• Title/Summary/Keyword: Precedence of the risk

Search Result 14, Processing Time 0.028 seconds

A Study on the Precedence of the Risk of Problem Features of Senile Dementia Patients (치매노인의 문제특성에 대한 위험순위에 관한 연구)

  • You, Ji-Hye;Lee, Hang-Woon;Eom, Jin-Sup;Park, Soo-Jun;Lee, Bong-Soo;Lee, Jeong-Whan;Tack, Gye-Rae;Chung, Soon-Cheol
    • Science of Emotion and Sensibility
    • /
    • v.10 no.1
    • /
    • pp.79-86
    • /
    • 2007
  • Selected cognitive ability test and survey of basic & problem characteristics were conducted on 110 hospitalized senile dementia patients to extract important problem features. Twenty important problem features were extracted by the factor analysis. In this study, the precedence of the risk of 20 problem features was determined for care of senile dementia patients. Questionnaire was conducted on 32 clinical psychologists who had experienced the diagnosis and treatment of senile dementia patients. Using AHP (Analytic Hierarchy Process), relative risk levels were studied and the precedence of risk was determined by making 20 important problem features in order of the risk. Results of two analyses indicated that during normal daily activities of senile dementia patients the cognitive problem such as memory impairment, judgement disorder and disorientation is the most dangerous risk factor.

  • PDF

Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building (보-기둥구조 PC공동주택 골조공사 작업관계 분석)

  • Kim, Ki-Ho;Kim, Jin-Won;Kim, MIn-Jun;Lee, Dong-Gun;Sohn, Jeong-Rak;Lee, Bum-Sik
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

Research on the assessment of the risk factors of serious railway accidents (철도 중대사고의 위험지수 추정에 관한 연구)

  • Han, Soon-Woo;Cho, Yun-Ok;Yoon, Hyuk-Jin;Kim, Sang-Ahm
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1871-1876
    • /
    • 2007
  • To establish the national railway safety system, the railway total safety technology development project has been promoted by Ministry of Construction and Transportation (MOCT) since August 2004. The project has producted successful results in many areas of railway safety, however, it is required that the research field should be re-examined to meet the aim of the project. To do that, the precedence of the investment of research resources should be reviewed and determined. The risk of serious railway accidents such as train collision, derailment and level crossing accidents are estimated. From the estimation result and the statistics on the railway accidents over fast few years, the risk factors of railway accidents can be calculated.

  • PDF

Development of a 4D Information based Integrated Management System for Geothermal Power Plant Drilling Project (지열발전 시추프로젝트의 4D 정보화기반 통합관리 시스템 개발)

  • Lee, Seung Soo;Kim, Kwang Yeom;Shin, Hyu-Soung
    • Tunnel and Underground Space
    • /
    • v.24 no.3
    • /
    • pp.234-242
    • /
    • 2014
  • Deep drilling project should be managed systematically and efficiently because it is significantly influenced by various related factors having uncertainty and high risk in terms of economy and effective management. In particular, drilling project involves participants from various sectors including necessary service company and it also needs their collaboration by sharing related information occurring at drilling process in order to secure efficient performance management. We developed 4D (3D + time) information based visualization system for progress management by combining 3D design model and predicted optimized control parameters for each section in geothermal well design. We also applied PDM (precedence diagramming method) to the system in order to setup the effective process model and hooked it up to 3D information based on precedence relation and required time for informatized process network.

Decision of Maintenance Priority Order for Substation Facility through Structural Importance and Fault Analysis (변전설비의 구조적 중요도와 고장 분석을 통한 유지보수 우선순위 선정)

  • Lee, Sung-Hun;Lee, Yun-Seong;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.4
    • /
    • pp.23-30
    • /
    • 2013
  • Reliability Centered Maintenance(RCM) is one of most widely used methods in the modern power system to schedule a maintenance cycle and determine the priority of inspection. A precedence study for the new structure of rearranged system should be performed due to introduction of additional installation. This paper proposes a new method to evaluate the priority of maintenance and inspection of the power system facilities. In order to calculate that risk index, it is required that the reliability block diagram should be analyzed for the power system. Additionally, a fault cause analysis is also performed through the event-tree analysis.

Assessing the Archaeoparasitological Potential of Quids As a Source Material for Immunodiagnostic Analyses

  • Morrow, Johnica J.;Reinhard, Karl J.
    • Parasites, Hosts and Diseases
    • /
    • v.54 no.5
    • /
    • pp.605-616
    • /
    • 2016
  • In the present study, quids from La Cueva de los Muertos Chiquitos (CMC) were subjected to ELISA tests for 2 protozoan parasites, Toxoplasma gondii (n=45) and Trypanosoma cruzi (n=43). The people who occupied CMC, the Loma San Gabriel, lived throughout much of present-day Durango and Zacatecas in Mexico. The known pathoecology of these people puts them into at-risk categories for the transmission of T. gondii and T. cruzi. Human antibodies created in response to these 2 parasites can be detected in modern saliva using ELISA kits intended for use with human serum. For these reasons, quids were reconstituted and subjected to ELISA testing. All test wells yielded negative results. These results could be a factor of improper methods because there is no precedence for this work in the existing literature. The results could equally be a simple matter of parasite absence among those people who occupied CMC. A final consideration is the taphonomy of human antibodies and whether or not ELISA is a sufficient method for recovering antibodies from archaeological contexts. An additional ELISA test targeting secretory IgA (sIgA) was conducted to further examine the failure to detect parasite-induced antibodies from quids. Herein, the methods used for quid preparation and ELISA procedures are described so that they can be further developed by future researchers. The results are discussed in light of the potential future of quid analysis.

A study on a schedule-cost analysis model for defense R&D project planning (국방 R&D프로젝트의 일정-비용분석모델의 연구)

  • 황홍석;류정철;정덕길
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF

The Japanese Encephalitis Vaccine: Worldwide and Korean Status (일본뇌염백신: 국제적 현황과 우리나라 현황)

  • Hong, Young Jin
    • Pediatric Infection and Vaccine
    • /
    • v.15 no.2
    • /
    • pp.108-114
    • /
    • 2008
  • Japanese encephalitis is the leading cause of viral encephalitis in Asia, where it accounts for up to 50,000 cases. Approximately 20% of affected patients die, and 30-50% of survivors have significant neurological sequelae. Inactivated mouse-brain derived Japanese encephalitis vaccines has been effectively implemented to control the disease effectively in Korea and several other Asian countries. However, the vaccine is expensive and difficult to produce, requires multiple doses, and has been associated with hypersensitivity reactions and rare adverse neurologicale events. The live-attenuated SA14-14-2 vaccine derived from primary hamster kidney (PHK) cells was developed in China and has been used there since 1988. Outside China, it has been licensed and used in Korea and several other Asian countries. This vaccine is effective and inexpensive. However, the lack of precedence for using a PHK cell substrate in a live-attenuated vaccine is a special issue of concern. The WHO working group has recommended additional safety studies in selected high-risk groups, as well as ongoing post-marketing studies to ensure long-term safety. Recently, a new inactivated vaccine and live-attenuated chimeric vaccine have been developed from vero cells. With this background, this article summarized the current status of Japanese encephalitis vaccination worldwide and in Korea.

  • PDF

Health Inequalities Among Korean Employees

  • Choi, Eunsuk
    • Safety and Health at Work
    • /
    • v.8 no.4
    • /
    • pp.371-377
    • /
    • 2017
  • Background: Social status might be a determinant of occupational health inequalities. This study analyzed the effects of social status on both work environments and health outcomes. Methods: The study sample consisted of 27,598 wage employees aged 15 years and older from among the Korean Working Condition Survey participants in 2011. Work environments included atypical work, physical risks, ergonomic risks, work demands, work autonomy, social supports, and job rewards. Health outcomes comprised general health, health and safety at risk because of work, the World Health Organization-5 Well-being Index, work-related musculoskeletal disease, and work-related injury. Multivariable logistic-regression models were used to identify the associations between social status and work environments and health outcomes. Results: Employees in the demographically vulnerable group had lower occupational status compared with their counterparts. Low social status was largely related to adverse work environments. Especially, precarious employment and manual labor occupation were associated with both adverse work environments and poor health outcomes. Conclusion: Precarious and manual workers should take precedence in occupational health equity policies and interventions. Their cumulative vulnerability, which is connected to demographics, occupational status, adverse work environments, or poor health outcomes, can be improved through a multilevel approach such as labor market, organizations, and individual goals.

A Study on Risk Assessments and Protection Improvement for Electric Power Infrastructures against High-altitude Electromagnetic Pulse (전력기반시설의 고 고도 핵 전자기파에 대한 위험성 검토 및 방호 개선방안 연구)

  • Chung, Yeon-Choon
    • Convergence Security Journal
    • /
    • v.19 no.3
    • /
    • pp.43-50
    • /
    • 2019
  • In a hyper-connected society, electric power infrastructures and information and communication infrastructures are the core of critical national infrastructures. However, electric power infrastructure is very deadly to high-frequency nuclear electromagnetic pulse (HEMP) threats recently issued by North Korea, so the resilience through rapid recovery after attack is directly related to the survivability of our country. Therefore, electric power infrastructure should take precedence over any other key infrastructure, with preemptive protection measures and fast recovery plans. In this paper, the characteristics of the HEMP threats was examined, and the risks and effective major protection measures of the electric power infrastructures are discussed. In the future, it is expected that it will be able to help establish the direction of enactment and revision of legal schems related to the 'high power EMP infringement prevention' for Korea's electric power infrastructures.