Time Series Analysis and Forecast for Labor Cost of Actual Cost Data (시계열분석을 통한 실적공사비의 노무비 분석 및 예측에 관한 연구)

  • Lee, Hyun-Seok;Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.24-34
    • /
    • 2013
  • Since 2004, the government decided to gradually introduce Actual Cost Data into cost estimate for improving problems of below-cost tendering and to reflect fair market price through competition and carry contract efficiently. However, there are many concerns that Actual Cost Data has not reflected real market price, even that has contributed to reduce the government's budget. General construction firm's burden for labor cost is imputed to specialty contractors and eventually it becomes construction worker's burden. Therefore, realization of Actual Cost Data is very important factor to settle this system. To understand realization level and make short term forecast, this paper drew construction group of which labor cost constitutes more than 95% of direct cost, and compares their Actual Cost Data with relevant skilled workers's unit wage and predicts using time series analysis. The bid price which is not be reflected market price accelerates work environment changes and leads to directly affect such as late disbursement of wages, bankruptcy to workers. Therefore this paper is expected to be used to the preliminary data for solving the problem and establishing improvement of Actual Cost Data.

An Analysis of Differences between Contract Costs Estimated by the Actual-Cost-Data-based Method and the Quantity-based Method (실적공사비적산제도 도입에 따른 도급금액 변동 분석)

  • Park Chang-Bae;Kim Dong-Young;Kim Ju-Hyung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.510-514
    • /
    • 2004
  • This research is a preliminary one to investigate transitional problems of actual-cost-date-based contract cost estimation method and suggestions for counteracting them. As parts of it, in this paper, the brief background and methods of the new method and contract costs estimated by introducing it are presented. The results of five projects' contract costs are compared to those estimated by the conventional quantity-based method. Comparison of the both is conducted in terms of total contract costs and contract costs according to type of sub-contracts. Finally, the propositional differences of the later to the former are analysed.

  • PDF

Preliminary Study on the Necessity of Safe Management for Small Construction Sites (소규모 건축현장의 안전관리 필요성에 대한 기초연구)

  • Lim, Jung-Min;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.141-142
    • /
    • 2011
  • This study is a relatively small scale compared to the massive construction company, construction company's safety management level of the low. A small architectural scene safety management is a necessity for basic research as a whole and of 67.20% died in the disaster, which killed the disaster scene in a small building. Small construction site for a reflections of the prevailing security situation, the existing literature and statistical data to determine what the issue, for the purpose of the proposal and come up with improvement measures.

  • PDF

Economic Evaluation according to Construction and Curtain Wall Mullion as a Rail (멀리온을 레일로 활용한 커튼월의 시공에 따른 경제성 평가)

  • Jung, Ui-In;Hong, Sang-Hun;Kong, Hee-Min;Kim, Bong-Joo;Yeom, Sang-Su;Kang, Hui-Tae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.17-18
    • /
    • 2016
  • Today, many kind of buildings are higher than those of previous generations, and Curtain Wall is adapted broadly as an outer wall material. But weather and environmental condition could cause problems in curtain wall construction in most construction projects. High wind speed and unplanned lifting equipment's allocation could cause construction delay and cost increase. To solve these problems, we suggest using a curtain wall mullion as a rail to lift curtain wall which is less affected wind speed. And we would like to show a preliminary data of its economic advantage evaluation.

  • PDF

Building Facilities Management Using the Condition Prediction Process: A Case Study of Fiberglass Doors

  • Amani, Nima
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.47-52
    • /
    • 2014
  • In the last decades, Facility Management (FM) has established itself as a key building service factor.FM includes supporting services and organizing functions essential for maintaining, operating and managing physical component and material. The purpose of the paper is to develop an economical analysis for building facilities management during its service life based on limited cost. This method helps to facilities managers and engineers to make better decisions for reducing of facilities assessment costs and increasing the facilities' service life. This paper presents the preliminary development of a model involves three stages process namely data collection, economic computation and economic process optimization. This process was tested for fiberglass doors example in a building interior and exterior system. If executives can manage essential points effectively and make decisions according to a key performance index, cost can be optimized and safety can be enhanced for installation building.

A study on the status and improvement of preliminary feasibility study of culture and tourism projects (문화.관광부분사업의 예비타당성조사 실태분석 및 개선방안 연구 -운용관리비용 분석을 중심으로-)

  • Sun, Shu-Li;Kim, Ju-Hyung;Shin, Sung-Wooi;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.129-138
    • /
    • 2007
  • According to the preceding research outcomes, feasibility studies on public construction projects were incorrect and subjective. To resolve the problems, Korean government initiated Preliminary Feasibility Study (PFS) system prior to undertaking the main feasibility study. The PSF can be categorized into four areas such as road, railroad, harbor, airport, and Culture & Tourism (C&T). Especially when it comes to complex due to the introduction of five-weekday working system and local $government^{\circ}{\phi}s$ self administrative system. As a result, the standardization and legislation of the PSF can not be operated effectively. Accordingly this paper seeks to 1) identify actual condition of conducted PSF in C&T; 2) set up analytical model considering cost factor of economical efficiency and seek obstacles of PSF system; 3) suggest improvement plan for construction PSF projects.

Preliminary Analysis on Artificial Intelligence-based Methodology for Selecting Repair and Rehabilitation Methods of Bridges (인공지능 기반의 교량 보수공법 선정 기술 개발을 위한 선행 분석)

  • Kim, Jonghyeob;Jung, In-Su;Yun, Won-Gun;Kim, Jung-Yeol;Park, In-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.861-872
    • /
    • 2021
  • An efficient cost management is important for the domestic social overhead capital(SOC) based on a long lifecycle after 30 years since completion. Maintenance in South Korea have had the restrictions of consistency and suitability of decision-making by the establishment of a budget plan based on the company estimate and repair and reinforcement methods determined by the inspection and diagnosis engineers' subjective determination for each facility. To resolve this issue, the Korea Institute of Civil Engineering and Building Technology is currently in development of a methodology to propose an optimum maintenance method according to the damage of components by artificial intelligence. This study has deduced the primary factors by analyzing information generated during bridge maintenance and management as a prior step for the development of technologies, and conducted a preliminary analysis to select the optimum artificial intelligence technology.

Improvement Factors of Promoter Selection Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 평가기준 개선 요인 분석)

  • Shin, Hyun-In;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.310-316
    • /
    • 2006
  • Since 'Act on Private Participation in Infrastructure' were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation in Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of Promoter. However, score for cost is likely to influence selecting Promoter to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for selecting Promoter in BTL projects, and proposed improvement factors by doing questionnaire over specialists of each field.

  • PDF

The Process for Development of the Optimum Layout Model in Slab Formwork of High-rise Building Construction (초고층 건축공사의 바닥거푸집 최적배치 모델 구축 프로세스 연구)

  • Cha, Minsoo;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.171-172
    • /
    • 2011
  • Formwork accounts for a large proportion of the framework in high-rise construction projects in terms of the duration and cost. Especially, slab formwork has a significant influence on these factors. However, the current selection of formwork method in general contractors depends on the decisions of few experienced engineers, and layout planning of the formwork in specialty contractors requires lots of time by different floor types. As a preliminary study for developing an optimum layout model in slab formwork of high-rise building construction, this study proposes the process of the optimum layout model and determines a fitness function for use of the genetic algorithm aimed at table formwork.

  • PDF

A Study on the Rationalization of Management and Maintenance Cost for Railway Investment Assessment - Focus on High Speed Railway - (철도투자평가를 위한 운영.유지보수비용 합리화 방안 - 고속철도를 중심으로 -)

  • Suh, Sang-Kyo;Sung, Deok-Yong;Roh, Byoung-Kuk;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.331-340
    • /
    • 2009
  • This study is objected by suggesting rationalization method of management and maintenance cost for railway investment assessment. The estimate of rational benefit and cost are a work of vital importance to decide railway investment as preliminary feasibility investigation is institutionally reinforced since January 2007. In particular, railway management and maintenance cost have to be applied to realistic and detail cost as railway investment assessment guide. For example, types of railway, construction of new line, improvement of conventional line, double tracking, railway electrification. However, railway investment assessment is inconsistency because of estimating the railway management and maintenance cost using existing unrealistic management and maintenance cost. Therefore, this study is performed parametric analysis effecting on the railway management and maintenance cost considered new technique, enhanced facilities and improved standard. Also, it suggests the itemized standard management and maintenance cost. Finally, it will be helped to establish the base of railway investment through the rationalization method of management and maintenance cost.