• Title/Summary/Keyword: Prestressed Steel Frame Overpass

Search Result 1, Processing Time 0.013 seconds

Development of Prestressed Steel Frame Overpass using Temporary Piers (가 지지점을 이용한 프리스트레스된 강재 라멘식 보도육교의 개발)

  • Kong, Byung Seung;Hwang, Won Sup;Park, Young Je
    • Journal of Korean Society of Steel Construction
    • /
    • v.10 no.4 s.37
    • /
    • pp.565-575
    • /
    • 1998
  • This study presents overall process for designing and constructing a prestressed frame overpass using temporary piers. For the purpose of automating the design process, this study presents a computer program. According to the effective span(20m, 25m, 30m, 35m, 40m, 45m), this study performed parametric analysis and eventually presented appropriate cross section and compared this cross section with that of the existing simple steel overpass in girder height and quantify of the steel. $26{\sim}48%$ for gilder height and $25{\sim}34%$ for quantify of the steel are reduced as the result of study for span length $20{\sim}45m$. As long as the span length. the reduction rate was large.

  • PDF