• Title/Summary/Keyword: Probabilistic risk assessment

Search Result 295, Processing Time 0.029 seconds

Development of Fragility Curves for Slope Stability of Levee under Rapid Drawdown (수위급강하에 대한 제방 사면의 취약도 곡선 작성)

  • Cho, Sung-Eun
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.10
    • /
    • pp.27-39
    • /
    • 2023
  • To effectively manage flood risk, it is crucial to assess the stability of flood defense structures like levees under extreme flood conditions. This study focuses on the time-dependent probabilistic assessment of embankment slope stability when subjected to rapid water level drops. We integrate seepage analysis results from finite element analysis with slope stability analysis and employ Monte Carlo simulations to investigate the time-dependent behavior of the slope during rapid drawdown. The resulting probability of failure is used to develop fragility curves for the levee slope. Notably, the probability of slope failure remains low up to a specific water level, sharply increasing beyond that threshold. Furthermore, the fragility curves are strongly influenced by the rate of drawdown, which is determined through hydraulic analysis based on flood scenarios. Climate change has a significant impact on the stability of the water-side slope of the embankment due to water level fluctuations.

Development of comprehensive earthquake loss scenarios for a Greek and a Turkish city: seismic hazard, geotechnical and lifeline aspects

  • Pitilakis, Kyriazis D.;Anastasiadis, Anastasios I.;Kakderi, Kalliopi G.;Manakou, Maria V.;Manou, Dimitra K.;Alexoudi, Maria N.;Fotopoulou, Stavroula D.;Argyroudis, Sotiris A.;Senetakis, Kostas G.
    • Earthquakes and Structures
    • /
    • v.2 no.3
    • /
    • pp.207-232
    • /
    • 2011
  • The development of reliable earthquake mitigation plans and seismic risk management procedures can only be based on the establishment of comprehensive earthquake hazard and loss scenarios. Two cities, Grevena (Greece) and D$\ddot{u}$zce (Turkey), were used as case studies in order to apply a comprehensive methodology for the vulnerability and loss assessment of lifelines. The methodology has the following distinctive phases: detailed inventory, identification of the typology of each component and system, evaluation of the probabilistic seismic hazard, geotechnical zonation, ground response analysis and estimation of the spatial distribution of seismic motion for different seismic scenarios, vulnerability analysis of the exposed elements at risk. Estimating adequate earthquake scenarios for different mean return periods, and selecting appropriate vulnerability functions, expected damages of the water and waste water systems in D$\ddot{u}$zce and of the roadway network and waste water system of Grevena are estimated and discussed; comparisons with observed earthquake damages are also made in the case of D$\ddot{u}$zce, proving the reliability and the efficiency of the proposed methodology. The results of the present study constitute a sound basis for the development of efficient loss scenarios for lifelines and infrastructure facilities in seismic prone areas. The first part of this paper, concerning the estimation of the seismic ground motions, has been utilized in the companion paper by Kappos et al. (2010) in the same journal.

Development of Intelligent Database Program for PSI/ISI Data Management of Nuclear Power Plant (원자력발전소 PSI/ISI 데이터 관리를 위한 지능형 데이터 베이스 프로그램 개발)

  • Park, Un-Su;Park, Ik-Keun;Um, Byong-Guk;Park, Yun-Won;Kang, Suk-Chul
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.18 no.5
    • /
    • pp.389-397
    • /
    • 1998
  • For an effective and efficient management of large amounts of preservice/inservice inspection(PSI/ISI) data in nuclear power plants, an intellegent Windows 95-based data management program was developed. This program enables the prompt extraction of previously conducted PSI/ISI conditions and results so that the time-consuming data management, painstaking data processing and analysis in the past are avoided. The program extracts, and the associated remedies. Furthermore, additional inspection data and comments can be easily added or deleted for subsequent PSI/ISI operation. Although the initial version of the program was applied to Kori nuclear power plant, this program can be equally applied to other nuclear power plant. And also this program can be used to offer the fundamental data for application of evaluation data related to fracture mechanics analysis(FMA), probabilistic reliability assessment(PRA) of PSI/ISI results, performance demonstration initiative(PDI) and risk-informed ISI based on probability of detection(POD) information of ultrasonic examination. Besides, the program can be further developed as a unique PSI/ISI data management expert system that can be apart of PSI/ISI data management expert system that can be a part of PSI/ISI Total Support System(TSS) for Korean nuclear power plants.

  • PDF

Optimization of Contaminated Land Investigation based on Different Fitness-for-Purpose Criteria (조사목적별 기준에 부합하는 오염부지 조사방법의 최적화 방안에 관한 연구)

  • Jong-Chun Lee;Michael H. Ramsey
    • Economic and Environmental Geology
    • /
    • v.36 no.3
    • /
    • pp.191-200
    • /
    • 2003
  • Investigations on the contaminated lands due to heavy metals from mining activities or hydrocarbons from oil spillage for example, should be planned based on specific fitness-for-purpose criteria(FFP criteria). A FFP criterion is site specific or varies with situation, based on which not only the data quality but also the decision quality can be determined. The limiting factors on the qualities can be, for example, the total budget for the investigation, regulatory guidance or expert's subjective fitness-for-purpose criterion. This paper deals with planning of investigation methods that can satisfy each suggested FFP criterion based on economic factors and the data quality. To this aim, a probabilistic loss function was applied to derive the cost effective investigation method that balances the measurement uncertainty, which estimates the degree of the data quality, with the decision quality. In addition, investigation planning methods when the objectives of investigations do not lie in the classification of the land but simply in producing the estimation of the mean concentration of the contaminant at the site(e.g. for the use in risk assessment), were also suggested. Furthermore, the efficient allocation of resources between sampling and analysis was also devised. These methods were applied to the two contaminated sites in the UK to test the validity of each method.

Decision Making of Seismic Performance Management for the Aged Road Facilities Based on Road-Network and Fragility Curve (취약도곡선을 이용한 도로망기반 노후도로시설물 내진성능관리 의사결정)

  • Kim, Dong-Joo;Choi, Ji-Hae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.5
    • /
    • pp.94-101
    • /
    • 2021
  • According to the Facility Management System (FMS) operated by the Korea Authority of Land & Infrastructure Safety, it is expected that the number of aging facilities that have been in use for more than 30 years will increase rapidly to 13.9% in 2019 and 34.5% in 2929, and end up with a social problem. In addition, with the revision of "Common Application of Seismic Design Criteria" by the Ministry of Public Administration and Security in 2017, it is mandatory to re-evaluate all existing road facilities and if necessary seismic reinforcement should be done to minimize the magnitude of earthquake damage and perform normal road functions. The seismic performance management-decision support technology currently used in seismic performance management practice in Korea only determines the earthquake-resistance reinforcement priority based on the qualitative index value for the seismic performance of individual facilities. However with this practice, normal traffic functions cannot be guaranteed. A new seismic performance management decision support technology that can provide various judgment data required for decision making is needed to overcome these shortcomings and better perform seismic performance management from a road network perspective.