• Title/Summary/Keyword: Prevent program

Search Result 1,703, Processing Time 0.032 seconds

A simulation of Lightning Performance of the 154 kV Transmission Line with the Surge Arrester Installation (154 kV 송전선로에 피뢰기 설치시 내뢰성 향상효과 모의)

  • Shim, Eung-Bo;Woo, Jung-Wook
    • Proceedings of the KIEE Conference
    • /
    • 1997.07e
    • /
    • pp.1642-1644
    • /
    • 1997
  • The simulation study of lightning faults reducing effects by the installation of surge arresters on the 154 kV transmission line is stated here. For the purpose of detailed simulation of arcing horn, a flashover model with dynamic characteristics of arcing horn gap was represented as a non-linear inductance which is controlled by EMTP/TACS(Electromagnetic Transient Program/fransient Analysis of Control Systems) switches. The back flashover inducing current was increased from 50 kA to 88 kA by the installation of surge arresters on the transmission line which has one ground wire and 20 ohms of tower footing resistances. The great advantage of surge arrester installation on one circuit of the double circuit transmission line is to prevent the simultaneous back flashover up to 190 kA.

  • PDF

Development of a Safety Management System Model in the Construction Industry (건설업의 안전경영시스템 모델개발에 관한 연구)

  • Lee, Geun-Seok;Park, Peom
    • Journal of the Korea Safety Management & Science
    • /
    • v.1 no.1
    • /
    • pp.41-54
    • /
    • 1999
  • The government has done much investment and its efforts to prevent the accident in the construction industry owing to the high rate of accident and the dangerous factors, but it is not improved the level of safety activities as desired. On the contrast, after adopted quality management system and environment management system in the advanced countries, they are developing the safety management system consequently and achieving high efficiency in this field. Although Korea executed the KISCO 2000 program by Korea Industrial Safety Corporation since July 1, 1999, it was excepted to the construction industry. Therefore, it is urgent matter to be developed the safety management system being applied to the construction industry. In this study, it was developed the safety management system in the construction industry, and suggested its documentation and an executive method according to the construction safety works.

  • PDF

A study on Sub-contractor Product Assurance for development of Ka band Communication Payload System of COMS (통신해양기상위성 Ka 통신탑재체 개발 공동 및 용역 개발 참여기관 제품보증 연구)

  • Jeong, Cheol-Oh;Lee, Seung-Pal
    • Journal of Aerospace System Engineering
    • /
    • v.3 no.1
    • /
    • pp.6-11
    • /
    • 2009
  • It is anticipated that quality assurance for the Ka band Communication Payload System(COPS) development program of the communication, Ocean & Meteorological Satellite(COMS) may be a core technical factor to be concerned in order to avoid any failure, and to assure its final performance during the mission lifetime in space. Those can be managed and verified and assessed by performing the Quality Assurance (QA) and risk management which helps to prevent and to reduce the critical fails. This paper introduces the Product Assurance (PA) system and procedures for controlling and monitoring sub-contractors which were participated in Ka band Communication Payload System (COPS) development. Also this paper shows Quality Assurance (QA) procedures and detailed their processes for assured the product performed by local companies from site survey for selecting companies to delivery of their equipment.

  • PDF

A Study of Longitudinal Forces and Displacements in a Multi-Span Bridge Equipped with a CWR Track (장대레일이 설치된 교량에서의 축방향 변위 및 축력 변화 연구)

  • Lee, Joo-Heon;Huh, Young
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.442-449
    • /
    • 1999
  • Due to temperature variations, considerable longitudinal rail forces and displacements may develop in continuous welded rail(CWR) track on long-span bridges or viaducts. Excessive relative displacements between sleepers and ballast bed may disturb the stable position of the track in the ballast which results in a lower frictional resistance. Generally, these problems are solved by installing rail expansion devices. However the application of expansion devices in high-speed tracks on existing bridges, as a means to prevent excessive longitudinal displacements and forces, is not attractive method due to comfort, safety and maintenance aspects. An alternative and very effective solution is possibly the use of so-called zero longitudinal restraint(ZLR) fastenings over some length of the track. The calculations, carried out in this respect, show a considerable reduction of track displacements, track forces, and the relative sleeper/ballast displacements. This reduction depends on the length over which these fastenings are installed. In this paper calculations of the longitudinal displacments and forces in a CWR track and substructure resulting from thermal, mechanical and kinematical loads were carried out using the FEM analysis program LUSAS

  • PDF

A Evaluation of Maintenance History for K-AGT (한국형 경량전철시스템의 유지보수 이력에 대한 평가)

  • Lee, Ho-Yong;Ryu, Sang-Hwan;Cho, Hong-Shik;Cho, Bong-Kwan;Jang, Yul
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1014-1023
    • /
    • 2008
  • The K-AGT test line is managed similarly to revenue operation and operated automatically 120km per day, total 90,000km from August 2004 to December 2007. To enhance reliability of developed system, maintenance information system based on RCM is applied. The maintenance program applied in test line is based on RCM which prevent a fault before it happens and a fault made in test line is analysed by reliability growth test. Vehicle system, power supply system, signalling system, track and infrastructure are built in test line and it is reviewed enhancing system performance and changing designs to commercialize through reliability growth analysis method.

  • PDF

Elevator Pressurization in Tall Buildings

  • Klote, John H.
    • International Journal of High-Rise Buildings
    • /
    • v.2 no.4
    • /
    • pp.341-344
    • /
    • 2013
  • During a building fire, smoke can flow through elevator shafts threatening life on floors remote from the fire. Many buildings have pressurized elevators intended to prevent such smoke flow. The computer program, CONTAM, can be used to analyze the performance of pressurization smoke control systems. The design of pressurized elevators can be challenging for the following reasons: (1) often the building envelope is not capable of effectively handling the large airflow resulting from elevator pressurization, (2) open elevator doors on the ground floor tend to increase the flow from the elevator shaft at the ground floor, and (3) open exterior doors on the ground floor can cause excessive pressure differences across the elevator shaft at the ground floor. To meet these challenges, the following systems have been developed: (1) exterior vent (EV) system, (2) floor exhaust (FE) system, and ground floor lobby (GFL) system.

A Theoretical Study on a Folding Shading Device (접이식 차양장치에 관한 이론적 연구)

  • Baek, Sang-Hun;Choi, Won-Ki;Suh, Seung-Jik
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.3
    • /
    • pp.28-36
    • /
    • 2009
  • The majority of fixed shading devices are installed in the exterior of a building in order to dissipate the heat absorbing from the sun and to prevent the direct sunlight. In designing external shading devices for windows, many requirements must be considered simultaneously; solar geometry, optimum energy performance, multi-purpose usage and design factors etc.. In order Lo satisfy these requirements, we suggests the folding shading device and its optimum design methodology. Also we analyzed the thermal performance using the IES_VE program according to various operating modes and compared with existing shading devices. The results show that proposed device reduce about $1.90{\sim}22.40%$ in cooling load and about $1.09{\sim}24.22%$ in heating load in comparison with existing ones.

A study on Product Assurance for development of Ka band Communication Payload System of COMS (통신해양기상위성의 Ka 통신탑재체 개발 제품보증 연구)

  • Jeong, Cheol-Oh;Lee, Seung-Pal
    • Journal of Aerospace System Engineering
    • /
    • v.2 no.1
    • /
    • pp.22-27
    • /
    • 2008
  • It is anticipated that quality assurance for the Ka band Communication Payload System(COPS) development program of the Communication, Ocean & Meteorological Satellite(COMS) may be a core technical factor to be concerned in order to avoid any failure, and to assure its performance during the mission lifetime in space. Those can be managed and verified and assessed by performing the Quality Assurance (QA) and risk management which helps to prevent and reduce the critical fails. This paper introduces the Product Assurance (PA) system and procedures for Ka band Communication Payload System which was established and performed during the Qualification Model (QM) manufacturing phase. In this paper, we present detailed process for the products manufactured by local companies according to PA procedures operated through whole phases from design to test of equipment. Also this paper shows Quality Assurance (QA) procedures and detailed their processes for assured the product quality manufactured by local companies.

  • PDF

Correlation between Perceived Backpack Weight and Musculoskeletal Pain for Elementary School Children (초등학교 학생이 지각한 가방무게와 근골격계 통증과의 상관관계)

  • Jung, Min-Ye
    • Journal of the Ergonomics Society of Korea
    • /
    • v.25 no.4
    • /
    • pp.35-40
    • /
    • 2006
  • The purpose of this study was to investigate the relationships between weights of backpack and back and shoulder pains of elementary school students in Korea. A cross-sectional sample of 278 boys and 233 girls aged between 7 and 12 years were analyzed for this study. 49.1% of the participated children reported their backpacks were felt heavy, and the weights of their backpack were grater than 13.3% of their body weight. About 65.4% of students carried greater than 10% of their body weights. The weight of the backpack showed significant positive relationship with shoulder pain but not with their back pain. The results of this study suggested that overweighed backpack could cause the musculoskeletal pain to the elementary school students. Therefore, an effective backpack safety program for parents and students is necessary to educate them how to prevent possible musculosketal pain related to the weight of backpack within the perspective of the ergonomical approach.

The Aging of Population and Improvement Direction of Health Promotion Programs (고령화 현황과 건강증진 프로그램의 개선방향)

  • Kim, Hae-Ryong
    • Journal of Korea Association of Health Promotion
    • /
    • v.2 no.2
    • /
    • pp.160-166
    • /
    • 2004
  • The aging of population in Korea is proceeding in such a fast speed that other developed countries kaven't experienced. Korea already emerged in the aging society in 2000, and expected to become an aged society in 2019.There(ore, making effort to improve the quality of life of the aged people tv prolonging their social, economic activity, resulting in retrenchment of expenditure on health is very important. Developing nutrition and exercise programs to improve the quality of life of the elderly people, resulting in prolonged independent life is as important as medical care after onset of diseases. As a national preventive measure to save elderly people from becoming in need of assist, comprehensive program including teaching computer to prevent senile dementia, nutritional and exercise programs, along with programs of everyday life activity for the risk-group people should be carried out,

  • PDF