolute Error) and Coefficient of determination.

A VE Incentive System for Construction Industry (건설VE 인센티브 제안)

  • Song, Yong-Chul;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1019-1022
    • /
    • 2007
  • Recent construction projects are becoming larger, more complex and higher rising. Accordingly, necessity of the VE is emphasized as more suitable for expense, function and quality. However, the VE is not functional because of difficulty of application process or of the methods in use in the field of construction. One of the alternative is to introduce the incentive system to activate the VE in the field of construction. By using the incentive system, employers can reduce the relevant project's prime cost and builders will maximize profit creation. In domestic case, they presented the systematic support policy 'Technical development compensation system' which is similar to the 1992 American's VE incentive system about builder's technical development effort but the result was not positive. This study investigates both domestic and other country's construction VE incentive system and reported problems in the construction VE incentive system to executives and construction VE experts. From this survey, conclusions were drawn about problems in the domestic construction VE incentive system's similarity system: 'Insufficiency of the construction VE incentive's article and standards', 'Insufficiency of the appraiser of the construction VE and of the full charge department' etc. I had interviews with the experts of the construction VE which were based on the above-mentioned problems and then presented 'Improvement of the construction VE's incentive system relevant law and system', 'Construction VE experts and construction formation' etc. for ways to bring acceptance of the construction VE in the construction industry.

  • PDF

Developing Aged-Housing Remodeling Technology for Improving Structural and Equipment performance;Introduction of Center for Aged-housing Remodeling Technology (노후 공동주택 구조 및 설비성능개선 기술 개발;2차년도 실적 및 차년도 연구계획 소개)

  • Han, Ju-Yeoun;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.190-196
    • /
    • 2007
  • As the number of aged-housing has been rapidly increased, many kinds of defects and problems such as degeneration of housing environment, structural performance, and equipment performance have been appeared. The reconstruction as the way to improve the aged-housing has been used mostly because the legal process of the reconstruction is relatively easy. On the other hand, it has caused problems such as the lack of natural aggregates, the environmental damages owing to construction wastes, the loss of national resources, and the lack of the housing for rent nearby the reconstruction area. This problems limit active tying into the reconstruction business at present in the industrial and political perspective. In this context, it is necessary to revitalize the remodeling rather than the reconstruction. In order to reach this objective, this research aims at identifying the user-oriented performance for the housing and deducing the core technology. It is expected that the result of this research can contribute to more revitalize the remodeling as tying researches in terms of design, structure, equipment, and construction.

  • PDF

A Analytical Study on Governmental Regulation for the Promotion of Construction Technology Development (건설기술개발 촉진과 연계된 제도분석 연구 - PQ 기술개발평가항목과 특허출원추이와의 비교분석을 중심으로 -)

  • Kim, Jae-Wook;Kim, Sang-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.140-153
    • /
    • 2008
  • The recent stagnation of construction market draw more attention to construction technology development which is believed to be playing a important role in increasing the competitiveness of the construction industry. Thus, increasing pressures has been on the government playing a catalytic role of strengthen technology competitiveness. Hereupon, this study analyzed technology skill evaluation items of the Pre-Qualification system to facilitate construction technology development at the national level and tried to show the correlation between the PQ system and patent application through multilateral analysis of patent applications. Analysis results are intended to provide basic reference in decision-making process related to governmental regulation improvement especially on the PQ system. This research also attempted to draw implications to increase the use of technology related regulations such as patent & utility model based on PQ system analysis results. To do so, a comprehensive trend Analysis on the PQ system has been conducted from the view points of construction technology. Similar analysis has been done with the patent system & Utility model system. Based on Analysis result, implications of regulation improvements was outlined to promote construction technology development, due to eventually increase the competitiveness of Korean construction industry.

A study on the Feasibility Analysis factor Model for Housing Development Projects (주택개발사업의 사업성분석인자 모델에 관한 연구;사업성 분석인자의 중요도 분석 및 타당성 검증을 증심으로)

  • Hong, Yeong-Geon;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.249-254
    • /
    • 2007
  • The main bodies of housing markets of today need to carry out a systematic and objective feasibility analysis even from the step of planning in order to succeed in a diverse and complex market environment. Therefore, it is meaningful to understand this housing market environment and propose a necessary model for the feasibility analysis of hosing business. In this vein, the aim of this study was to extract an actual and practical feasibility analysis factor and its importance for housing market, and then present and apply a feasibility analysis factor model to an on-site example, in order to verify the model's validity. For this, the investigator interviewed with and carried out a questionnaire survey of experts in housing development projects. Study findings are as follows:First, the feasibility analysis factor, derived in this study, could provide a ground to evaluate the feasibility of subject projects in the planning of development through an analysis index. Second, when feasibility is under the level of carrying out the projects, it is possible to reexamine the projects through extracting analysis factors of which points are under the standard and via a feedback process for improvable analysis factors. Therefore, the result of applying the feasibility analysis model of this study to actual housing development projects analytically shows that the model could provide a practical evaluation criterion to the person in charge of project development through an analysis index.

  • PDF

Cost Estimating method for the Public Office building at the early stage (공공건축물의 초기공사비 산정방법 연구)

  • Koo, Won-Yong;Kim, Jung-Gon;Lee, Jun-Seok;Park, Hyeong-Geun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.261-266
    • /
    • 2007
  • In this research, we studied an estimating method in client's sight to estimate the total construction cost which is based on the historical cost data at the early stage of the office buildings as a public phase. It is very difficult to analyze the estimation accurately and logically. When a client estimates a project, he/she has to consider there are many issues at the planning step, according as office buildings become gradually diversified as well as their roles continuously extended. Therefore, those are usually make problems for wasting the budget in accordance with the cost estimation errors. Moreover, many kinds of public construction projects, especially such as school, office, sports complex, and the others, have been invested the private finances defined as BTL(Build Transfer Lease) method that are required to manage the detailed process more strictly from initial planning. In order to make an effective planning, the long-term users amount and the building life cycle at the beginning of project should be considered previously and then it may enable to achieve an appropriate project plan. But actually considering overall variables in a building planning is impossible. Accordingly, suggesting a regression model based on the historical cost data from many similar types of office building to support client's role known as estimating the total cost at the early stage. And then performing the test against the proposed model to research the reasonability as using the historical cost data of Japan office buildings.

  • PDF

A Framework Integrating Cost and Schedule based on BIM using IFC (IFC활용 BIM기반 공정/원가 통합관리 프레임워크)

  • Lee, Jin-Gang;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.53-64
    • /
    • 2013
  • In building construction project, there are numerous information or data parts across many different software applications and professional specialists. BIM (Building Information Modeling), as a medium for managing information generated during construction project, it is intended to enhance the effectiveness of construction management and reap a lot of advantages such as, automatic quantity takeoff, error-free estimation, 4D(3D+Time), 5D(4D+Cost) simulation. Nevertheless, the overall and practical effectiveness of BIM utilization is difficult to justify at this stage. While helpful, there are some limitation when BIM applied to construction management due to the differences of data processing process between BIM and work in the field, limitations of information generated from BIM object and interoperability problem among BIM application. Therefore, this paper propose a framework integrating BIM with cost-schedule information using IFC. And we construct the system prototype based on the framework and performed case study to examine the framework. The proposed framework provides the information basis for BIM based cost-schedule integration. ultimately, the framework increase the utilization of BIM and work efficiency of construction industry by supporting an understanding of information.

A Study on Power Generation Efficiency through the Post Evaluation of Photovoltaic Panels in Complex Type Buildings - Focused on Annual Generation Performance of S-university - (단지형 건물군 내 태양광 패널의 사후 평가를 통한 발전 효율 연구 - S대학의 연간 발전 실적을 중심으로 -)

  • Kim, Heejin;Jung, Hyejin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.11-19
    • /
    • 2017
  • The purpose of this study is to analyze the efficiency of PV according to installation condition in the complex type buildings. For this purpose, annual performance of solar power generation in a certain area was investigated and various methods were conducted including post operation evaluation. In addition, we tried to find out influencing factors that affect the efficiency and sought to identify their relative impact of degree through the data analysis and site visits together. In the middle of this process we can draw up major considerations for the efficient photovoltaic power generation installation. In the mean while, previous studies are making something new related with method for efficiency enhancement and individual influential factors based on experimental environment rather than the empirical data site based. As a result of the study, it was confirmed that even if installed in the same area, the power generation efficiency is 1.5 times as high as the installation condition. Furthermore, statistical analyses were performed on azimuth, tilted angle and shade, which are variables affecting conversion efficiency, and it was statistically confirmed that all variables are meaningful factors that affect the conversion efficiency which is a dependent variable. The most influential factor is the azimuth, followed by the tilted angle and the shade factor. From this result, we expect to be able to provide installation guidelines for the solar power generation equipments on the rooftop zone.

Nexus based Quality Inspection Support Model for Defect Prevention of Architectural Finishing Works (하자예방정보 넥서스 기반 건축마감공사 품질점검 지원 모델)

  • Lee, Hye-Rin;Cho, Dong-Hyun;Park, Sang-Hun;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.59-67
    • /
    • 2017
  • At the completion of the construction, various finishing processes are concentrated. This imposes a burden on the on-site manager and imposes on experience based quality control, thereby causing deviations in the quality of construction depending on supervisor or worker's individual competence. In addition, the information related to quality control is frequently scattered in various types of documents such as specifications and drawings, and checkpoints are frequently omitted. It is necessary to provide a tool that can effectively provide the practitioner before or during the inspection work by systematically storing the information related to the defect prevention and linking them in a mutually referential state. This paper proposes an quality inspection support model that can systematically store necessary information on activity or room basis for the quality check of the apartment house finishing work. Establish a defect prevention information base and a information nexus by linking specifications, design standards, checklists, regulations, defect cases, and drawings to the finishing process and the rooms. Based on this, information registration and search interface are presented. It can contribute to securing a certain level of construction quality or more by suggesting a frame that can be utilized by linking various defects prevention information with the focus on closing activity and room.

Estimation Method of the Competitive Bid-price in Bid-rigging of Public Construction (기댓값 분석에 따른 공공공사 입찰담합의 가상경쟁가격 산정방법)

  • Jeong, Kichang;Kim, Wooram;Kim, Namjoon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.52-60
    • /
    • 2018
  • Korea's public construction projects are under construction through bidding, however, due to the nature of the bidding, collusion between participants can occur. The collusion of bids accordingly damages the client. So, it is necessary to calculate the appropriate fictitious competition price to compensate for this. In this regard, econometrics methods are generally used, but there are limitations and issues arising from the nature of construction, especially design-build bid. Therefore, this study proposes a method to estimate reasonable competitive bid-price in design-build bid. It derives the lowest bid-price from the design submitted by the proponent and estimates the competitive bid-price by examining the factors according to the penetration rate according to the technical level of the tester, the skill level of the competitor, and the type of tester. Based on the method proposed in this study, a reasonable price can be derived that reflects the characteristics of the design and construction bidding bidder selection method and also it can be used as a reference material in the actual bidding process as well as calculating the damage due to the answer.