• 제목/요약/키워드: Probabilistic Life Cycle Cost Analysis

검색결과 24건 처리시간 0.027초

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • 한국도로학회논문집
    • /
    • 제8권2호
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF

철도교량의 생애주기비용분석에 관한 연구 (A Study on the Life Cycle Cost Analysis of Railroad Bridges)

  • 박미연;나옥빈;황영민;김대영;조효남
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.574-580
    • /
    • 2005
  • Recently, the number of bridges and tunnels in railway is increasing due to the super high-speedy of train. Also, because of successively accidents of civil structures such as bridges and dams, the importance of maintenance become influential. The purpose of this study is to show the probabilistic life cycle cost analysis technique(PLCC) of the railroad bridge as pubic-infrastructures, and reasonably to indicate the economy in life cycle cost(LCC) through a case study. Rationally for life cycle cost analysis, the data gathered through many materials considered the uncertainty such as covariance. As a result, it is indicated that prestressed concrete bridge is pretty more cost-effective during life-cycle than preflex as well as steel box bridge. In future, if the construction of database and maintenance materials for railroad infrastructure is actualized, the life cycle cost analysis for railroad can be conducted easily and practically.

  • PDF

확률적 LCC분석기법을 활용한 수도시설물의 설계VA모델에 관한 연구 (A Study on the Design Value Analysis Model Using Probabilistic LCC Analysis of Water Supply System Project)

  • 정평기;서종원;임종권
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.181-193
    • /
    • 2004
  • 수도건설사업은 공용이후단계에서 소요되는 $운영\cdot유지관리비용$ 중에서 기계설비 및 관로시설이 대부분을 차지하는 대표적인 플랜트시설로 구성되므로 일반적인 토목시설물의 LCC모델과 차별화 되어야 할 것이다. 따라서 본 연구에서는 수도건설사업에 적합하도록 비용분류체계를 제시하고, 이에 따라 수도시설의 확률적 LCC분석 모델을 개발하였다. 또한, 설계VE 활동시 기초가 되는 설계VA의 절차를 실무활용도 측면을 고려하여 개선된 설계VA절차를 제시하였다. 제시된 설계VA절차와 확률적 LCC분석모델을 사용하여 실제 건설사업의 설계VE활동에 있어 송수관로의 적정 선형 선정에 적용하였다. 제안된 수도건설사업의 설계VA 및 확률적 LCC분석모델은 향후 수도건설사업의 $경제적\cdot가치혁신적$ 대안선정과 유지관리비 예산추정 및 적정예산 배정에 매우 유용하게 활용될 수 있을 것이다.

확률론적 생애주기비용-이익분석 기반 수명관리 최적화 기법 (Optimum Service Life Management Based on Probabilistic Life-Cycle Cost-Benefit Analysis)

  • 김선용
    • 한국산학기술학회논문지
    • /
    • 제17권4호
    • /
    • pp.19-25
    • /
    • 2016
  • 사회기반시설물을 포함한 구조물은 수명유지 또는 연장을 위하여 적절한 점검과 유지보수가 필수적이다. 이러한 점검과 유지보수는 일반적으로 생애주기비용 평가를 통해 관련 계획이 수립된다. 본 논문에서는 구조물의 생애주기비용과 그 사용으로 인해 발생되는 이익을 고려하는 확률론적 비용-이익분석과 이를 통한 구조물 최적수명 결정 방법을 다루고자 한다. 생애주기비용은 구조물 초기 제작/건설비용, 유지보수 비용과 구조물 파괴로 인한 예상손실을 고려하게 된다. 일반적으로 구조물의 수명연장은 생애주기비용의 증가를 유발하나 사용기간 증가로 인해 발생되는 이익 또한 증가하여, 이를 최적화하는 수명관리에 관심을 가질 필요가 있다. 생애주기 평가에 있어서 유지보수 적용이 구조성능, 구조물 파괴확률 그리고 수명에 미치는 영향을 확률론적 방법을 적용하여 평가하며, 이를 통해 생애주기비용과 이익의 차이를 목적함수로 구성하게 된다. 이 목적함수가 최대가 되는 지점이 설계변수인 구조물 최적수명이 되는데, 최적화문제 구성에 있어서 제한조건의 변화에 따라 유지보수 계획수립도 가능하다. 본 논문에서 다루어지는 구조물 수명관리 최적화기법이 안전성과 효율성을 동시에 고려하는 사회기반시설물 수명관리에 기여할 것으로 기대한다.

확률적 방법에 의한 철도시설물의 LCC 분석 (Probability- based Life Cycle Cost Analysis of Railroad Structures)

  • 소병춘;최영민;조선규;신경철;정재동
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.971-976
    • /
    • 2004
  • The management of railroad structures is more difficult and complicate because there are many structures such as rail, bridge, tunnel, station, and so on. Therefore, LCC(Life Cycle Cost) analysis of railroad structures as public infrastructure must contain a maintenance cost as well as an initial cost in order to make a more effective management during the life cycle on the design phase. This paper presents a cost classification scheme considering user costs such as value of delayed time of passenger and freight. Also, in this study it is developed a probabilistic life cycle cost(PLCC) analysis model of railroad structures taking into account uncertainties and variations of input variables in order to analyze LCC. It may be stated that the model proposed in this study can greatly contribute to the making optimal decision, the estimate of the maintenance cost and the allocate of budget in the project of railroad structures.

  • PDF

안벽구조물의 확률론적 VE/LCC 분석모델 적용방안 (Application of probabilistic VE/LCC Analysis Models for Quay Wall Structures)

  • 안종필;이증빈;박주원;유덕찬
    • 한국건설관리학회논문집
    • /
    • 제8권5호
    • /
    • pp.71-79
    • /
    • 2007
  • 최근 가치공학과 생애주기비용 분석의 중요성이 대두됨에 따라 항만구조물의 VE/LCC(Value Engineering/Life Cyccle Cost) 분석에 대한 연구개발이 활발하게 진행되고 있다. 반면에 항만구조물의 생애주기비용 산정과 가치분석의 실무 적용에 있어 이론적 모델과 표준지침 및 소프트웨어 등이 정립되어있지 않기 때문에 분석자에 따라 일관성과 전문성에 한계를 나타내고 있다. 특히 생애주기비용의 분석에 있어 현행의 확정론적 방법으로는 파괴손실비용의 산정이 어렵기 때문에 퍼지 신뢰성해석에 따라 파기확률을 파괴손실비용에 반영할 수 있는 확률론적 방법의 도입이 반드시 필요한 실정이다 따라서 본 연구에서는 안벽구조물의 설계에 있어 대안별 열화성능 차원의 설계를 수행하도록 유도하기 위하여 퍼지신뢰성 이론에 기초한 확률론적 VE/LCC 분석모델을 제안하였으며, 제안된 분석모델의 신뢰성과 활용성을 향상시키기 위한 측면에서 실제 대상 구조물에 적용하였다. 본 연구에서 제안된 방법론은 향후 다양한 분야의 설계 및 유지관리단계에서의 생애주기 비용과 가치분석의 의사결정에 활용되어질 것으로 사료된다.

생애 위험도기반 건축물의 설계단계 생애주기비용 분석 방법 (Life Cycle Cost Analysis for Design of Buildings based on the Lifetime Risk)

  • 백병훈;조중연
    • 한국건설관리학회논문집
    • /
    • 제15권3호
    • /
    • pp.113-119
    • /
    • 2014
  • LCC 분석은 건축물의 설계단계 뿐만 아니라 유지관리 단계에서의 보수 보강 또는 교체에 대한 최적 의사결정의 도구로서 이론적으로나 실무적으로 각광을 받고 있는 분석 방법이다. 이는 초기 투자비용의 효율성을 극대화 하고 유지관리를 통한 구조물 사용성의 효율적 증대를 극대화하는 노력의 일환으로 최근 건축물의 설계 및 유지관리 시 LCC 분석효과의 실질적인 적용이 요구되어 지고 있다. 따라서 본 논문은 일반적인 분석기법에 그치고 있는 기존 LCC 연구를 생애위험도를 고려한 LCC분석을 통해 설계단계 최적 의사결정을 위한 새로운 분석 방법론을 도출하였다.

몬테카를로 시뮬레이션을 이용한 건축물 생애주기비용(LCC)의 실질할인율에 대한 확률론적 분석 (Stochastic analysis for Real Rate Interest of Building Life Cycle Cost(LCC) with Monte-Carlo Simulation)

  • 김범식;정영한
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.161-163
    • /
    • 2012
  • Recently on Value Engineering(VE) and Life Cycle Cost(LCC) social interests is increasing. The government Turn Key, BTL projects and public works projects, such as VE and LCC Analysis on the value and economic analysis is mandatory. And accordingly the VE and LCC analysis is underway for the various studies. However, there is a problem existing in the LCC analysis. Worth the cost varies according to the flow of time. However, the real interest rate during the LCC analysis of buildings in calculation time for interest rates and inflation are not considering the value of the flow. In other words, a few years using the average value of the deterministic analysis method has been adopted. These costs for the definitive analysis of the cost of an uncertain future, unforeseen changes resulting hazardous value. In this study of the last 15 years interest rates and inflation targeting by using Monte-Carlo Simulation is to perform probabilistic analysis. This potential to overcome uncertainties of the cost of building a more scientific and LCC Estimation of the probability value of the real interest rate is presented.

  • PDF

교육시설물의 수선교체비용에 대한 확률론적 분석 연구 (A Probabilistic Analysis on the Repair and Replacement Cost of Educational Facilities)

  • 유영진;손기영;김지명;김태희
    • 교육시설 논문지
    • /
    • 제25권1호
    • /
    • pp.3-12
    • /
    • 2018
  • Educational facilities are more uncertain about maintenance costs due to their comprehensive and long life-cycle compared to commercial buildings. In addition, maintenance of the existing post management system can not maintain the original function of education facilities continuously and economically. In order to overcome this problem, it is necessary to analyze the repair and replacement cost for the uncertainty factor in maintenance. This study propose a model to determine repair and maintenance cost and cycle of educational facility based on probabilistic estimation concept. For the analysis, Monte Carlo simulation, a probabilistic analysis method, was applied based on the repair and maintenance history data of the educational facilities in Florida. The results of this study can be used as a guideline for quantitative facility management and facility management research.

해상 연약지반의 저치환율 개량에 대한 확률론적 최적화 (Probabilistic Optimization for Improving Soft Marine Ground using a Low Replacement Ratio)

  • 한상현;김홍연;여규권
    • 지질공학
    • /
    • 제26권4호
    • /
    • pp.485-495
    • /
    • 2016
  • 본 연구에서는 방파제 하부지반을 저치환율 재료로 보강 및 개량하기 위한 치환율과 재하중 방치기간을 확률론적 최적화 기법을 이용하여 분석하였다. 해석에 필요한 확률변수의 불확실성을 최소화하기 위하여 사전자료를 활용한 베이지안 갱신결과 최대 39.8% 포인트까지 불확실성이 감소하였고, 특히 사전함수의 표본수가 더 많은 구간의 감소폭이 컸다. 치환율 결정을 위하여 저치환율 단면 중 15~40% 범위에서 일계신뢰도법 및 몬테카를로 시뮬레이션 방법에 의해 해석한 결과 목표파괴확률을 만족하는 치환율은 심층고결처리 및 쇄석다짐말뚝 구간에서 각각 20% 및 25% 이상으로 나타났다. 치환율에 대한 최적화를 위하여 생애주기비용 분석을 실시한 결과 목표파괴확률을 만족하는 범위 내에서 최적 치환율이 산정되었으며, 두 구간에서 각각 20% 및 30%가 가장 경제적인 것으로 결정되었다. 재하중의 방치기간에 대한 확률론적 해석결과 3개월 이상인 경우 모두 목표파괴확률을 만족하는 것으로 나타났다.