• Title/Summary/Keyword: Probabilistic reliability evaluation

Search Result 169, Processing Time 0.032 seconds

Evaluation of Highway Design Alternatives Based on Reliability Criterion for Traffic Safety (신뢰도 기준에 근거한 도로설계 대안에 대한 교통안전성 평가)

  • Oh, Heung-Un
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.186-196
    • /
    • 2010
  • It has been well known that traffic accidents occur under combined functional contributions of drivers, vehicles and road facilities, and that evaluation of safety levels for a specific road section or point is generally much complicated. Additionally, most of traffic accidents occur randomly implicating it is necessary to be evaluated in terms of probability theory. Thus, the evaluation model which reflects various characteristics and probabilistic distributions of traffic accidents has been necessary. The present paper provides a reliability based model with variables of probabilistic operating speeds and design speeds together which have been individually explaining associated characteristics in traffic accidents. Consequently, the model made it possible for speed management and road improvement projects to be evaluated in a common index. Application studies were performed in three cases. Through the studies, couples of facts were identified that the model successfully considered the probabilistic operating speeds and design speeds together and that then, the model evaluated road safety alternatives relatively which are complicatedly characterized and differently located.

Reliability Assessment of Long-Period Cable-Stayed Bridges on Near Fault Earthquake(NFE) (근거리지진에서 장주기사장교의 신뢰성평가)

  • Bang, Myung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.1
    • /
    • pp.44-48
    • /
    • 2012
  • The seismic safety of long-period cable-stayed bridges is assessed by probabilistic finite element analysis and reliability analysis under NFE. The structural response of critical members of cable-stayed bridges is evaluated using the developed probabilistic analysis algorithm. In this study, the real earthquake recording(Chi-Chi Earthquake; 1997) was selected as the input NFE earthquake for investigating response characteristics. The probabilistic response and reliability index shows the different aspect comparing the result from FFE earthquake. Therefore, the probabilistic seismic safety assessment on NFE earthquakes should be performed for the exact evaluation of long-period cable-stayed bridges and the earthquake resistant design criteria should be complemented.

A Study on Construction of the CMELDC at Load Points (각 부하지점별 유효부하지속곡선 작성법에 관한 연구)

  • Kim, Hong-Sik;Mun, Seung-Pil;Choe, Jae-Seok
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.4
    • /
    • pp.195-198
    • /
    • 2000
  • This paper illustrates a new method for constructing composite power system effective load duration curve(CMELDC) at load points. The main concept of proposed method is that the CMELDC can be obtain from convolution integral processing of the outage probabilistic distribution function of not supplied power and the load duration curve given at each load point. The effective load duration curve (ELDC) at HLI plays an important part in probabilistic production simulation, reliability evaluation, outage cost assessment and power supply margins assesment for power system planning and operation. And also, the CMELDC at HLII will extend the application areas of outage cost assessment and reliability evaluation at each load point. The CMELDC at load points using the Monte Carlo method and a DC load flow constrained LP have already been developed by authors. The effective load concept at HLII, however, has not been introduced sufficiently in last paper although the concept is important. In this paper, the main concept of the effective load at HLII which is proposed in this study is defined in details as the summation of the original load and the probabilistic loads caused by the forced outage of generators and transmission lines at this load point. The outage capacity probabilistic distribution function at HLII can be obtained by combining the not supplied powers and the probabilities of the not supplied powers at this load point. It si also expected that the proposed CMELDC can be applied usefully to research areas such as reliability evaluation, probabilistic production cost simulation and analytical outage cost assessment, etc. at HLII in future. The characteristics and effectiveness of this methodology are illustrated by case study of IEEE-RTS.

  • PDF

Failure Probability Assessment of Gas Pipelines Considering Wall-Thinning Phenomenon (감육현상을 고려한 가스배관의 파손확률 평가)

  • Lee Sang-Min;Yun Kang-Ok;Chang Yoon-Suk;Choi Jae-Boons;Kim Young-Jin
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.22 no.10 s.175
    • /
    • pp.158-166
    • /
    • 2005
  • Pressurized gas pipeline is subject to harmful effects both of the surrounding environment and of the materials transmitted in them. In order to maintain the integrity, reliable assessment procedures including tincture mechanics analysis etc are required. Up to now, the integrity assessment has been performed using conventional deterministic approaches even though there are many uncertainties to hinder a rational evaluation. In this respect, probabilistic approach is considered as an appropriate method for gas pipeline evaluation. The objectives of this paper are to estimate the failure probability of corroded pipeline in gas and oil plants and to propose limited operating conditions under different types of leadings. To do this, a probabilistic assessment program using reliability index and simulation techniques was developed and applied to evaluate failure probabilities of corroded API-5L-X52/X60 gas pipelines subjected to internal pressure, bending moment and combined loading. The evaluation results showed a promising applicability of the probabilistic integrity assessment program.

A Case Study on Probabilistic Adequacy Assessment of KEPCO System (우리나라 전력계통의 공급적정도 평가에 관한 사례연구)

  • Jeon, D.H.;Kyak, N.H.;Park, S.H.;Han, K.N.;Choi, J.S.;Kim, K.J.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.61-62
    • /
    • 2007
  • This paper evaluates probabilistic reliability of KEPCO system using TRELSS, which is a probabilistic reliability evaluation program for large-scaled power system. In order to systematically evaluate probabilistic reliability of KEPCO system, contingency cases causing load loss in (N-1) & (N-2) contingency depth was analyzed and reliability indices such as LOLP, EDLC, EENS according to change of FOR was calculated.

  • PDF

Development of a Program for Reliability and Probabilistic Production Cost Evaluation of Composite Power Systems using GUI (GUI를 이용한 복합전력계통의 신뢰도해석 및 확률론적 발전비산정 프로그램 개발)

  • Moon, Seung-Pil;Kim, Hong-Sik;Cha, Jun-Min;Rho, Dae-Seok;Choi, Jae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.243-245
    • /
    • 2001
  • The reliability and probabilistic generation production cost evaluation of composite power systems are important for power system operation and expansion planning. This paper present a computer program which can evaluate the reliability and probabilistic generation production cost of composite power system using GUI(Graphic User Interface). In this computer program, Monte Carlo simulation methods and CMELDC(CoMposite power system Effective Load Duration Curve) were used.

  • PDF

A Study on Probabilistic Reliability Evaluation of Power System Considering Solar Cell Generators (태양광발전원(太陽光發電原)을 고려한 전력계통(電力系統)의 확률논적(確率論的)인 신뢰도(信賴度) 평가(評價)에 관한 연구(硏究))

  • Park, Jeong-Je;Liang, Wu;Choi, Jae-Seok;Cha, Jun-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.3
    • /
    • pp.486-495
    • /
    • 2009
  • This paper proposes a new methodology on reliability evaluation of a power system including solar cell generators (SCG). The SCGs using renewable energy resource such as solar radiation(SR) should be modeled as multi-state operational model because the uncertainty of the resource supply may occur an effect as same as the forced outage of generator in viewpoint of adequacy reliability of system. While a two-state model is well suited for modeling conventional generators, a multi-state model is needed to model the SCGs due to the random variation of solar radiation. This makes the method of calculating reliability evaluation indices of the SCG different from the conventional generator. After identifying the typical pattern of the SR probability distribution function(pdf) from SR actual data, this paper describes modelling, methodology and details process for reliability evaluation of the solar cell generators integrated with power system. Two test results indicate the viability of the proposed method.

Economic Evaluation of Power Grid Interconnection between Offshore Wind Power Plants (해상풍력발전단지 간의 전력계통 연계에 관한 경제성 분석 연구)

  • Moon, Won-Sik;Jo, Ara;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.4
    • /
    • pp.339-344
    • /
    • 2014
  • An offshore wind power plant (WPP) is very expensive and different from an onshore wind power system in many ways. There has been a continuous increase in the capacity of the offshore WPPs. Therefore it is essential to analyze the feasibility and reliability of the offshore wind power to optimize their redundancy. Besides, it is very important to study a planning for grid interconnection of adjacent offshore WPPs. This paper proposes a economic evaluation method to interconnect with adjacent offshore substations in offshore wind power grid. Also, we suggest the probabilistic reliability method to calculate a probabilistic power output of the wind turbine and a cost of the expected energy not supplied that is used as the reliability index of the power system.

Probabilistic Reliability Analysis of KEPCO System Using TRELSS

  • Tran Trung Tinh;Kwon Jung-Ji;Choi Jae-Seok;Choo Jin-Boo;Jeon Dong-Hun;Han Kyoeng-Nam;Billinton Roy
    • Journal of Electrical Engineering and Technology
    • /
    • v.2 no.1
    • /
    • pp.10-18
    • /
    • 2007
  • The importance of conducting necessary studies on grid reliability evaluation has become increasingly important in recent years due to the number of blackout events occurring throughout the world. Additionally, quantitative evaluation of transmission system reliability is very important in a competitive electricity environment. The reason behind this is that successful operation of an electric power company under a deregulated electricity market depends on transmission system reliability management. The results of many case studies for the Korea Electric Power Cooperation (KEPCO) system using the Transmission Reliability Evaluation for Large-Scale Systems (TRELSS) Version 6.2 are illustrated in this paper. The TRELSS was developed by EPRI and Southern Company Services Inc. This paper presents the reliability analysis of KEPCO system expansion planning by using the TRELSS program.

A Study on Decision of Optimum Installed Reserve Rate using Probabilistic Reliability Criterion (확률론적인 신뢰도기준에 의한 적정설비예비율의 결정에 관한 연구)

  • Park, Jeong-Jae;Choi, Jae-Seok;Yun, Yong-Bum;Jung, Young-Bum
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.8
    • /
    • pp.1318-1326
    • /
    • 2008
  • This paper proposes an alternative methodology for deciding an optimum deterministic reliability level (IRR; Installed Reserve Rate) by using probabilistic reliability criterion (LOLE; Loss of Load Expectation). Additionally, case studies using the proposed method induce the characteristics of relationship between the probabilistic reliability index (LOLE) and deterministic reliability index (IRR) for 2008 and 2010 years in Korea power system. The case study presents a possibility that an optimum IRR level in Korea can be assessed using the proposed method. Korea power system has been using the LOLE criterion to determine the adequacy of installed capacity (ICAP) requirement. The criterion in Korea is that the loss of load expectation shall not exceed the available capacity more than five day in ten years (=0.5[days/year]), The probabilistic reliability evaluation and production cost simulation program which is called PRASim is used in order to evaluate the relationship and optimum IRR in this paper.