• Title/Summary/Keyword: Preliminary Cost Management

Search Result 106, Processing Time 0.024 seconds

Decision Making of Seismic Performance Management Using Seismic Risk Assessment (지진위험도평가 방법을 이용한 내진성능관리 의사결정)

  • Kim, Dong Joo;Choi, Ji Hye;Kim, Byeong Hwa
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.23 no.6
    • /
    • pp.329-339
    • /
    • 2019
  • The strategy for the management of earthquakes is shifting from post recovery to prevention; therefore, seismic performance management requires quantitative predictions of damage and the establishment of strategies for initial responses to earthquakes. Currently, seismic performance evaluation for seismic management in Korea consists of two stages: preliminary evaluation and detailed evaluation. Also, the priority of seismic performance management is determined in accordance with the preliminary evaluation. As a deterministic method, preliminary evaluation quantifies the physical condition and socio-economic importance of a facility by various predetermined indices, and the priority is decided by the relative value of the indices; however, with the deterministic method it is difficult to consider any uncertainty related to the return-year, epicenter, and propagation of seismic energy. Also this method cannot support tasks such as quantitative socio-economic damage and the provision of data for initial responses to earthquakes. Moreover, indirect damage is often greater than direct damage; therefore, a method to quantify damage is needed to enhance accuracy. In this paper, a Seismic Risk Assessment is used to quantify the cost of damage of road facilities in Pohang city and to support decision making.

A Study on the Model of Artificial Neural Network for Construction Cost Estimation of Educational Facilities at Conceptual Stage (교육시설의 개념단계 공사비예측을 위한 인공신경망모델 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Chung-Yung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.91-99
    • /
    • 2006
  • The purpose of this study is propose an Artificial Neural Network(ANN) model for the construction estimate of the public educational facility at conceptual stage. The current method for the preliminary cost estimate of the public educational facility uses a single-parameter which is based on basic criteria such as a gross floor area. However, its accuracy is low due to the nature of the method. When the difference between the conceptual estimate and detailed estimate is huge, the project has to be modified to meet the established budget. Thus, the ANN model is developed by using multi-parameters in order to estimate the project budget cost more accurately. The result of the research shows 6.82% of the testing error rates when the developed model was tested. The error rates and the error range of the developed model are smaller than those of the general preliminary estimating model at conceptual stage. Since the proposed ANN model was trained using the detailed estimate information of the past 5 years' school construction data, it is expected to forecast the school project cost accurately.

A Preliminary Studty on the Efficient Management Manpower Staffing According to the Building Size -Focused on Office Buildings- (건축규모에 따른 관리인력의 효율적 배치에 관한 기초연구 -오피스 건물을 중심으로-)

  • Lee, Won-Suk;Kim, Shin-Eun;Kim, Sun-Kuk;Lee, Dong-Hoon;Won, Il-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.191-194
    • /
    • 2010
  • Construction companies are now trying a variety of cost-cutting strategies in the midst of recent slump of construction market. Notably, contract workers and local hires are accounting for increasing portion of management manpower as a part of their cost-reduction drive. However, construction site manpower researches to date have focused primarily on productivity analysis of site laborers, with little attention to the productivity of site management resources. This study aims to analyze the staffing status of office building construction site management manpower in reference to project size. Conclusions herein will provide basic inputs for subsequent attempts to build a model to enable efficient staffing of construction site management manpower.

  • PDF

Building Facilities Management Using the Condition Prediction Process: A Case Study of Fiberglass Doors

  • Amani, Nima
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.47-52
    • /
    • 2014
  • In the last decades, Facility Management (FM) has established itself as a key building service factor.FM includes supporting services and organizing functions essential for maintaining, operating and managing physical component and material. The purpose of the paper is to develop an economical analysis for building facilities management during its service life based on limited cost. This method helps to facilities managers and engineers to make better decisions for reducing of facilities assessment costs and increasing the facilities' service life. This paper presents the preliminary development of a model involves three stages process namely data collection, economic computation and economic process optimization. This process was tested for fiberglass doors example in a building interior and exterior system. If executives can manage essential points effectively and make decisions according to a key performance index, cost can be optimized and safety can be enhanced for installation building.

A Preliminary Study on the Determination of Road Maintenance for Each Region Using Multiple Regression Analysis

  • Kim, Kinam;Lee, Minjae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.618-619
    • /
    • 2015
  • The costs due to the maintenance and its method of national road have increased every year, and the maintenance costs have become higher due to the maintenance method without considering the characteristics of each region. This study is a preliminary study regarding the determination of maintenance method according to the characteristics of each region by applying variables (e.g. serviced time, traffic volume, average temperature, maximum temperature, minimum temperature, rainfall, and snowfall) to decide the maintenance and its method through the correlation analysis of road maintenance and repair period for each regional agency using the maintenance history data of national road management agency.

  • PDF

Cost-effectiveness Analysis for Clothing Design Improvement Using Ergonomic Methods: Evaluation of Flame-proof Clothing and Design Optimization (의복 개선 설계의 비용 대비 인간공학적 효과 분석: 방연복의 평가 및 최적 설계 도출)

  • Cho, Ja-Young;Jeong, Jung-Rim;Yeon, Soo-Min;Chang, Joon-Ho;You, Hee-Cheon;Kim, Hee-Eun
    • Journal of the Ergonomics Society of Korea
    • /
    • v.27 no.4
    • /
    • pp.45-58
    • /
    • 2008
  • Ergonomic techniques have been required to analyze the effectiveness of functional clothing design improvement in a systematic and analytic manner. The goals of the present study are to: (1) comprehensively and analytically examine the effectiveness of clothing improvement by using the relationship analysis between clothing design components (D) and ergonomic evaluation measures (E) and (2) prove the usefulness of cost-effectiveness analysis for clothing design optimization. The cost effectiveness analysis is comprised of the preliminary evaluation based on expertise and the in-depth evaluation where the D-E relationship analysis is applied. As a result of the cost effectiveness analysis applied to flame-proof clothing, an optimal design was identified by analyzing costs and qualitative/quantitative effects. In the preliminary evaluation, the expected effectiveness of each design alternative on wear efficiency and wear comfort was estimated. In the in-depth evaluation, however, the effectiveness of each design alternative was analyzed by quantitative evaluation in a wearing test using a questionnaire prepared based on the D-E relationship analysis. It was concluded that the D-E relationship analysis and the cost-effectiveness analysis are useful for comprehensive evaluation and optimization of functional clothing design.

Time and Cost Analysis for Highway Road Construction Project Using Artificial Neural Networks

  • Naik, M. Gopal;Radhika, V. Shiva Bala
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.26-31
    • /
    • 2015
  • Success of the construction companies is based on the successful completion of projects within the agreed cost and time limits. Artificial neural networks (ANN) have recently attracted much attention because of their ability to solve the qualitative and quantitative problems faced in the construction industry. For the estimation of cost and duration different ANN models were developed. The database consists of data collected from completed projects. The same data is normalised and used as inputs and targets for developing ANN models. The models are trained, tested and validated using MATLAB R2013a Software. The results obtained are the ANN predicted outputs which are compared with the actual data, from which deviation is calculated. For this purpose, two successfully completed highway road projects are considered. The Nftool (Neural network fitting tool) and Nntool (Neural network/ Data Manager) approaches are used in this study. Using Nftool with trainlm as training function and Nntool with trainbr as the training function, both the Projects A and B have been carried out. Statistical analysis is carried out for the developed models. The application of neural networks when forming a preliminary estimate, would reduce the time and cost of data processing. It helps the contractor to take the decision much easier.

A Preliminary Study of the evaluating and improving WLCM for construction project based on BIM (BIM기반 프로젝트의 WLCM (Whole Life-Cycle Management) 적용모델 개발을 위한 기초연구)

  • Lee, Geun-Ho;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.13-14
    • /
    • 2011
  • The main purpose of this research is to propose standardization of construction components design with BIM and to develop WLCM Framework and Application System for supply chain management on interaction of stakeholders based on proposed standard component. To accomplish main purpose of this research, we planned three years period, in first year, we will develop model for building lifecycle based on BIM, and this model can give the chance of collaboration with stakeholders of building project. In second year, we will develop WLCM system with model, and to improve performance of application model/system. This study can contribute on reduction of whole lifecycle cost, with preventing omission of factors on cost reduction possibility, develop concurrent engineering framework for construction stakeholders with proposed BIM.

  • PDF

GIS AND WEB-BASED DSS FOR PRELIMINARY TMDL DEVELOPMENT

  • Choi, Jin-Yong;Bernard A. Engel;Yoon, Kwang-Sik
    • Water Engineering Research
    • /
    • v.4 no.1
    • /
    • pp.19-30
    • /
    • 2003
  • TMDL development and implementation have great potential fur use in efforts to improve water quality management, but the TMDL approach still has several difficulties to overcome in terms of cost, time requirements, and suitable methodologies. A well-defined prioritization approach for identifying watersheds of concern among several tar-get locations that would benefit from TMDL development and implementation, based on a simple screening approach, could be a major step in solving some of these difficulties. Therefore, a web-based decision support system (DSS) was developed to help identify areas within watersheds that might be priority areas for TMDL development. The DSS includes a graphical user interface based on the HTML protocol, hydrological models, databases, and geographic information system (GIS) capabilities. The DSS has a hydrological model that can estimate non-point source pollution loading based on over 30 years of daily direct runoff using the curve number method and pollutant event mean concentration data. The DSS provides comprehensive output analysis tools using charts and tables, and also provides probability analysis and best management practice cost estimation. In conclusion, the DSS is a simple, affordable tool for the preliminary study of TMDL development via the Internet, and the DSS web site can also be used as an information web server for education related to TMDL.

  • PDF

Trick or Treat? Equity Concerns in the Preliminary Feasibility Study of the Republic of Korea

  • LEE, JONGYEARN
    • KDI Journal of Economic Policy
    • /
    • v.42 no.4
    • /
    • pp.91-116
    • /
    • 2020
  • As a project appraisal tool, the preliminary feasibility study (PFS) has contributed to enhancing the efficiency of public investment decision-making in the Republic of Korea over the last two decades. To overcome the limitations of the efficiency-oriented cost-benefit analysis, the PFS accommodates equity concerns among regions, namely balanced regional development (BRD) analysis. This study attempts to gauge the contributions of BRD analysis to PFS results. Specifically, it addresses how effectively policy efforts to promote decision-making have been implemented in the PFS stage while also considering the balance between equity and efficiency in terms of the trade-off between them, the degree to which they influence the results, and whether the consideration of equity is in fact actually reflected in seriously underdeveloped regions as intended. The study finds that the PFS results over the last two decades have been largely in line with the background and policy objectives. Based on the findings of the study, needs for institutional improvement are suggested, including enhancements in the analysis of regional economic ripple effects and taking into account the psychological factors pertaining to the evaluators in the overall judgment.