• Title/Summary/Keyword: Prestressed Concrete Girder

Search Result 307, Processing Time 0.037 seconds

An Analysis of Bending Behavior of Continuous P.S.C Girder Railway Bridge by Using Down-Up Method (주형의 하강ㆍ상승을 이용한 연속 P.S.C빔 철도교의 휨거동 해석)

  • 구민세;위영민;최인식
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.293-298
    • /
    • 2001
  • 2span continuous Prestressed concrete girder railway bridges, span length 21m, 25m, 30m, 35m, that down-up method is applied and that designed to satisfy service load in accordance with design criteria of railway bridge can be dropped in their hight compared with existing simply supported prestressed concrete girder railway bridges. Continuous bridges result in guaranteeing safety against bending behavior by loading the practical railway moving load with each velocity. But the natural frequency of span length 21m is estimated not to satisfy recommended limitation of UIC 776-1R..

  • PDF

Transverse Analysis of Prestressed Concrete Box Girder High-Speed Railway Bridges (고속전철 PSC 박스거더 교량의 횡방향 해석)

  • 김병석;김영진;박성용
    • Proceedings of the KSR Conference
    • /
    • 1998.11a
    • /
    • pp.47-53
    • /
    • 1998
  • Many kinds of methods have been developed to carry out transverse analysis of prestressed concrete(PSC) box girder bridges. However, most bridge engineers only use the simple frame model to analyze PSC box girder in transverse direction because of its simplicity and easy usage. But, this frame model has many problems such that it can't consider warping, distortion and longitudinal load distribution. In this study, the results from simple frame model and 3-dimensional shell model with UIC load are compared to show its validity. The results from frame model are slightly larger than those of shell model in symmetric loading case. But, positive bending moment of top slab is larger in shell model than frame model in case subject to anti-symmetric loading. It shows that simple frame model can't always give conservative results, so a practical tool whose treatment is easy and whose product is reliable shall be developed as soon as possible.

  • PDF

Optimal Tension Forces of Multi-step Prestressed Composite Girders Using Commercial Rolled Beams (상용압연 형강과 콘크리트 합성거더의 다단계 긴장력 최적설계)

  • 정홍시;김영우;박재만;신영석
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2004.04a
    • /
    • pp.95-102
    • /
    • 2004
  • The 1st and 2nd tension forces of the PSSC(Prestressed Steel and Concrete) girder constructed with commercial rolling beams and concrete are optimally designed. The design variables are the 1st and 2nd tension forces due to multi-step prestressing and live load. The objective function is set to the maximum live load. Design conditions are allowable stress at the top and bottom of slab, beam and infilled concrete due to a construction step. An Optimization of Matlab based program Is developed. The results show that the tendon position and concrete compression strength etc are important.

  • PDF

Construction Sequence Measurement & Analysis for Continuous 8-span Prestressed Concrete(PSC) Girder Bridge (8경간 연속화 프리스트레스 거더교의 시공 계측 및 분석 -서울교 확장교량 적용)

  • 조성웅;이원표;임현태
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.985-990
    • /
    • 2001
  • The widened Seoul-Bridge is the first continuous 8-span prestressed concrete(PSC) girder bridge in domain. The construction sequence of the bridge consists of S steps in a large way. The measuring in construction stage includes the determination of the allowable fluctuation value of beam stress in each step and the measurement beam stress during prestessing. The measured tendon prestress force was compared with the design value. When it was compared with the analytic result, the difference between the measured stress and the analytic stress was below allowable error. The friction loss and the anchorage slip loss of the tendon prestress force was lower than the design loss value.

  • PDF

A Study on Behaviors of Prestressed Bridge Girders Made Continuous (연속화된 Prestress 거더교의 거동연구)

  • 구민세;최인식;김진헌
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2002.10a
    • /
    • pp.396-403
    • /
    • 2002
  • To eliminate deck joints, continuous span bridges are becoming an attractive option. Defferent continuty methods and construction sequences have different time-dependent effects on the behavior of the bridge system. This paper is carried out to evaluate the restraint moments generated at interior span of bridges constructed with full-span prestessed concrete bridge. Especially, effects of creep and shrinkage between ACI209-95 and Eurocode 2 are compared in this paper. Time-dependent effects in prestressed concrete bridges include creep and shrinkage of concrete. Creep due to prestress makes the girders camber up and cause positive restraint moments. The most significant effect of shrinkage in continuous bridges is the differential shrinkage that occurs because of the difference in type and age of girder and deck concrete. Differential shrinkage between the precast girder and the deck typically causes negative res03int moments.

  • PDF

Strengthening of prestressed girder-deck system with partially debonding strand by the use of CFRP or steel plates: Analytical investigation

  • Haoran Ni;Riliang Li;Riyad S. Aboutaha
    • Computers and Concrete
    • /
    • v.31 no.4
    • /
    • pp.349-358
    • /
    • 2023
  • This paper describes an in-depth analysis on flexural strength of a girder-deck system experiencing a strand debonding damage with various strengthening systems, based on finite element software ABAQUS. A detailed finite element analysis (FEA) model was developed and verified against the relevant experimental data performed by other researchers. The proposed analytical model showed a good agreement with experimental data. Based on the verified FE model, over a hundred girder-deck systems were investigated with the consideration of following variables: 1) debonding level, 2) span-to-depth ratio (L/d), 3) strengthening type, 4) strengthening material thickness. Based on the data above, a new detailed analytical model was developed and proposed for estimating residual flexural strength of the strand-debonding damaged girder-deck system with strengthening systems. It was demonstrated that both finite element model and analysis model could be used to predict flexural behaviors for debonding damaged prestressed girder-deck systems. Since the strands are debonding from surrounding concrete over a certain zone over the length of the beam, the increase of strain in strands can be linked with a ratio ψ, which is Lp/c. The analytical model was proposed and developed regarding the ratio ψ. By conducting procedure of calculating ψ, the ψ value varies from 9.3 to 70.1. Multiple nonlinear regression analysis was performed in Software IBM SPSS Statistics 27.0.1 to derive equation of ψ. ψ equation was curved to be an exponential function, and the independent variable (X) is a linear function in terms of three variables of debonding level (λ), span length (L), and amount of strengthening material (As). The coefficient of determinate (R2) for curve fitting in nonlinear regression analysis is 0.8768. The developed analytical model was compared to the ultimate capacities computed by FEA model.

Long-term behavior of segmentally-erected prestressed concrete box-girder bridges

  • Hedjazi, S.;Rahai, A.;Sennah, K.
    • Structural Engineering and Mechanics
    • /
    • v.20 no.6
    • /
    • pp.673-693
    • /
    • 2005
  • A general step-by-step simulation for the time-dependent analysis of segmentally-erected prestressed concrete box-girder bridges is presented. A three dimensional finite-element model for the balanced-cantilever construction of segmental bridges, including effects of the load history, material nonlinearity, creep, shrinkage, and aging of concrete and the relaxation of prestressing steel was developed using ABAQUS software. The models included three-dimensional shell elements to model the box-girder walls and Rebar elements representing the prestressing tendons. The step-by-step procedure allows simulating the construction stages, effects of time-dependent deformations of materials and changes in the structural system of the bridges. The structural responses during construction and throughout the service life were traced. A comparison of the developed computer simulation with available experimental results was conducted and good agreement was found. Deflection of the bridge deck, changes in stresses and strains and the redistribution of internal forces were calculated for different examples of bridges, built by the balanced-cantilever method, over thirty-year duration. Significant time-dependent effects on the bridge deflections and redistribution of internal forces and stresses were observed. The ultimate load carrying capacities of the bridges and the behavior before collapse were also determined. It was observed that the ultimate load carrying capacity of such bridges decreases with time as a result of time-dependent effects.

Longitudinal Behavior of Prestressed Steel-Box-Girder Bridge (프리스트레스를 도입한 강합성형 교량의 교축방향 거동)

  • Park, Nam Hoi;Kang, Young Jong;Lee, Man Seop;Go, Seok Bong
    • Journal of Korean Society of Steel Construction
    • /
    • v.15 no.3
    • /
    • pp.321-329
    • /
    • 2003
  • To effectively use the cross section of concrete decks, analytical and experimental studies on prestressed steel-box-girder bridges were performed in this study. The method of applying prestress was determined in the analytical study and the longitudinal behavior of the prestressed steel-box-girder bridge was considered in the experimental study. The object model for these studies was a two-span continuous bridge. The method of applying prestress determined herein was divided into two parts: one is that apply prestress to the concrete deck at its intermediate support, and the other is that apply prestress to the lower flange of the steel-box-girder bridge at its end support. The prototype bridge for the experiment was simulated based on the rule of similitude and was fabricated according to construction steps to apply prestress effectively. From the results of the experimental study, it has demonstrated that the prestressed steel-box-girder bridge provides better performance than the general steel-box-girder bridge in view of the increase of the design live load, the reduction of the tensile stress of the concrete deck at intermediate support, and the reduction of the displacement.

Spline Finite Strip Shell Analysis of Prestressed Concrete Box-Girder Bridges (프리스트레스트 콘크리트 박스 거더 교량의 Spline 유한대판 쉘 해석)

  • 최창근;김경호;홍현석
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2001.04a
    • /
    • pp.18-25
    • /
    • 2001
  • Analysis of prestressed box-girder bridges using the spline finite strip method is presented. In the present study, the spline finite strip method(FSM) is modified using the non-periodic B-spline interpolation. In the analysis of the prestressed box girder bridges, each tendon force is evaluated by summation of the adjacent segment forces. Once the equivalent forces acting on the structure at the tendon points are found, they are transformed into statically equivalent forces at the adjacent node or joints. Several examples were analyzed to verify the performance of present method using the non-periodic B-spline FSM. Good agreements were obtained when compared with the previous study.

  • PDF

A Study on the Time-dependent Characteristics of Prestressed Concrete Box-Girder Bridge (프리스트레스트 콘크리트 박스거더 교량이 시간의존적 특성에 관한 연구)

  • 윤영수;이만섭;최한태
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10b
    • /
    • pp.674-679
    • /
    • 1998
  • In designing the prestressed concrete box-bridge, the dead load, prestressing force, creep and shrinkage of concrete are the main factors which influence the camber and deflection of segmental concrete structure under construction. Among these factors the creep and shrinkage are the functions of the time-dependent property which, therefore, must be considered with time. The prediction model for estimating creep and shrinkage of concrete has been suggested by ACI, CEB/FIP, JSCE and KSCE design code and EMM, AEMM, RCM, IDM and SSM has been suggested for analytical method in consideration of the time-dependent characteristics. In this study, the creep test was carried out for four curing ages of concrete which were applied to the prestressed concrete structure at a construction site, and the results of test were compared to the values of creep prediction by the design code. Also the creep test of step-wise incremental stresses were performed and were compared to analytical methods.

  • PDF