• Title/Summary/Keyword: Prevent

Search Result 21,389, Processing Time 0.049 seconds

Stepwise inertial control of a DFIG to prevent the over-deceleration in wind speed reduction (풍속 감소 시 Over-Deceleration 방지를 위한 DFIG 풍력발전기의 계단형 출력 관성제어)

  • Kang, Moses;Lee, Jinsik;Kang, Yong Cheol
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.173-174
    • /
    • 2015
  • If a wind speed decreases during inertial control of a wind turbine generator (WTG), the rotor speed might decrease below the minimum operating limit, which is called over-deceleration (OD). When OD occurs, inertial control should be disabled and then the output power of a WTG significantly decreases. This significant power reduction causes a subsequent frequency drop. This paper proposes the stepwise inertial control to prevent OD when a wind speed decreases during inertial control. To do this, the proposed scheme changes the additional power output based on the rotor speed. The performance of the proposed scheme is investigated using an EMTP-RV simulator. The results show that the proposed inertial control scheme prevent OD even when the wind speed decreases during inertial control.

  • PDF

Reduction of Fire Main Pipe System's Vibration Using Back Flow Prevent Globe Valve (역류방지 글로브 밸브를 이용한 소화 주관계의 진동개선)

  • Park, Mi-You;Han, Hyung-Suk;Lee, Seuk-Soo
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.19 no.6
    • /
    • pp.599-606
    • /
    • 2009
  • Main source of URN(underwater radiated noise) which is related to the ship's survivability is divided into two groups. Cavitation is the main source of URN when the speed of ship is upper than CIS(cavitation inception speed). But when the speed of ship is lower than CIS, the main source of URN is the structure-borne noise on the hull which is originated from propulsion system, pump system and trnasmitted vibration of the pipe system. In this paper, to reduce the vibration of discharge pipe and valve system, back flow prevent globe valve and new rubber mount are applied to the ship. As the result of applying new valve and mount, the vibration is reduced drastically.

Natural Disasters and their Impact on Railways (자연재해가 철도시스템에 미치는 영향 및 대책)

  • Kim, Yu-Ho;Kim, Jin-Cheol;Choe, Gwon-Hui;Song, Gwang-Yeol;Bing, Gun-Seop
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.04a
    • /
    • pp.67-77
    • /
    • 2011
  • The railroad system must ensure not only the safety of facilities but also the prevention of natural and environmental disasters. The infrastructure must be strengthened in order to prevent rail damage by natural disasters and other causes. Thus, it would be able to prevent damage due to such natural factors like heavy rain and snow fall, wind, and catastrophic earthquakes. It seems that it would be the best way to install safety facilities throughout the entire length of a route, but one would not be able to provide for the costs involved in this approach. Therefore, these facilities must be installed at selected locations that is the most vulnerable to disasters. In this paper we propose the examples of both foreign and domestic methods in order to prevent from damages caused by the above-mentioned natural disasters and others.

  • PDF

A Study on the Impact to Safety Management and the Prevention Measure by the Speedy Construction Work (돌관공사가 안전관리에 미치는 영향 및 예방대책에 관한 연구)

  • Ha, Haeng-Bong;Bang, Myung-Seok;Lim, Kyu-Won
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.243-254
    • /
    • 2013
  • Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.

  • PDF

A study on the safety supervision team's efficient using at construction site (건설현장에서의 안전감시단의 효율적 활용에 관한 연구)

  • Kang Yong-Tak;Kim Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.4
    • /
    • pp.13-25
    • /
    • 2005
  • As there are more accidents which are more serious in construction site than other industries, it needs the safety management system to be SLIM on the same time, There are still lots of difficulties to prevent those accidents exactly, so it also needs a safety supervision team to prevent the accident, unsafe operation and condition before happening, which is also called as a Man-to-Man safety management method. The range of the job site in one personnel's management is very big and large, so it needs the personnel to keep watch the safety operation and prevent any unsafe/fire accidents. Also the personnel also should find out the unsafe points in the job site, and carefully supervise the dead angle site, then support the totally safety management POINT and realize the ZERO accident.

산업안전교육이 건설현장에 미치는 영향에 관한 실증적 연구

  • Jo, Jae-Hwan
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.51
    • /
    • pp.75-83
    • /
    • 2010
  • In terms of deregulation requests from business, incidents at construction sites are rapidly increasing after reducing the regular safety training hours. Especially, to prevent incidents through safety trainings for construction site workers, who have lots of hazardous tasks than general manufacturing, is not only to protect property of both the companies and the country but also to increase their profits. That is why there are loud voices regarding that the safety training is a core mandatory to prevent industrial incidents. But, most companies, as soon as the deregulation for safety training is implemented, mitigated conducting safety trainings to prevent incidents. With this, theincidents are currently to be increased and caught in a vicious circle of many incidents at the smaller companies because of their absentmindedness regarding safety training due to their poorness as subcontractors of major companies, comparing to major companies. This study explains that incident factors are roughly divided into technical factor, managerial factor, and educational factor. And, we confirmed that the educational factor led by deficiency safety awareness and knowledge was the major factor.

  • PDF

A Study on the Analysis of Damping Loads to Prevent Harmonic Resonance (고조파 공진 억제를 위한 완충부하 투입량 분석에 관한 연구)

  • Lim, Chan-Ho;Lee, Kyeong-Seob;Yu, Won-Kun;Lee, Heung-Jae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.2
    • /
    • pp.262-266
    • /
    • 2010
  • During the restoration process of primary restorative transmission system, the over voltage may happen due to nonlinear interaction between the unloaded transformer and the transmission system. This over voltage is caused by harmonic resonance and can be prevented by damping loads that are connected before restoration process of primary restorative transmission system. But it is very difficult to predict the occurrence possibility of the harmonic resonance previously. This paper analyzes the relationship between the harmonic resonance and the amount of damping loads to prevent the harmonic resonance. This paper calculates the minimum amount of damping loads to prevent harmonic resonance while changing the length of primary restorative transmission line. And this paper confirmed that the amount of damping loads is not proportional to length of transmission line. The result of this paper will be used as important experiment data to predict the occurrence possibility of harmonic resonance previously.

Switching Signal Patterns to Prevent Short Circuit of AC Choppers (교류초퍼에서 단락사고 방지를 위한 스위칭 신호 패턴)

  • Jang, Do-Hyeon;Yeon, Jae-Eul
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.50 no.9
    • /
    • pp.445-452
    • /
    • 2001
  • Two switching signal patterns are proposed to prevent short circuit of PWM ac choppers. The voltage detection method and the current detection method are proposed to execute two switching signal patterns. In the voltage detection method, the dead-time has to be inserted to the switching signals after polarity of input voltage is checked by voltage transducer at input side. In the current detection method, the direction of load current is checked by current transducer at output side, and the dead-time delay is not considered. Controlling circuit built by current detection method is simple because the dead-time delay is considered. The experimental results are presented to prevent short circuit of ac chopper safely.

  • PDF

A Study on Effective Trade Claims Solutions through Commercial Arbitration System

  • Choi, Rack-In
    • Journal of the Korea Society of Computer and Information
    • /
    • v.22 no.1
    • /
    • pp.99-106
    • /
    • 2017
  • In this paper, the first to identify in detail the direct and indirect causes of trade claims and to provide a way to prevent the causes and measures specific claims. Trade claims is not the best way to prevent in advance, measures to prevent future trade claims is as follows. First, it should be the credit investigation of the counterparts. Second, the contract must determine the rights and obligations of each other through sufficient consultation with contract and faithfully perform its contractual obligations. Third, the explicit trade arbitration clause of arbitration in the contract, and shall be a sufficient review of the procedure such as import and export, international business practices, norms and partners of economic policy, foreign exchange regulations, the trade system transactions. Finally, for it is to be treated as a one-stop strengthening the organization and function, and the Ministry of Commerce and Trade Association, and KOTRA and Trade Insurance Corporation strategic support systems, such as done by covering the work on trade claims prevention and resolution in the Korean Commercial Arbitration Board.

The Study on the Development of Boats Applied to Skill to Prevent Sinking (침몰 방지형 단정 개발에 관한 연구)

  • Park, Jong-Beom;Lee, Dong-Hun;Kim, Deok-Eun;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.43 no.1 s.145
    • /
    • pp.128-133
    • /
    • 2006
  • This study is focused on the skill to prevent RIB (Rigid Inflatable Boat) from sinking. For better ability to prevent sinking, single hypalon tube is replaced by double TPU (Thermoplastic Polyurethane) tube that is excellent at frictional wear strength and oil-resisting qualities. High buoyant materials are arranged in empty spaces of ship so that ship's spare buoyancy is increased. And for restoration of stable position of ship, the self-righting system is installed. Aluminium alloy is used for increasing hull strength.